Letter Sequence RAI |
---|
|
Results
Other: ML20132G986, ML20133G926, ML20134C649, ML20134F459, ML20134M332, ML20135B469, ML20137R696, ML20147J409, ML20149J361, ML20202C179, ML20202F441, ML20204C515, ML20237E181, ML20247M379, ML20249B858
|
MONTHYEARML20129D9751996-10-23023 October 1996 Forwards Addl Comments on Response to Request for Addl Info Re Plant ISFSI Final Survey Plan Project stage: RAI ML20134F4591996-10-30030 October 1996 Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site Project stage: Other ML20134M3321996-11-20020 November 1996 Grants Preliminary Approval of Trojan ISFSI Physical Security Plan Project stage: Other ML20135B4691996-11-27027 November 1996 Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl Project stage: Other ML20132G9861996-12-12012 December 1996 Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described Project stage: Other ML20133G9261997-01-14014 January 1997 Advises That Info Contained in Ltr Will Be Withheld from Public Disclosure Ref 10CFR2.790,per Request Project stage: Other ML20134C6491997-01-30030 January 1997 Concurs That Addl Info & Attachment III to Pge Be Withheld from Public Disclosure Per 10CFR2.790 as Requested Project stage: Other ML20137P7431997-04-0404 April 1997 Informs That Info Provided in Response to NRC RAI & Calculations & Drawings,Discussed in 970310 Affidavit,Will Be Withheld from Public Project stage: RAI ML20137R6961997-04-10010 April 1997 Denies Request to Withhold Listed Info from Public Disclosure Because Info Does Not Meet Requirements of 10CFR2.790 Project stage: Other ML20147J4091997-05-0202 May 1997 Informs That Documents Contained in Affidavit Executed 970318 from Sierra Nuclear Corp,Will Be Withheld from Public Disclosure,Per 10CFR2.790 Project stage: Other IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests Project stage: Request ML20149J3611997-07-24024 July 1997 Informs That Calculations Submitted in Support of Trojan ISFSI Application,Discussed in 970501 Affidavit,Will Be Withheld from Public Disclosure Project stage: Other ML20202C1791998-02-0909 February 1998 Returns Responses to 970731 RAI-2 Re 960326 Application for Trojan Isfsi,Due to Overall Poor Quality.Proprietary Documents Are Being Returned Under Separate Cover as Required Affidavits Were Not Provided Project stage: Other ML20202F4411998-02-10010 February 1998 Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period Project stage: Other ML20247M3791998-05-13013 May 1998 Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 2 Project stage: Other ML20249B8581998-06-18018 June 1998 Informs That Tj Kobetz Has Assumed Project Management Responsbilities for Proposed Trojan Isfsi.Communications W/ NRC Should Be Directed to Tj Kobetz.Written Correspondence Should Continue to Go DCD Project stage: Other ML20237E1811998-08-25025 August 1998 Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-1536 Project stage: Other ML20155C5561998-10-28028 October 1998 Summary of 981008 Meeting with Portland General Electric in Rockville,Md Re Util 10CFR72 License Application.Attendance List,Agenda & Slide Presentation Matl,Encl Project stage: Meeting ML20198B7641998-12-16016 December 1998 Summary of 981119 Meeting with Util & NRC Re Issues Pertaining to Portland General Electric ISFSI Emergency Plan.Attendance List Encl Project stage: Meeting ML20204C5151999-03-17017 March 1999 Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas Project stage: Other 1997-05-02
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217E9711999-10-13013 October 1999 Submits Notification of Major Changes to Trojan Liquid Radioactive Waste Treatment Sys,Iaw PGE-1201.Detailed Description of Change Provided ML20217C8171999-10-0606 October 1999 Forwards Notice of Receipt of Availability for Comment & Meeting to Discuss License Termination Plan,Per 990805 Application ML20216F7621999-09-23023 September 1999 Forwards Corrected Response to Request 2 Contained in NRC 990920 RAI Re Application of Pacificorp for Transfer of License NPF-1.Response 2 Should Have Stated That Na General Partnership Is Partnership Formed in Nv ML20216F2871999-09-20020 September 1999 Informs NRC