ML21034A597

From kanterella
Jump to navigation Jump to search
External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021
ML21034A597
Person / Time
Site: Surry, North Anna, 05200017, 05200008  Dominion icon.png
Issue date: 02/10/2021
From: Atkinson R
Dominion Energy Co
To:
Office of Nuclear Material Safety and Safeguards
C. Cheung 301-415-3813
References
Download: ML21034A597 (7)


Text

Dominion Energy SLR Digital I&C Project Update NRC ISG-06 Meeting February 10, 2021 Robert Atkinson Senior Generation Project Manager - SLR 1

Digital I&C Vision

  • Vision

- Full replacement of major I&C systems at Surry and North Anna Power Stations

  • Phased approach
  • Digital team -> Operations, I&C, Engineering, Management
  • Surry will lead -> North Anna to lag

- Standardize on a common SR and NSR Platform

- Upgrade the MCR to soft control system

  • Build a second Simulator

- Upgrade Technical Specifications/UFSAR 2

Drivers for the Digital I&C Project

  • Drivers for making the changes
  • Obsolescence and sustainability
  • Single point vulnerabilities
  • I&C Technicians
  • Engineering
  • Goal is to reduce O&M costs
  • Labor reduction
  • Harvesting person-hours
  • Increased future Operator proficiency
  • Automation and Enhancements 3

Benefits

  • Benefits

- Maintenance

  • Condition based
  • Reduced training

- Engineering

  • Diagnostics and fault detection
  • Plant/system performance and health monitoring
  • Measurement precision improvements

- Operations - enhanced Operator interface

  • Automated control functions
  • Condition-based alarms
  • Human Factor Engineered MCR changes

- Simplified Operator training 4

Benchmarking

  • Key takeaways

- Must include MCR in upgrades

- Leverage automation

  • Fewer Operator person-hours needed
  • Much less expensive up front

- Organizational changes

  • Digital team established

- Training - train the Operators, I&C, Engineering and Management

- Must develop a comprehensive digital life-cycle plan 5

Major Systems In Digital I&C Scope Safety Related Non-Safety Related Non-Safety Related RPS NSSS Control/BOP MCR/Existing Simulator Process Protection Analog RPI Rod Control Logic ESFAS Feedwater Heater Plant Computer EDG Controls/Sequencer Annunciators Cond. Polishing RVLIS/ICCM Alternate AC Diesel AMSAC Nuclear Instrumentation Cyber Security Second Simulator Cyber Secure Test Facility 6

Summary

  • Current Activities

- Selecting Vendor for Project

  • Schedule

- First installations Fall of 2022

- Five Phases

  • Will extensively utilize innage work scope

- Project Completion - 2028 for Surry Power Station

  • North Anna Completion - 2031 7