ML20236A151
| ML20236A151 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/15/1987 |
| From: | Lieberman J, Luehman J NRC OFFICE OF ENFORCEMENT (OE) |
| To: | |
| References | |
| EA-87-085, EA-87-85, EN-87-086, EN-87-86, NUDOCS 8710220076 | |
| Download: ML20236A151 (1) | |
Text
--
n October 15, 1987 q
b; EN 87-86 1
0FFICE OF ENFORCEMENT I
NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Florida Power and Light Company (EA 87-05) g (Turkey Point, Units 3 and 4) s Docket Nos. 504 50g 50-251 gg subject:
ORDER AND NOTICE OF VIOLATION AND PROPOSED IMPOSITION C2 b L
OF CIVIL PENALTY - $225,000
?
j This is to infom the Commission that an Order and Notice of Violation a ca" I
Proposed Imposition of Civil Penalty in the amount of Two Hundred and Tw y
Five Thousand Collars ($225,000) will be issued on or about October 19, 7
to Florida Power end Light Company.
The Order confirms the licensee's alan to
)
have an independent third party review activities at Turkey Point and t1e 1
company's corporate offices to determine the root causes of the facility's j
poor past performance. Further, the Order directs the licensee to put in i
place a corporate operations audit program until the results of the independent q
appraisal have been received.
The Notice of Violation and Proposed Imposition of Civil Penalty is based on three violations including (1) loss of emergency boration flow paths for b0th units because of the failure of operations personnel s
to use or follow approved procedures, (2) isolation of the backup nitrogen system for the Unit 4 Auxiliary Feedwater System flow control valves for approximate.ly 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />, again due to failure to follow approved procedures, and (3) operation of the Unit 3 Intake Cooling Water System outside the plant design basis because of poor communications among members of the plant staff.
I It should be noted that the licensee has not been specifically informed of the enforcement action.
The schedule of issuance and notification is:
l Mailing of Notice October 19, 1987 Telephone Notification of Licensee October 19, 1987 The State of Florida will be notified.
The licensee has thirty days from the date of the Notice in which to respond.
)
Followirg,NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.
Contact:
J. Luehman, OE 28822-J. Lieberman, OE 28214 Distribution:
H Street MNBB h 7)
Phillips //fD EW M Willste /, S'O Chairman ec ED0 NRR OSP NMSS Comm. Roberts DED/ROGR NRR Comm. Bernthal OGC Comm. Carr RM i
Comm. Rogers AEOD ACRS PA SECY i
OGC Air Rights M /L Regional Offices MAIL GPA SP RI //fb RIV /r To ADM: Doc. Mgt. Br.
CA RII g RV h re PDR OI RIII 411p RES OIA PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL PUBLICLY ANNSUNCED.
0 01710220076 871015
[1,M4 F4jm I 8cE EN-87-086 PDR g
_;