of Developments That Have Occurred Since 990524 Application Was Filed Re Pacificorp Transfer of License of FOL NPF-1.NRC Is Urged to Act & Approve Transaction Expeditiously by 990930.Supporting Documentation Encl ML20211Q3281999-09-0909 September 1999 Forwards Insp Rept 50-344/99-06 on 990630-0701,21 & 0408-08. No Violations Noted.Insp Conducted to Review Decommissioning Activities Underway at Trojan Site & to Accompany Shipment of Reactor Vessel to Hanford,Washington for Burial ML20211J2101999-08-30030 August 1999 Forwards Request for Addl Info Re Application for Approval of Proposed Corporate Merger of Pacificorp & Scottishpower ML20211B6611999-08-16016 August 1999 Forwards fitness-for-duty Program Performance Data Rept for Period of 990101-0630,IAW 10CFR26.71(d) ML20211B4091999-08-16016 August 1999 Forwards Environ Assessment & Finding No Significant Impact to Application for an Exemption & License Amend Dated 980129.Proposed Exemption & License Amend Would Delete Security Plan Requirements of 10CFR50.54(p) & 10CFR73.55 ML20211A7131999-08-16016 August 1999 Forwards Environ Assessment & Finding of No Significant Impact to Application for Exemption & License Amend Dtd 980827.Proposed Exemption & License Amend Would Delete EP Requirements of 10CFR50.54(q),10CFR50.47(b) & 10CFR50,app E ML20210R7691999-08-11011 August 1999 Forwards Proposed Rev 23 to PGE-8010, Trojan Nuclear QAP, in Response to NRC 990708 RAI Re Relocation of TS ACs to Qap.Revised QAP Will Be Made Effective Concurrently with Implementation of License Change Application Lca 245 ML20210H5971999-07-27027 July 1999 Forwards Notice of Consideration of Approval of Application Re Merger & Opportunity for Hearing.Notice Being Forwarded to Ofc of Fr for Publication ML20216D6611999-07-23023 July 1999 Submits Summary of Proprietary Submittals for Transtor Part 71 & Part 72 & Trojan ISFSI Applications ML20210F8601999-07-22022 July 1999 Forwards Rev 1 to PGE-1076, Trojan Reactor Vessel Package Sar. Changes to Rept Contained in Rev 1 Received NRC Approval by Ltr ML20210A6401999-07-19019 July 1999 Corrects Ref in Item 4 of Which Constitutes Rev 2 of Authorization from Wf Kane, for Trojan Reactor Vessel Package as Approved Package for Shipment Under General License,Subj to Listed Conditions ML20210B4481999-07-12012 July 1999 Forwards Rept Describing Effects of Earthquake That Occurred on 990702 Near Satsop,Wa,Iaw Trojan Nuclear Plant Defueled Sar,Section 4.1.3.1 ML20209D6231999-07-0808 July 1999 Forwards RAI Re Licensee 980827 Request for Amend That Would Delete Number of License Conditions & TS Requirements That Would Be Implemented After All Sf Has Been Removed from 10CFR50 Licensed Area.Response Requested within 30 Days ML20209C6481999-07-0606 July 1999 Forwards Rev 8 to Defueled Sar,Including Changes Since Last Submittal.Attachment Includes Brief Description of Each Change Included in Rev ML20209B7821999-07-0101 July 1999 Responds to NRC 990609 RAI Re License Change Application 244 & Accompanying Request for Exemption.Detailed Info Supports Estimation of Remaining Radioactive Matl Previously Provided by Licensee ML20212J3281999-06-15015 June 1999 Forwards Amend 22 to PGE-1012, Trojan Nuclear Plant Fire Protection Plan, IAW 10CFR50.48(f).Amend Reflects Revs Made During Decommissioning Activities & Does Not Reduce Effectiveness of Fire Protection ML20195J0111999-06-0909 June 1999 Responds to Requesting License & Exemption Re Emergency Preparedness ML20207D3861999-06-0101 June 1999 Forwards Rev 1 to PGE-1077, Trojan Nuclear Plant Reactor Vessel & Internals Removal Project Transportation Safety Plan ML20196L1251999-05-24024 May 1999 Forwards Application for Amend to License NPF-1 for Indirect Transfer of License,To Extent That Such Approval Required Solely to Reflect Change in Upstream Economic Ownership of Pacificorp ML20207A2751999-05-14014 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Mgt Created.Organization Chart Encl ML20206N9411999-05-11011 May 1999 Forwards Revised Epips,Including Rev 7 to EPIP 3, Response Organization Checklists & Rev 9 to EPIP 5, Emergency Preparedness Test Propgram. Changes to EPIPs 3 & 5 Ref