Other: ML072880306, ML20133G926, ML20134C649, ML20134M332, ML20137R696, ML20147J409, ML20149J361, ML20202C179, ML20249B858, VPN-012-98, Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period, VPN-028-98, Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 2, VPN-037-99, Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas, VPN-048-98, Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-1536, VPN-067-96, Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site, VPN-071-96, Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl, VPN-081-96, Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described
|
MONTHYEARML0728803061996-07-15015 July 1996 Trojan Independent Spent Fuel Storage Installation Updated Safety Analysis Report Project stage: Other ML20129D9751996-10-23023 October 1996 Forwards Addl Comments on Response to Request for Addl Info Re Plant ISFSI Final Survey Plan Project stage: RAI VPN-067-96, Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site1996-10-30030 October 1996 Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site Project stage: Other ML20134M3321996-11-20020 November 1996 Grants Preliminary Approval of Trojan ISFSI Physical Security Plan Project stage: Other VPN-071-96, Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl1996-11-27027 November 1996 Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl Project stage: Other VPN-081-96, Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described1996-12-12012 December 1996 Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described Project stage: Other ML20133G9261997-01-14014 January 1997 Advises That Info Contained in Ltr Will Be Withheld from Public Disclosure Ref 10CFR2.790,per Request Project stage: Other ML20134C6491997-01-30030 January 1997 Concurs That Addl Info & Attachment III to Pge Be Withheld from Public Disclosure Per 10CFR2.790 as Requested Project stage: Other ML20137P7431997-04-0404 April 1997 Informs That Info Provided in Response to NRC RAI & Calculations & Drawings,Discussed in 970310 Affidavit,Will Be Withheld from Public Project stage: RAI ML20137R6961997-04-10010 April 1997 Denies Request to Withhold Listed Info from Public Disclosure Because Info Does Not Meet Requirements of 10CFR2.790 Project stage: Other ML20147J4091997-05-0202 May 1997 Informs That Documents Contained in Affidavit Executed 970318 from Sierra Nuclear Corp,Will Be Withheld from Public Disclosure,Per 10CFR2.790 Project stage: Other IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests Project stage: Request ML20149J3611997-07-24024 July 1997 Informs That Calculations Submitted in Support of Trojan ISFSI Application,Discussed in 970501 Affidavit,Will Be Withheld from Public Disclosure Project stage: Other ML20202C1791998-02-0909 February 1998 Returns Responses to 970731 RAI-2 Re 960326 Application for Trojan Isfsi,Due to Overall Poor Quality.Proprietary Documents Are Being Returned Under Separate Cover as Required Affidavits Were Not Provided Project stage: Other VPN-012-98, Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period1998-02-10010 February 1998 Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period Project stage: Other VPN-028-98, Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 21998-05-13013 May 1998 Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 2 Project stage: Other ML20249B8581998-06-18018 June 1998 Informs That Tj Kobetz Has Assumed Project Management Responsbilities for Proposed Trojan Isfsi.Communications W/ NRC Should Be Directed to Tj Kobetz.Written Correspondence Should Continue to Go DCD Project stage: Other VPN-048-98, Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-15361998-08-25025 August 1998 Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-1536 Project stage: Other ML20155C5561998-10-28028 October 1998 Summary of 981008 Meeting with Portland General Electric in Rockville,Md Re Util 10CFR72 License Application.Attendance List,Agenda & Slide Presentation Matl,Encl Project stage: Meeting ML20198B7641998-12-16016 December 1998 Summary of 981119 Meeting with Util & NRC Re Issues Pertaining to Portland General Electric ISFSI Emergency Plan.Attendance List Encl Project stage: Meeting VPN-037-99, Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas1999-03-17017 March 1999 Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas Project stage: Other 1997-05-02
[Table View] |
Text
_
Dl~7
$D W f m ruq g
UNITED STATES g g g
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066-0001 o
%,*****f January 30, 1997 a
Mr. Arthur J. McSherry, President Sierra Nuclear Corporation One Victor Square Scotts Valley, CA 95066
SUBJECT:
PUBLIC DISCLOSURE DETERMINATION (TAC NO. L22102)
Dear Mr. McSherry:
A letter from Portland General Electric Company (PGE) dated January 9,1997, (VPN-001-97), contained an affidavit executed January 6, 1997, from Sierra Nuclear Corporation (SNC). The SNC affidavit requested that information provided in response to a Nuclear Regulatory Commission staff request for additional information and referenced in Attachment III to the PGE letter be 4
withheld from public disclosure pursuant to 10 CFR 2.790.
