ML112770135

From kanterella
Jump to navigation Jump to search
Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11
ML112770135
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/03/2011
From: Annette Vietti-Cook
NRC/SECY
To: Heacock D
Dominion
References
Download: ML112770135 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SECRETARY October 3, 2011 David Heacock President and Chief Nuclear Officer Dominion Nuclear 5000 Dominion Blvd.

Glenn Allen, VA 23060

Dear Mr. Heacock:

The Commission looks forward to meeting with you to discuss your plans for restart of the North Anna nuclear plant. The meeting will be held on October 21, 2011, from 9:00 a.m. to approximately 11 :30 a.m. in the Commission's Conference Room on the first floor of the NRC's headquarters building at One White Flint North, Rockville, Maryland. The Commission will hear from you on North Anna restart readiness activities and the NRC staff on the results of the staff's inspection and technical reviews. I am enclosing a copy of the draft meeting agenda for your information (enclosure 1).

To assist the Commission in preparing for the meeting, please e-mail any written material, including slides/viewgraphs, to Ms. Rochelle Bavol and Ms. Sandy Joosten (rochelle.bavol@nrc.gov and sandy.joosten@nrc.gov) in the Office of the Secretary, by October 13, 2011, so that it can be distributed to the Commission for review in advance of the meeting. Enclosed are guidelines for slides, if you choose to use them (enclosure 2).

PowerPoint is the preferred format, but other electronic presentation formats may be used. This Commission meeting will be webcast live at the Web address: www.nrc.gov. If you intend to use slides, they will also be posted on the NRC website prior to the meeting. If YOl.i have any questions, please contact Ms. Bavol at 301-415-1651.

Your presentation at the Commission meeting should be based on the assumption that Commissioners are familiar with the content of your written material. Please plan your oral presentation for 60 minutes or less, discussing the important points on which you wish to focus the Commission's attention.

The NRC Headquarters building is located opposite the White Flint Metro Station on Rockville Pike and Marinelli Drive, Rockville, Maryland. The White Flint Metro Station is on the Red Line of the Washington area subway system. Reserved visitor parking for Commission guests is available. If you wish to use reserved parking, please notify Ms. Bavol in advance. If reserved parking has been arranged, please check-in with the security staff at the entrance to the NRC campus on Marinelli Drive when you arrive. A Security Guard will call for an escort. Please

note that visitors will be screened through metal detectors, will have their packages x-rayed, and will be required to present a picture identification card prior to signing in at the registration desk.

~cerely,

~~-~

Annette L. Vietti-Cook Secretary of the Commission

Enclosures:

1. Draft Agenda
2. Briefing Visuals Guidance

Enclosure 1 Draft: 10/3/11 SCHEDULING NOTE

Title:

BRIEFING ON NORTH ANNA (Public)

Purpose:

To inform the Commission of the actions taken by the licensee and NRC staff to determine restart readiness of the North Anna nuclear plant following the August 23, 2011, earthquake located in central Virginia.

Scheduled: October 21, 2011 9:00 am Duration: Approx. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, 25 minutes Location: Commissioners' Conference Room, 1st fl OWFN

Participants:

Presentation Dominion Nuclear 60 mins.*

David Heacock, President and Chief Nuclear Officer, Dominion Nuclear Gene Grecheck, Vice President of Nuclear Development, Dominion Nuclear Other Dominion/North Anna executives joining Mr. Heacock and Mr. Grecheck at the table, but not making formal presentations: TBD Topic: North Anna restart readiness activities NRC Staff Panel 30 mins.*

Bill Borchardt, Executive Director for Operations Victor McCree, Regional Administrator, Region II Eric Leeds, Director, Office of Nuclear Reactor Regulation Others TBD Topic: Results of staff's inspection and technical reviews Commission Q & A 50 mins.

Discussion - Wrap-up 5 mins.

1

Enclosure 1

  • For presentation only and does not include time for Commission Q & A's Documents:

Staff background material due to SECY: October 7,2011 Slides due to SECY: October 13, 2011 2

Enclosure 2 PRESENTATION TITLE Arial Black 40 on white background Date of Briefing Your name, title, office Arial Black 32

Slide Title - Arial Black 36

  • Text (Arial Black 32) on white.
  • Top and Side margins 1 inch min.
  • Bottom margin 2 inch min.
  • Number pages
  • Explain acronyms or include a separate slide with list 2