New Owners of on-site Railroad Line,Portland & Western Railroad ML20206J8681999-05-0707 May 1999 Forwards Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Insp Observed Work Activities Associated with Lifting of Reactor Vessel in Preparation for Removal & Shipment to Hanford Reservation for Burial ML20206J7931999-05-0707 May 1999 Forwards Insp Repts 50-344/99-04 & 72-0017/99-02 on 990322- 25 & 29-0408.One Violations Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206H4331999-05-0505 May 1999 Forwards Amend 201 to License NPF-1 & Se.Amend Revises PDTSs by Deleting ISFSI Area,Revises Subsection 4.1.1,replaces Figure 4.1-1 with New Figure 4.1-1 & Adds New Page to Figure 4.1-1 to Reflect Access Control (ISFSI) Area ML20206N1571999-05-0404 May 1999 Forwards Util Quarterly Decommissioning Status Rept for First Quarter of 1999,IAW State of or Energy Facility Siting Council Order Approving Trojan Decommissioning Plan, ML20206E1731999-04-29029 April 1999 Informs That NRC Staff Has Performed an Acceptance Review of Trojan Nuclear Plant License Termination Plan,Submitted by ,To Determine Whether LTP Provides Adequate Info to Allow Staff to Conduct Detailed Review ML20206E0211999-04-28028 April 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re 970212 Application for Amend.Proposed Amend Would Revise Trojan Permanently Defueled TS to Delete ISFSI Area ML20206C9591999-04-23023 April 1999 Forwards Amend 200 to License NPF-1 & Safety Evaluation. Amend Changes License NPF-1 by Revising License Condition 2.C.(10), Loading of Fuel Into Casks in Fuel Building ML20206C9221999-04-23023 April 1999 Forwards Amend 199 to License NPF-1 & Safety Evaluation. Amend Changes License NPF-1 by Adding New License Condition Entitled, Loading of Fuel Into Casks in Fuel Building ML20205S9761999-04-21021 April 1999 Forwards Trojan Nuclear Plant,Radiological Environ Monitoring Rept for CY98. Rept Submitted in Accordance with Trojan Permanently Defueled TS 5.8.1.2 & Sections IV.B.2, IV.B.3 & Iv.C of App I to Title 10CFR50 ML20205T5471999-04-20020 April 1999 Forwards Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted ML20205N9061999-04-13013 April 1999 Forwards Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted.Inspectors Examined Portions of Physical Security, Access Authorization & FFD Programs ML20205P7301999-04-0808 April 1999 Forwards PGE-1009-98, Operational Ecological Monitoring Program for TNP,Jan-Dec 1998, Including All Existing non-radiological Effluents ML20205B3661999-03-25025 March 1999 Transmits Completed Application for Renewal of NPDES Permit for Trojan Nuclear Plant,Iaw License NPF-1,App B,Epp,Section 3.2 ML20204G1781999-03-18018 March 1999 Forwards Rev 4 to PGE-1063, Suppl to Applicants Environ Rept - Post Operating License Stage ML20204B7551999-03-18018 March 1999 Forwards Updated TS 5.6 Re High Radiation Area,Per Telcons with Nrc.Justification for TS Was Provided Previously with Util Ltr Dtd 990317,but Has Been Updated & Is Included as Encl 2 ML20204C5151999-03-17017 March 1999 Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas ML20207J3721999-03-10010 March 1999 Forwards License Amend Application 247 Requesting Amend to License NPF-1 to Add License Condition Denoting NRC Approval of PGE-1078, Trojan Nuclear Plant License Termination Plan, Also Encl.With Certificate of Svc ML20207L0011999-03-0808 March 1999 Transmits Tnp co-owners Annual Rept of Status of Decommissioning Funding for Tnp.Rept Is Based on Most Recent Analysis of Tnp Decommissioning Estimate & Funding Plan,Per Rev 6 to Pge, Tnp Decommissioning Plan ML20207G9691999-03-0303 March 1999 Forwards Rev 6 to PGE-1061, Trojan Nuclear Plant Decommissioning Plan. Summary of Changes,Attached.Revised Portions Denoted by Side Bars ML20207D7751999-03-0202 March 1999 Forwards Amend 21 to PGE-1012, Trojan Nuclear Plant Fire Protection Plan, Per 10CFR50.48(f).Amend Reflects Revs Made During Decommissioning Activities ML20207B0441999-02-24024 February 1999 Forwards Endorsements 139 to Nelia Policy NF-0225 & 2 to Nelia Policy NW-0602 ML20207J0701999-02-11011 February 1999 Forwards Proposed Ts,Update to ISFSI SAR & Revised