Other: ML072880306, ML20133G926, ML20134C649, ML20134M332, ML20137R696, ML20147J409, ML20149J361, ML20202C179, ML20249B858, VPN-012-98, Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period, VPN-028-98, Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 2, VPN-037-99, Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas, VPN-048-98, Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-1536, VPN-067-96, Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site, VPN-071-96, Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl, VPN-081-96, Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described
|
MONTHYEARML0728803061996-07-15015 July 1996 Trojan Independent Spent Fuel Storage Installation Updated Safety Analysis Report Project stage: Other ML20129D9751996-10-23023 October 1996 Forwards Addl Comments on Response to Request for Addl Info Re Plant ISFSI Final Survey Plan Project stage: RAI VPN-067-96, Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site1996-10-30030 October 1996 Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site Project stage: Other ML20134M3321996-11-20020 November 1996 Grants Preliminary Approval of Trojan ISFSI Physical Security Plan Project stage: Other VPN-071-96, Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl1996-11-27027 November 1996 Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl Project stage: Other VPN-081-96, Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described1996-12-12012 December 1996 Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described Project stage: Other ML20133G9261997-01-14014 January 1997 Advises That Info Contained in Ltr Will Be Withheld from Public Disclosure Ref 10CFR2.790,per Request Project stage: Other ML20134C6491997-01-30030 January 1997 Concurs That Addl Info & Attachment III to Pge Be Withheld from Public Disclosure Per 10CFR2.790 as Requested Project stage: Other ML20137P7431997-04-0404 April 1997 Informs That Info Provided in Response to NRC RAI & Calculations & Drawings,Discussed in 970310 Affidavit,Will Be Withheld from Public Project stage: RAI ML20137R6961997-04-10010 April 1997 Denies Request to Withhold Listed Info from Public Disclosure Because Info Does Not Meet Requirements of 10CFR2.790 Project stage: Other ML20147J4091997-05-0202 May 1997 Informs That Documents Contained in Affidavit Executed 970318 from Sierra Nuclear Corp,Will Be Withheld from Public Disclosure,Per 10CFR2.790 Project stage: Other IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests Project stage: Request ML20149J3611997-07-24024 July 1997 Informs That Calculations Submitted in Support of Trojan ISFSI Application,Discussed in 970501 Affidavit,Will Be Withheld from Public Disclosure Project stage: Other ML20202C1791998-02-0909 February 1998 Returns Responses to 970731 RAI-2 Re 960326 Application for Trojan Isfsi,Due to Overall Poor Quality.Proprietary Documents Are Being Returned Under Separate Cover as Required Affidavits Were Not Provided Project stage: Other VPN-012-98, Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period1998-02-10010 February 1998 Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period Project stage: Other VPN-028-98, Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 21998-05-13013 May 1998 Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 2 Project stage: Other ML20249B8581998-06-18018 June 1998 Informs That Tj Kobetz Has Assumed Project Management Responsbilities for Proposed Trojan Isfsi.Communications W/ NRC Should Be Directed to Tj Kobetz.Written Correspondence Should Continue to Go DCD Project stage: Other VPN-048-98, Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-15361998-08-25025 August 1998 Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-1536 Project stage: Other ML20155C5561998-10-28028 October 1998 Summary of 981008 Meeting with Portland General Electric in Rockville,Md Re Util 10CFR72 License Application.Attendance List,Agenda & Slide Presentation Matl,Encl Project stage: Meeting ML20198B7641998-12-16016 December 1998 Summary of 981119 Meeting with Util & NRC Re Issues Pertaining to Portland General Electric ISFSI Emergency Plan.Attendance List Encl Project stage: Meeting VPN-037-99, Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas1999-03-17017 March 1999 Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas Project stage: Other 1997-05-02
[Table View] |
Text
+
gA# #f 4 y
t UNITED STATES
. ;j
- g NUCLEAR REGULATORY COMMISSION
- j WASHINGTON, D.C. 30666-4001 5
April 10, 1997 Mr. Arthur J. McSherry, President Sierra Nuclear Corporation' One-Victor Square
'Scotts Valley, CA 9506d
SUBJECT:
PUBLIC DISCLG,JRE'OETERMINATION (TAC'NO. L22102)
Dear Mr. McSherry:
I Portland General Electric's (PGE) March 19, 1997 letter, (VPN-020-97),
contained Sierra Nuclear Corporation (SNC) affidavit executed March 18, 1997.