The information in Attachment III contains calculations and drawings that are considered trade i
secrets and privileged information by SNC.
The affidavit states that the submitted information should be withheld from public disclosure for the following reasons:
1.
The information contained within the proprietary material is calculated data, results of design calculations, component design details, and critical dimensions that were developed by SNC. This type of information is normally held in confidence by those who invest time and money in its development.
2.
The information contained within tM proprietary material has been and is being held in confidence by SNC, and the information that is being claimed as trade secrets and privileged information is not available in public sources.
3.
SNC has invested a considerable amount of time, engineering labor, and money in the development of the information.
Public disclosure of this information would cause substantial harm to SNC's competitive position.
Others, seeking to design similar storage cask systems, would have to make similar investments to develop the information on their own, as long as the information is not disclosed to the public.
Based on your affidavit, our review of the above listed documents, and the requirements of 10 CFR 2.790, we have determined that the above listed documents should be withheld from public disclosure pursuant to 10 CFR 2.790.
030063 NEO EU CO G,D MFD 9702030229 970130 PDR ADOCK 05000344 W
PDR
Mr. A. McSherry g Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public disclosure should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
Please be advised that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your withheld information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any 2
l public disclosure.
Sincerely, Original signed by /s/
Charles J. Haughney, Acting Director i
Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Docket No. 72-17 (50-344) cc:
Service List DISTRIBUTION:
Dockets 72-17.-(50-344) NRC: File Center r PUBLIC I NMSS R/F SFP0 R/F VTharpe FSturz SShankman WReamer, OGC MMas.nik, NRR Region IV SMirsky, SAIC l OFC SFP0 A d 4 SFP0MM & M6Ff0 h =SFP0 dY SFP0
[NAME DGReid[Ibf MPSiemie4D EJLeedsM CJHaugh$y lDATE g/ /22./97
/N/97
[/d/97+
l/ST/97
/
/97 C - COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY G:\\SIERNUCL\\ PROP \\PGE00197.LTR 1/30/97
- dd
e a
\\
cc:
\\
\\
Mr. Stephen M. Quennoz, Trojan Site Executive and Plant General Manager Portland General Electric Company i
Trojan Nuclear Plant 71760 Columbia River Highway Rainier, OR 97048 l
Chairman j
Board of County Commissioners Columbia County St. Helens, OR.97501 Mr. David Stewart-Smith 4
Administrator, Energy Resources Division Oregon Department of Energy 625 Marion Street, NE Salem, OR 97310 4
2 i
Regional Administrator, Region IV U. S. Nuclear Regulatory Comission Harris Tower and Pavillion 611 Ryan Fiaza Drive, Suite 400 J
Arlington, TX 76011-8064 Mr. H. Ray Pate Manager, Licensing, Compliance and Commitment Management Trojan Nuclear Plant 71760 Columbia River Highway Ranier, OR 97048 Mr. Lloyd K. Marbet 19142 S.E. Bakers Ferry Road Boring, OR 97009 Mr. Jerry Wilson Do It Yourself Comittee 570 N.E. 53rd Hillsboro, OR 97124 Mr. Eugene Rosolie Northwest Environmental Advocates 302 Haseltine Building 133 S.W. 2nd Avenue Portland, OR 97204
)