Calculation,Per Application for Trojan ISFSI License ML20202G4291999-02-0202 February 1999 Forwards Rev 0 to PGE-1076, Trojan Reactor Vessel Package Sar. Approval,With Certain Conditions,For one-time Shipment of Trojan Reactor Vessel Package Granted by Commission Via Ltr ML20202G0931999-01-26026 January 1999 Submits Following Info That Will Be Needed for NRC Staff to Complete Review & Issue Trojan ISFSI License,As Result of 990121 Meeting with NRC Following Insp & Observation of ISFSI Preoperational Testing During Wk of 990118 ML20202F2551999-01-25025 January 1999 Forwards Fitness for Duty Program Performance Data Rept for July-Dec 1998 ML20202C1621999-01-21021 January 1999 Forwards Insp Repts 50-344/98-04 & 72-0017/98-01 & NOV Re Inadequate Actions Taken by Radiation Protection Technician to Ensure That Radiological Conditions Safe Prior to Removing Warning Signs for Airborne Radioactivity Area 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217C8171999-10-0606 October 1999 Forwards Notice of Receipt of Availability for Comment & Meeting to Discuss License Termination Plan,Per 990805 Application ML20211Q3281999-09-0909 September 1999 Forwards Insp Rept 50-344/99-06 on 990630-0701,21 & 0408-08. No Violations Noted.Insp Conducted to Review Decommissioning Activities Underway at Trojan Site & to Accompany Shipment of Reactor Vessel to Hanford,Washington for Burial ML20211J2101999-08-30030 August 1999 Forwards Request for Addl Info Re Application for Approval of Proposed Corporate Merger of Pacificorp & Scottishpower ML20211A7131999-08-16016 August 1999 Forwards Environ Assessment & Finding of No Significant Impact to Application for Exemption & License Amend Dtd 980827.Proposed Exemption & License Amend Would Delete EP Requirements of 10CFR50.54(q),10CFR50.47(b) & 10CFR50,app E ML20211B4091999-08-16016 August 1999 Forwards Environ Assessment & Finding No Significant Impact to Application for an Exemption & License Amend Dated 980129.Proposed Exemption & License Amend Would Delete Security Plan Requirements of 10CFR50.54(p) & 10CFR73.55 ML20210H5971999-07-27027 July 1999 Forwards Notice of Consideration of Approval of Application Re Merger & Opportunity for Hearing.Notice Being Forwarded to Ofc of Fr for Publication ML20210A6401999-07-19019 July 1999 Corrects Ref in Item 4 of Which Constitutes Rev 2 of Authorization from Wf Kane, for Trojan Reactor Vessel Package as Approved Package for Shipment Under General License,Subj to Listed Conditions ML20209D6231999-07-0808 July 1999 Forwards RAI Re Licensee 980827 Request for Amend That Would Delete Number of License Conditions & TS Requirements That Would Be Implemented After All Sf Has Been Removed from 10CFR50 Licensed Area.Response Requested within 30 Days ML20195J0111999-06-0909 June 1999 Responds to Requesting License & Exemption Re Emergency Preparedness ML20207A2751999-05-14014 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Mgt Created.Organization Chart Encl ML20206J7931999-05-0707 May 1999 Forwards Insp Repts 50-344/99-04 & 72-0017/99-02 on 990322- 25 & 29-0408.One Violations Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206J8681999-05-0707 May 1999 Forwards Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Insp Observed Work Activities Associated with Lifting of Reactor Vessel in Preparation for Removal & Shipment to Hanford Reservation for Burial ML20206H4331999-05-0505 May 1999 Forwards Amend 201 to License NPF-1 & Se.Amend Revises PDTSs by Deleting ISFSI Area,Revises Subsection 4.1.1,replaces Figure 4.1-1 with New Figure 4.1-1 & Adds New Page to Figure 4.1-1 to Reflect Access Control (ISFSI) Area ML20206E1731999-04-29029 April 1999 Informs That NRC Staff Has Performed an Acceptance Review of Trojan Nuclear Plant License Termination Plan,Submitted by ,To Determine Whether LTP Provides Adequate Info to Allow Staff to Conduct Detailed Review ML20206E0211999-04-28028 April 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re 970212 Application for Amend.Proposed Amend Would Revise Trojan Permanently Defueled TS to Delete ISFSI Area ML20206C9221999-04-23023 April 1999 Forwards Amend 199 to License NPF-1 & Safety Evaluation. Amend Changes License NPF-1 by Adding New License Condition Entitled, Loading of Fuel Into Casks in Fuel Building ML20206C9591999-04-23023 April 1999 Forwards Amend 200 to License NPF-1 & Safety Evaluation. Amend Changes License NPF-1 by Revising License Condition 2.C.