The affidavit referenced in Attachment III. requested that the following drawings, referenced in Attachment IV. be withheld from public disclosure
-pursuant to 10 CFR 2.790:
P0C-003, Sheet 1 of 1. Revision 0. Basket Overpack Name Plate PCC-008. Sheet 1 of 1, Revision 0. TranStor System Concrete Cask Name Plate PGB-005, Sheet 1 of 1. Revision 0 GTCC Basket Name Plate I
The affidavit states that the submitted information should be withheld from public disclosure for the following reasons:
1.
This information has been and is held in confidence by SNC.
2.
The information contained within the proprietary material is regarded as component design details and critical dimensions that is normally held in confidence by those who invest time and money in its development.
3.
SNC bas invested a considerable amount of time, engineering labor. and money in the development of the information.
Public disclosure of this information would cause substantial harm to SNC's competitive position.
Others, seeking to design similar systems, would have to make similar investments to develop the information on their own, as long as the information is not disclosed to the public.
We have reviewed the supporting information in accordance with the i
requirements of 10 CFR 2.790 and have concluded that you have not provided sufficient justification for us to determine that the information sought to be withheld from public disclosure contains trade secrets or proprietary j
information.
Accordingly, we have concluded that the information sought to be withheld from public disclosure does not meet the requirements of 10 CFR 2.790.
Therefore, your request to withhold the listed drawings from public disclosure is denied.
NRC FB.E CENTER COPY.o 9704140205 970410 t
DR ADOCK 0500 4
E p
h 2 -__
4 I
Mr. A. McSherry-
-2.
)
1 Within 30 days from the' receipt of this letter, the subject documents will be placed in the Public Document Room.
If, within 30 days of the receipt of this letter, you request withdrawal of.the documents in accordance with 10 CFR 2.790(c). your request will be considered in light of applicable statutes and regulations and a determination made whether the documents will be withheld from public disclosure and returned to you.
)
Sincerely, Original signed by /s/
William F. Kane Director 1
Spent Fuel Project Office l
Office of Nuclear Material Safety l
and Safeguards l
Docket 72-17 (50-344) cc: Service List
)ISTRIBUTION:.......
lJockets72-17l(50-344) 'NRC File Center.-
PUBLIC NMSS R/F SFP0 R/F VTharpe FSturz SMirsky, SAIC l
WReamer. OGC MMasr.ik. NRR Region'IV N
SFP0ef/,
0FC SFP0 4
OGC d.
SFP0 g
f NAME DGReid M dI MPSiemien EJLeeds [
WFKM i
h/97 d/I/97 d/9/97
/
/97 f
DATE 4/d/97 i /
C = COVER E = COVER h ENGLOSLRE 4 = NO COPY OFFICIAL RECORD COPY G:\\sIERNUCL\\ PROP \\sNCDWGs. DEN 4/10/97
- dd V
w
.t
r 4
e 8'
-Portland General Electric Company Trojan Nuclear Power Plant Docket No. 72-17 (50 244) cc:
Chairman Board of County Commissioners.
Columbia County St. Helens, OR 97501 Mr. David Stewart-Smith Administrator. Energy Resources Division Oregon Department of Energy 625 Marion Street, NE Salem. OR 97310 Regional Administrator Region IV U. S. Nuclear Regulatory Commission Harris Tower and Pavillion 611 Ryan Plaza Drive. Suite 400 Arlington, TX 76011-8064 Mr. H. Ra Manager. y Pate Licensing, Compliance and Commitment Management
' Trojan Nuclear Plant 71760 Columbia River Highway Rainier, OR 97048 Mr. Lloyd K. Marbet 19142 SE Bakers Ferry Road Boring, OR 97009 Mr. Jerry Wilson Do It Yourself Committee 570 NE 53rd l :
Hillsboro, OR 97124 Mr. Eurene Rosolie Northwest Environmental Advocates 302 Haseltine Building 133 SW 2nd Avenue Portland OR 97204 Mr. Adam Bless Trojan Nuclear Plant 71760 Columbia River Highway Rainier, OR 97048