New Fuel Storage Rack & SFP Criticality Analysis for April 26th 2016 Scheduled Category 1, Pre-Submittal Public Teleconference
ML16104A382
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/26/2016
From:
Dominion
To:
Office of Nuclear Reactor Regulation
Sreenivas V
References
Download: ML16104A382 (9)


Text

North Anna Power Station New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request NRC Pre-Submittal Meeting April 26, 2016

Agenda

  • Proposed Changes
  • Analysis Goals
  • Criticality Analysis Checklist
  • Conservatism
  • Conclusion/Timeline 2

2

Current NAPS SFP Configuration

  • One rack cell design, 4.6 w/o U-235 maximum enrichment, 1737 total cells
  • Flux-trap with Boraflex, 10.56 inch pitch

- No credit for Boraflex

- Credit for soluble boron

  • Region 1 (4 out of 4 storage, one burnup curve)
  • Region 2 (5x5, one empty cell, one burnup curve)

- Cell blocker in center cell 3

3

Current NAPS SFP Configuration (contd.)

  • Current Region 2 (5x5) 4 4

Proposed Changes

  • Increase enrichment limit to 5.0 w/o U-235

- Enhance core design flexibility

  • Simplify Region configuration
  • Region 1

- 2 out of 4 storage, no burnup requirement

  • Region 2

- 4 out of 4 storage

- One burnup curve for low decay time

- One burnup curve for 3 year decay time

  • No installed neutron absorber credit 5

5

Analysis Goals

  • Incorporate recent criticality issues and improvements
  • Increase identified margin
  • Consistent with the Criticality Analysis Checklist 6

6

Criticality Analysis Checklist*

  • Follows expected criticality analysis report format
  • Includes placeholders for analysis Scope, Methods, and Details
  • Shaded bars indicate major Sections
  • Indentation indicates a subtopic

- Element within a topic or group

  • Indicates some elements NOT included or NOT applicable

- Justification or explanation provided 7

  • Previously provided to NRC Staff; Available upon request

Conservatism

  • NRC administrative margin of 0.01 K reserved to account for minor current and/or emergent methodology issues and uncertainties
  • Identify Dominion retained margin to allow for future design changes and/or methodology issues 8

8

Conclusion / Timeline

  • A North Anna SFP and new fuel rack criticality analysis License Amendment Request will seek to increase maximum fuel enrichment, simplify storage configurations, and increase identified margin to keff limits
  • Major milestones:

- Submit LAR to NRC Sept 2016

- Receive SER Sept 2018

- Shuffle fuel 4 Q 2018

- Implement new TS 4 Q 2018 9

9

North Anna Power Station New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request NRC Pre-Submittal Meeting April 26, 2016

Agenda

  • Proposed Changes
  • Analysis Goals
  • Criticality Analysis Checklist
  • Conservatism
  • Conclusion/Timeline 2

2

Current NAPS SFP Configuration

  • One rack cell design, 4.6 w/o U-235 maximum enrichment, 1737 total cells
  • Flux-trap with Boraflex, 10.56 inch pitch

- No credit for Boraflex

- Credit for soluble boron

  • Region 1 (4 out of 4 storage, one burnup curve)
  • Region 2 (5x5, one empty cell, one burnup curve)

- Cell blocker in center cell 3

3

Current NAPS SFP Configuration (contd.)

  • Current Region 2 (5x5) 4 4

Proposed Changes

  • Increase enrichment limit to 5.0 w/o U-235

- Enhance core design flexibility

  • Simplify Region configuration
  • Region 1

- 2 out of 4 storage, no burnup requirement

  • Region 2

- 4 out of 4 storage

- One burnup curve for low decay time

- One burnup curve for 3 year decay time

  • No installed neutron absorber credit 5

5

Analysis Goals

  • Incorporate recent criticality issues and improvements
  • Increase identified margin
  • Consistent with the Criticality Analysis Checklist 6

6

Criticality Analysis Checklist*

  • Follows expected criticality analysis report format
  • Includes placeholders for analysis Scope, Methods, and Details
  • Shaded bars indicate major Sections
  • Indentation indicates a subtopic

- Element within a topic or group

  • Indicates some elements NOT included or NOT applicable

- Justification or explanation provided 7

  • Previously provided to NRC Staff; Available upon request

Conservatism

  • NRC administrative margin of 0.01 K reserved to account for minor current and/or emergent methodology issues and uncertainties
  • Identify Dominion retained margin to allow for future design changes and/or methodology issues 8

8

Conclusion / Timeline

  • A North Anna SFP and new fuel rack criticality analysis License Amendment Request will seek to increase maximum fuel enrichment, simplify storage configurations, and increase identified margin to keff limits
  • Major milestones:

- Submit LAR to NRC Sept 2016

- Receive SER Sept 2018

- Shuffle fuel 4 Q 2018

- Implement new TS 4 Q 2018 9

9