(10), Loading of Fuel Into Casks in Fuel Building ML20205T5471999-04-20020 April 1999 Forwards Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted ML20205N9061999-04-13013 April 1999 Forwards Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted.Inspectors Examined Portions of Physical Security, Access Authorization & FFD Programs ML20202C1621999-01-21021 January 1999 Forwards Insp Repts 50-344/98-04 & 72-0017/98-01 & NOV Re Inadequate Actions Taken by Radiation Protection Technician to Ensure That Radiological Conditions Safe Prior to Removing Warning Signs for Airborne Radioactivity Area ML20198E9871998-12-21021 December 1998 Informs That NRC Staff Acks Delay & Understands Bnfl Fuel Solutions Will Submit Revised Schedule for Responding to Second Transtor Shipping Cask RAI No Later than 981231. Current Schedule Last Updated on 981030 ML20198S1661998-12-17017 December 1998 Final Response to FOIA Request for Documents.Records Encl & Identified in App C & D.App E Records Withheld in Part & App F Records Withheld in Entirety (Ref FOIA Exemption 5) & App G Records Withheld in Entirety (Ref FOIA Exemptions 4 & 5) ML20195D9471998-11-0404 November 1998 Informs of NRC Final Decision on Portland General Electric Co Request for Approval of one-time Shipment of Decommissioned Rv Package from Trojan Nuclear Power Plant Near Richland,Wa.Commission Approved Request on 981022 ML20155F6471998-11-0202 November 1998 Informs of NRC Final Decision on Portland General Electric Co Request for Approval of one-time Shipment of Decommissioned Rv Package from Tnp Near Ranier,Or to Disposal Site at Hanford Nuclear Reservation ML20155G7371998-10-30030 October 1998 Forwards Insp Rept 50-344/98-202 on 980831-0903. No Violations Noted.Insp Program Covered Maint Program, Safety Review Program & Follow Up on Previous Inspector Follow Items Re Modular Sf Cooling Sys ML20155E0491998-10-29029 October 1998 Forwards SER Granting Two Specific Exemptions Under 10CFR71.8 for Approval of Trojan Reactor Vessel Package for one-time Shipment to Us Ecology Disposal Facility Near Richland,Wa ML20155H0171998-10-29029 October 1998 Informs of Us NRC Final Decision on Poge Request for Approval of one-time Shipment of Decommissioned Reactor Vessel Package from Trojan Nuclear Power Plant,To Disposal Site at Hanford Nuclear Reservation,Near Richland.Wa ML20155F6001998-10-29029 October 1998 Informs of NRC Final Decision on Portland General Electric Co Request for Approval of one-time Shipment of Decommissioned Rv Package from Plant Near Ranier,Or Disposal Site at Hanford Nuclear Reservation ML20151Z6461998-09-17017 September 1998 Refers to Insp Rept 50-344/98-02 Issued on 980701 Re Modular Spent Fuel Pool Cooling Sys.Info Provided in Re New Spent Fuel Pool Sys Reviewed.Insp 50-344/98-03 & 50-344/98-202 Also Included Reviews of Sys Design & Testing ML20151Y8761998-09-11011 September 1998 Responds to Re NRC Efforts on Review Activities for Proposed one-time Shipment of Trojan Reactor Vessel,For Disposal.Nrc decision-making Process Acting in Parrallel & in Concert with Other Necessary Approvals ML20237F1281998-08-27027 August 1998 First Partial Response to FOIA Request for Documents. Forwards App a Records Already Available in Pdr.App B Records Being Made Available in PDR ML20237E5781998-08-25025 August 1998 Forwards Insp Rept 50-344/98-03 on 980727-30.No Violations Noted ML20237B4271998-08-14014 August 1998 Expresses Appreciation for Contribution to NRC Public Meeting Held in Kelso,Wa on 980730 Re Proposed One Time Shipment of Trojan Decommissioned Rv for Disposal ML20237A4101998-08-11011 August 1998 Forwards RAI Re Plant Request for Amend to Support Repowering Site W/Natural Gas Fired,Combined Cycle Turbines. Response Requested to Be Provided within 60 Days of Date of Ltr ML20236T5651998-07-21021 July 1998 Responds to to Chairman Jackson Expressing Concern