Other: ML072880306, ML20133G926, ML20134C649, ML20134M332, ML20137R696, ML20147J409, ML20149J361, ML20202C179, ML20249B858, VPN-012-98, Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period, VPN-028-98, Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 2, VPN-037-99, Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas, VPN-048-98, Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-1536, VPN-067-96, Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site, VPN-071-96, Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl, VPN-081-96, Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described
|
MONTHYEARML0728803061996-07-15015 July 1996 Trojan Independent Spent Fuel Storage Installation Updated Safety Analysis Report Project stage: Other ML20129D9751996-10-23023 October 1996 Forwards Addl Comments on Response to Request for Addl Info Re Plant ISFSI Final Survey Plan Project stage: RAI VPN-067-96, Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site1996-10-30030 October 1996 Forwards Final Survey Rept for ISFSI Site for Trojan Nuclear Site Project stage: Other ML20134M3321996-11-20020 November 1996 Grants Preliminary Approval of Trojan ISFSI Physical Security Plan Project stage: Other VPN-071-96, Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl1996-11-27027 November 1996 Forwards Changes to TS & SAR to Reflect New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan Isfsi. Description & Justification for Changes,Encl Project stage: Other VPN-081-96, Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described1996-12-12012 December 1996 Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described Project stage: Other ML20133G9261997-01-14014 January 1997 Advises That Info Contained in Ltr Will Be Withheld from Public Disclosure Ref 10CFR2.790,per Request Project stage: Other ML20134C6491997-01-30030 January 1997 Concurs That Addl Info & Attachment III to Pge Be Withheld from Public Disclosure Per 10CFR2.790 as Requested Project stage: Other ML20137P7431997-04-0404 April 1997 Informs That Info Provided in Response to NRC RAI & Calculations & Drawings,Discussed in 970310 Affidavit,Will Be Withheld from Public Project stage: RAI ML20137R6961997-04-10010 April 1997 Denies Request to Withhold Listed Info from Public Disclosure Because Info Does Not Meet Requirements of 10CFR2.790 Project stage: Other ML20147J4091997-05-0202 May 1997 Informs That Documents Contained in Affidavit Executed 970318 from Sierra Nuclear Corp,Will Be Withheld from Public Disclosure,Per 10CFR2.790 Project stage: Other IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests Project stage: Request ML20149J3611997-07-24024 July 1997 Informs That Calculations Submitted in Support of Trojan ISFSI Application,Discussed in 970501 Affidavit,Will Be Withheld from Public Disclosure Project stage: Other ML20202C1791998-02-0909 February 1998 Returns Responses to 970731 RAI-2 Re 960326 Application for Trojan Isfsi,Due to Overall Poor Quality.Proprietary Documents Are Being Returned Under Separate Cover as Required Affidavits Were Not Provided Project stage: Other VPN-012-98, Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period1998-02-10010 February 1998 Requests Exemption from Requirements of 10CFR72.82(e) Re ISFSI Preoperational Test Rept.Exemption Is Requested So That Fuel Loading Operations May Proceed During Interim Period Project stage: Other VPN-028-98, Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 21998-05-13013 May 1998 Forwards Five Pages of Figures Showing Node & Element Numbering for 2-D (& 3D) Model 0 Degree Drop of PWR Transtor Basket 30-foot Drop Analysis,Calculation BNFL1.10.06.34,rev 2 Project stage: Other ML20249B8581998-06-18018 June 1998 Informs That Tj Kobetz Has Assumed Project Management Responsbilities for Proposed Trojan Isfsi.Communications W/ NRC Should Be Directed to Tj Kobetz.Written Correspondence Should Continue to Go DCD Project stage: Other VPN-048-98, Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-15361998-08-25025 August 1998 Forwards Description of Review Methodology & Summary of Results,Including List of Identified Variations from Guidance Contained in Std Review Plan,Per NUREG-1536 Project stage: Other ML20155C5561998-10-28028 October 1998 Summary of 981008 Meeting with Portland General Electric in Rockville,Md Re Util 10CFR72 License Application.Attendance List,Agenda & Slide Presentation Matl,Encl Project stage: Meeting ML20198B7641998-12-16016 December 1998 Summary of 981119 Meeting with Util & NRC Re Issues Pertaining to Portland General Electric ISFSI Emergency Plan.Attendance List Encl Project stage: Meeting VPN-037-99, Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas1999-03-17017 March 1999 Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas Project stage: Other 1997-05-02
[Table View] |
Text
_. _. _. _ _ - _ _ _ _ _ _. -.
hhbh
~
ggS 55%g Y"
.p UNITED STATES l
- 5 j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2006H001
% * * * *
4 Mr. Stephen M. Quennoz, Trojan Site Executive l
Portland General Electric Company l
71760 Columbia River Highway j
Rainier, Oregon 97048 I
SUBJECT:
SAFEGUARDS EVALUATION OF THE PHYSICAL SECURITY PLAN FOR THE PROPOSED TROJAN INDEPENDENT SPENT FUEL STORAGE INSTALLATION l
(TAC NO. L22102) i
Dear Mr. Quennoz:
By letter dated March 26, 1996, as supplemented, you submitted an application to the Nuclear Regulatory Commission in accordance with 10 CFR Part 72 for the j
review and approval of a site-specific license for an independent spent fuel storage installation (ISFSI) at the Trojan Nuclear Plant.