W/Nrc Schedules for Reviewing Portland General Electric Co Applications for on-site Sf Storage & for one-time Shipment of Reactor Vessel ML20236G9671998-07-0101 July 1998 Forwards Insp Rept 50-344/98-02 on 980601-04.No Violations Noted.Plans to Replace Existing Spent Fuel cooling,make-up Water & clean-up Sys W/New Self Contained Sys Were Discussed W/Staff ML20249B8581998-06-18018 June 1998 Informs That Tj Kobetz Has Assumed Project Management Responsbilities for Proposed Trojan Isfsi.Communications W/ NRC Should Be Directed to Tj Kobetz.Written Correspondence Should Continue to Go DCD ML20247N6681998-05-22022 May 1998 Forwards Insp Rept 50-344/98-01 on 980504-07.No Violations Noted.Insp Focused on Physical Security Program ML20217L0571998-04-29029 April 1998 Forwards Insp Rept 50-344/98-201 on 980223-26.No Violations Noted.Specific Areas Examined Included Training & Certification of Qualified Evaluators,Independent Reviewers & Independent Safety Reviewers;Procedural Controls IR 05000344/19970051998-03-25025 March 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/97-05.Actions Will Be Reviewed During Future Insp to Determine That Full Compliance Has Been Achieved & Will Be Maintained ML20217A5491998-03-18018 March 1998 Submits Update on Actions Taken by NRC Since 970613 Response Re Portland General Electric Co Request for Approval of 1-time Shipment of Decommissioned Reactor Vessel.Two Issues Identified for Review in Utility Request,Submitted ML20217A4221998-03-11011 March 1998 Submits Update on Actions Taken by NRC Since 970613 Response Re Portland General Electric Co Request for Approval of one-time Shipment of Decommissioned Reactor Vessel.Two Issues for Review in Utility Request Submitted ML20202J0741998-02-18018 February 1998 Grants Request for Extension of Response to NOV in Insp Rept 50-344/97-05.New Response Deadline 980317 ML20203A9061998-02-18018 February 1998 Informs of 980209 Meeting W/Poge in Region IV to Discuss Proposed Changes to Security Provisions for Protected Area at Plant.List of Attendees & Handouts Provided by Util Encl ML20202C1791998-02-0909 February 1998 Returns Responses to 970731 RAI-2 Re 960326 Application for Trojan Isfsi,Due to Overall Poor Quality.Proprietary Documents Are Being Returned Under Separate Cover as Required Affidavits Were Not Provided ML20203F4661998-01-30030 January 1998 Requests That Staff Ask Us Ecology,In Coordination W/Portland General Electric Co,To Perform Comprehensive & Defensible Pathways Analysis to Demonstrate Suitability of Proposed Wastes for Disposal at Hanford Disposal Site ML20199D7481998-01-23023 January 1998 Forwards Omitted Cover Page for Insp Rept 50-344/97-05 on 971201-03 ML20199F0021998-01-23023 January 1998 Forwards Omitted Page of Insp Rept 50-344/97-05 ML20199F0241998-01-15015 January 1998 Forwards Insp Rept 50-344/97-05 on 971201-03 & Notice of Violation.Areas Reviewed as Part of Insp Included;Sfp TS Compliance,Cold Weather Preparations,Results of 1997 Emergency Exercise & Followup on Notification to NRC ML20198F7411998-01-0707 January 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/97-03. Implementation of Corrective Actions Will Be Reviewed During Future Insp to Determine That Compliance Achieved 1999-09-09
[Table view] |
Text
-- .
a Sh g- ds DEo% UNITED STATES 7' H 7 j
- r NUCLEAR REGULATORY COMMISSION
- WASHINGTON, D.C. 2056M001 October 23, 1996 Mr. Stephen M. Quennoz, Trojan Site Executive Portland General Electric Company 71760 Columbia River Highway l Rainier, Oregon 97048 i
SUBJECT:
FINAL SURVEY PLAN FOR THE TROJAN INDEPENDENT SPENT FUEL STORAGE INSTALLATION (TAC N0. L22102) l
Dear Mr. Quennoz:
By letter dated April 9,1996, Portland General Electric Company (PGE) submitted its Final Survey Plan for the proposed Trojan Independent Spent Fuel )
Storage Installation (ISFSI). On August 13, 1996, PGE responded to the '
staff's request for additional information dated July 16, 1996. Additionally, in August 1996, the staff completed an inspection regarding your final survey activities (Inspection Report Nos. 50-344/96-07; 72-17/96-01), to verify compliance with the requirements of 10 CFR 50.82.
The staff has completed its review of the PGE Final Survey Plan for the Trojan ISFSI. In general, the staff agrees with the approach taken by PGE. However, as you are aware, the Nuclear Regulatory Commission does not require that a i final survey plan be approved prior to implementing final survey activities, l as, in fact, was the case for the proposed Trojan ISFSI. The purpose of ;
reviewing and resolving comments on a final survey plan is to provide a l licensee with a certain level of. assurance 'that its survey approach is acceptable and to reduce potential schedule delays since it is always possible that additional survey work could be required.
The release of a site or site area is contingent upon review and approval of the final survey report, which essentially is the report of the implementation of the Plan. Even if the Plan had been reviewed and approved (all comments resolved), this does not necessarily ensure that the final survey report will I be approved. Indeed, the implementation of the Plan and the subsequent data l analysis may indicate additional survey work is necessary.
Enclosed are additional comments, which should be considered as NRC guidance, ,
on the PGE Final Survey Plan. PGE is not required to respond to these l comments by modifying the Plan. Rather, PGE should ensure that these comments .
are incorporated into the Final Survey Report prior to submittal to the NRC. !
I The staff reserves the right to comment on the final survey activities j conducted at the Trojan ISFSI site as delineated in the Final Survey Report.
The NRC recommends that PGE submit the Final Survey Report for the Trojan ISFSI site as soon as practicable since approval of the Report g 9610250226 961023
- DR ADOCK 0500 4 h gf se
Mr. Stephen M. Quennoz 2
. determines the acceptability of the release of the Trojan ISFSI site. Insofar as the NRC has not released this portion of PGE's site, you are advised that Trojan ISFSI construction activities could proceed at your risk, at least in relation to final survey activities. However, the staff would like to remind PGE of the requirements cited at 10 CFR Sections 72.34 and 72.40(b and c) regarding the environmental review for the ISFSI site.
Moreover, PGE should not construe in any way that the acceptance of the ISFSI Final Survey Plan and Report constitutes approval of the Final Survey Plan or Report for the Trojan Nuclear Plant facility and site. The Trojan ISFSI comprises a small portion of the Trojan site, and the contamination potential ,
for this area is anticipated to be low and primarily unaffected, although the .
Radwaste Building site area may be a notable exception.. PGE must submit a new Final Survey Plan and subsequent Final Survey Report for the Trojan Nuclear i Plant facility and site.
TAC No. L22102 will remain open for future activities related to the review of the Final Survey Report regarding the Trojan ISFSI site. As such, PGE should continue to reference this TAC No. on any future correspondence related to the Trojan ISFSI Final Survey Plan and Report.
If PGE would like to discuss this further, please contact me at (301) 415-1309.
Sincerely, Original signed by /s/
Lawrence E. Kokajko, Senior Project Manager !
Spent Fuel Licensing Section Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Dockets 72-17 (50-344)
Enclosure:
NRC Comments cc: Mr. John Stokley, SAIC Service List Distribution: (Control No. 0105) !
Dockets 72-17, 50-344 .PUBLIC NRC File Center NMSS r/f SFP0 r/f ,
VTharpe FSturz CHaughney WDTravers MMasnik, NRR VEverett, RIV ,
OFC SFP0 M DWM. (b DWtt / SFP0 /
NAME LKokajko:ddLI CP h io DMoM EJLeeds h DATE 10/ /96 10/h/96 1[ h6 10/ W 96 C = C0VER E = COVER 4 ENCLOSURE N = NO COPY OFFICIAL RECORD COPY G:\ LEK \FSP.TNP
CC:
Mr. Michael J. Sykes, Chairman Board of County Commissioners ;
Columbia County St. Helens, OR 97501 Mr. David Stewart-Smith ,
Oregon Department of Energy l Salem, OR 97310 !
Regional Administrator, Region IV U. S. Nuclear Regulatory Commission i Harris Tower and Pavillion 611 Ryan Plaza Drive, Suite 400 l Arlington, TX 76011-8064 Mr. Harold Chernoff Manager, Licensing Trojan Nuclear Plant 71760 Columbia River Highway Ranier, OR 97048 l Mr. Lloyd K. Marbet l 19142 S.E. Bakers Ferry Road i Boring, OR 97009 Mr. Jerry Wilson Do It Yourself Committee 1 570 N.E. 53rd Hillsboro, OR 97124 Mr. Eugene Rosolie Northwest Environmental Advocates 302 Haseltine Building 133 S.W. 2nd Avenue Portland, OR 97204
i
~
j .