In your i
application, you submitted a proposed physical security plan entitled " Trojan ISFSI Security Plan" (PGE-1073).
Based upon the staff's initial review and t
comments, you resubmitted the plan in its entirety by letter dated j
August 15, 1996.
In both cases, the plan was considered " safeguards i
material."
l The staff has completed its review of the proposed Trojan ISFSI Physical i
Security Plan. The applicable regulations for this review were:
l 10 CFR Part 72, Subpart H, " Physical Protection," 10 CFR Sections 72.24(o),
72.40(a)(8) and 72.44(e), and 10 CFR Part 73.
The staff has determined that i
j implementation of the plan will protect the storage of spent fuel at the ISFSI j
and minimize the possibilities for' radiological sabotage of the spent fuel.
This letter and the enclosed safeguards evaluation grant preliminary approval of the plan so that you may begin taking the necessary steps to properly -
i procure resources and implement the physical protection aspects of the proposed Trojan ISFSI.
If a license is granted for the Trojan ISFSI pursuant a
to 10 CFR Part 72, you should anticipate that a license condition pursuant to i
10 CFR 72.44(e) shall be stated in the license, which may be similar to the l
following:
a i
The licensee shall implement the physical security plan, " Trojan ISFSI i.
Security Plan" (PGE-1073), dated August 15, 1996, as amended. The licensee shall not make changes to the plan that would decrease its j
effectiveness without prior approval from the Commission as evidenced by a license amendment.
You should not interpret this finding as indicative of ultimate approval of
\\ \\
your 10 CFR Part 72 license application. Although portions of this safeguards evaluation may be repeated in the staff's final safety evaluation report upon issuance of the license, the technical review necessary to support a final
),/
safety evaluation report and license issuance is still ongoing.
However, the Ng I staff is aware of the need to provide sufficient information for resource management and procurement in this sensitive area and issuance of this preliminary approval reflects that understanding.
22007,4 gc31COGSW u2soou e6u20 DR ADOCK 0500 3 4
/
S. Quennoz.
Finally, although this letter grants preliminary approval, the plan is always subject to further inspection and evaluation at any time, which could subsequently lead to plan modification. Any changes made to the plan prior to l
issuance of the license must be submitted to the staff for review and approval.
If you have any questions concerning this matter, please contact me at (301) 415-1309.
Sincerely, Original signed by /s/
l Lawrence E. Kokajko, Senior Project Manager Spent Fuel Licensing Section l
Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Docket No. 72-17 (50-344) l
Enclosure:
As stated cc:
Service List Distribution: (Control No. DIOS)
Dockets 72 17, 50 344 PUBLIC NRC File Center NMSS r/f SFPO r/f S$hankman CHaughney pe4asnik, NRR VEverett, RIV WReamer, OGC JStokley, SAIC SMersky, SAIC DReid VTharpe (y
\\
OFC SFP0 d{
S FPp,,
SFP0
/ b NMSS p
NMSS NAfE Li(oM dd F
EJLeeds CG k RPiers DATE 1
/96 11/\\\\
11////
11/b/96 11//E/96 C = COWER E = COWER & EleCLDEURE N = NO COPY OFFICIAL RECORD COPY G:\\ TROJAN \\PPP\\TMPPPP. LEK 3
a 1
4
cc:
Mr. Michael J. Sykes, Chairman Board of County Commissioners Columbia County St. Helens, OR 97501 Mr. David Stewart-Smith Oregon Department of Energy Salem, OR 97310 Regional Administrator, Region IV U. S. Nuclear Regulatory Commission Harris Tower and Pavillion 611 Ryan Plaza Drive, Suite 400 3
Arlington, TX 76011-8064 Ms. Margaret Mege N Trojan Licensing ! hison J
Trojan Nuclear Plant 71760 Columbia River Highway Ranier, OR 97048 Mr. Lloyd K. Marbet 19142 S.E. Bakers Ferry Road Boring, OR 97000 Mr. Jerry Wilson Do It Yourself Committee 570 N.E. 53rd j
Hillsboro, OR 97124 i
Mr. Eugene Rosolie Northwest Environmental Advocates 302 Haseltine Building 133 S.W. 2nd Avenue Portland, OR 97204