! U.S. NUCLEAR REGULATORY COMMISSION COBOEENTS V
l ON PORTLAND GENERAL ELECTRIC COMPANY'S 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORNATION REGARDING THE l TROJAN ISFSI FINAL SURVEY PLAN (PLAN) i i
NRC Comment No. 1:
l It is not necessary to remove the commitment from the Plan to take confirmatory soil samples in the open land areas north and l east of the Industrial Area fence line. The explanation provided
] as to their purpose satisfies the NRC staff inquiry.
i Revision of the Plan to remove the Maintenance Building,
- Materials Warehouse, and the Materials Covered Storage from the
- survey design is acceptable provided that the final survey of j these buildings will be conducted in compliance with survey j commitments when decommissioning the remaining site. )
NRC Comment No. 2:
1 The requirement that open area survey measurements are " averaged l 2
over areas not to exceed 100 m " also applies to soil concentration. This requirement should be reflected in the final survey. The licensge is reminded that this averaging requirement refers to the 100 m contiguous area surrounding an elevated '
sample, and this area may not correspond to the established 10m x los grid pattern imposed on the survey area.
NRC Comment No. 3:
NRC staff continues to caution the licensee from using the release values listed in NUREG-1500, particularly regarding uranium and thorium soil guideline limits. These values are j still being revised and the schedule for final publication is 1 uncertain. l l
NRC Comment No. 4: )
This comment required that the radionuclide contaminants be clearly identified. In response to our comments, the Plan has been revised identifying Co-60 and Cs-137 as the primary contaminants. Is Sr-90 a potential contaminant? Will the survey address hard to detect radionuclides? Are there other potential radiological contaminants?
ENCLOSURE
1 .
PGEs' response to comment no. 4 states, " Alpha activity should not be a consideration in any unaffected areas since the I radiological history of Trojan show alpha activity, when present, is associated with detectable beta and/or gamma radionuclides."
l This statement is not sufficient in justifying why the final survey will not include survey measurements for alpha activity in unaffected areas. The Plan also states, "Since TNP experienced events of fuel failure, the alpha contamination limits in Table
.1 3.1 are applicable." The limits in Table 3.1 apply to both affected and unaffected areas. Affected and unaffected areas differ by the frequency of measurements taken per survey area.
The radiation type (i.e., alpha, beta, or gamma) and the measurement technique (i.e., scan, direct, soil, etc.) performed should be the same for affected and unaffected areas.
As stated in the original comment, PGE should identify and document potential radiological contaminants that are to be addressed in the survey, including alpha emitting radionuclides.
Identification of potential radiocontaminants is necessary to determine applicable release limits and to evaluate the survey !
data.
Justification supported by data (i.e., operational history, characterization data) should be provided explaining why potential radiological contaminates other than co-60 and cs-137 are not included in the final survey.
NRC Comment No. 5: )
The licensee response to this comment states, "The expected MDAs for our alpha counting systems are greater than 25% of the applicable release limits." Which release limits are applicable i to this site? Table 3.1 lists three different release limits for alpha emitting radionuclides (i.e., 5000 dpa/100 cm2 for natural uranium, 100 dpa/100 cm2 for transuranics, and 1000 dpm/100 cm2 for natural thorium). As stated in comment.no. 4, identification of potential radiocontaminants is necessary to determine )
applicable release limits and to evaluate appropriate i instrumentation MDA.
If recommended survey instrumentation MDAs are not obtainable for radiological emissions of concern, the licensee should address how elevated areas of activity will be detected with an acceptable level of confidence.
Estimations of the MDA and the corresponding critical level for all survey measurements are necessary to evaluate the survey data in relation to background and appropriate release limits.
Illustrate the MDA calculation for each survey measurement type and indicate which survey measurements exceed the critical level.
NRC Comment No. 8:
Does Section 3.6.4 imply that approximately 10% of the survey measurements will be re-analysed as part of Independent Quality Checking?
NRC Comment No. 13:
As stated above, affected and unaffected areas differ by survey frequency; the same surveys conducted in affected areas should be conducted in unaffected areas at a lower frequency.