ML20077S490

From kanterella
Jump to navigation Jump to search
Part 21 Rept Providing Info to Obviate Issuance of IE Info Notice Re Const Deficiencies,In Response to .Addl Time Requested to Strengthen Response If Notice Will Still Be Issued
ML20077S490
Person / Time
Site: Zimmer
Issue date: 09/15/1983
From: Millett J
REACTOR CONTROLS, INC.
To: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-83-990-000 PT21-83-990, PT21-83-990-000, NUDOCS 8309220104
Download: ML20077S490 (13)


Text

_

Reactor Controls, Inc.

R

~

September 15, 1983 l

United States Nuclear Regulatory Commission Office of Inspection & Enforcement 4330 EastWest Highway, Room 305 Bethesda, MD 20014 Attention: Mr. Edward L. Jordan Director l

Subject:

Your letter dated August 8,1983 and  !

" Draft of IN83-XX" Reactor Controls, Inc. l Construction Deficiencies i l

Gentlemen:

We thank you for permitting us an extension to the response date for your subject letter. Reactor Controls is seriously concerned about a negative report and the subsequent effect that could result following the issue of your Draft Information Notice. Reactor Controls has always been recognized as a Quality contractor em- -

ploying competent people.

Therefore in the time available to us to prepare a response, it is our purpose herein to offer sufficient information to you to decide not to issue the draft -

notice. If the information is not entirely sufficient, it is our hope to cause you to at least doubt your first conclusions and give us an opportunity to fur-ther demonstrate that Reactor Controls should not be singled out as a contractor with significant problems of construction deficiencies. Because the projects referred to were completed years ago, we have not yet had access to the indivi-duals and documents necessary to completely research thorough answers. If after reading this letter you are still inclined to issue the notice, we request ad-ditional time to be able to obtain additional material with which to strengthen our case. We also request an opportunity to meet personally with you for first hand discussions.

We do not claim to have never made mistakes, but our QA Program has always been capable of finding and correcting them. De believe that the observations and 4 findings referred in the draft notice dese ve and require complete input from Reactor Controls before being published. We sincerely hope that you agree with us. .We submit the following in response to each item identified in your draft noti ce.

8309220104 830915 .T/7

  1. A h 4 7p fl

{DRADOCK 05000358 PDR yyggy$

395/9 GW-5 1r 45 SOUTH WINCHESTER BLVD.

  • TLX 34-6316 l

- o

. O S:ptember 15, 1983 US Nuclear Regulatory a ~'

1 Commission Reactor Contfois,2 hic. page 2 Response to Comments on Zimer Item 1 - Control Rod Drive Mechaidsm (CRDH) Work Platform a, b, c & d. At anytime during installation of the customer supplied equipment, of which this item .is 'one example, when the work could not be completed in accordance with drawings and/or specification requirements, the cus-tomer or his< agent were contacted to provide resolution. Any and all ddViations.were approved by the customer or his agent through issuance of< a Field Dev'iation Disposition Request (FDDR). Reactor Controls, Inc.

, did not supply any material or items for this installation, and any de-viations from the AISC Manual or other specifications, were the respon-sibility of the equipment designer.and supplier. RCI did not provide any of the materials or items installed.

~

Everything was provided to RCI by the owner except' welding materials, which RCI did provide.

w R91 can accept as fact f. hat the items as" reported during the recent examination may be true.' However we strongly point out that in the

. Jears since RCI left that jobsite a lot of disassembly, reassembly and

~

modifications may have been performed. Therefore to suggest that the prestnt status is the work of RCI is presumptious.

Coment: At the time of installation, the CRD Work Platform was considered

'tempotary due to jnterferences preventing proper operation and future modific RCI did the

, work in,ation would be accordance withrequired to enable the customer proper operation.

instructions as the platform was a necessapy to perform 'other installation operations. The rework of the platform was not= performed by Reactor Controls', Inc. and possibly has J been reworked since RCI left the jobsite.

m m.

Item 2 - CRDH Lateral Restraint Beam

~

a. During installation of the beams, all bolts were tightened with wrenches without reference to specific torquing valves. RCI did not receive specific torque value. requirements for any bolting installations for the period of time work was performed. Later, Sargent & Lundy Engineers did prepare and issue a torquing procedure titled Concrete Fastener Installa-tion Procedure (CFIP) but it was not issued to Reactor Controls, Inc.

It is likely; others have perfomed work in these areas since RCI left the site ~as it has been determined all bolts were tight when installation was" complete.

b' The[use. or non use of washers during installation cannot be determined from information available to RCI. The use of common machine bolts by RCI is unlikely as RCI did not provide any equipment or material during installation.

Comment: Attached please find a copy of a CG & E Field Work Order No. RCI-1 dated August 22, 1975. This is typical of the manner in which RCI was directed to perform operations which did not initially meet drawing or specification requirements. RCI does not have copies of the FDDRs as CG & E issued Field Work Orders to direct RCI performance of work outlined in the FDDRs. '

_. . - . ~ -

. - - - . . ~ _ _ -.

September 15, 1983 US Nuclear Regulatory Commission Reactor Controls, Inc. page 3 Item 3 - CRD Housing. Support Assembly 2

a. This assembly was installed as designed and supplied. Attached are pictures of this type of assembly in the Hatch Nuclear Power Plant which is identical to Zimmer. A check of the G.E. Co. installation drawing revealed this is normal for this installation and the installation was in accordance with the drawing. A check with the component designer, G.E. Co. , indicated this is the actual design of the' component.
b. RCI had no responsibility for surface treatment of the components. The supplier of the equipment provided the surface treatment.
c. Keeping in mind RCI has been off site since 1979, the fact a fillet weld is cracked at this time is not evidence it.was cracked at time of installation or that inadequate techniques were employed to perfonn the welding.

Item 4 - Reactor Lower Head Insulation Frame This work was not in the scope of the RCI contract as evidence by S & L _

i Specification H-2832, page'1-9, paragraph 17.

-Item 5 - Scram Discharge Volume Level Switch Supports The -use' of self drilling anchor bolts was common practice at the time of

' i nstall ation.' The system design specification was supplied by Sargent

& Lundy Engineers and it was not until issuance of IE Bulletin 79-02 that emphasis was given to anchor bolts. The action taken by S & L at that time was the -issuance of CFIP (Concrete Fastener Installation Proce-dure) and it was issued to other contractors on the Zimmer jobsite but was not included in the' design specification for the RCI scope of work.

,! The use of threaded rod being substituted for bolting is not a normal

! .RCI practice and was apparently performed without Site personnel knowledge.

1 The use of " hardware store" quality nuts & bolts is a condition we cannot

- comment on as we do not have' knowledge of what that is or where the bolts t

. were used. The use of threaded rod for a U-bolt was an approved design

! condition indicated on th? installation ' drawing.

To' comment on weld ed c ing stuffed into a tubular support member would be presumptious cr w it was RCI filler material. All filler material

issued by RCI we ate.e , ted out and in and a record of all transactions is on file.

1 The other items identified here may or may not have been performed by RCI

] during installation. Again, keep in mind that RCI work has been modified by others since RCI left the ' site.

.. - . - . - - , . - - - , - . - ~ - - . - , - . . - , - , - . . . . ~ - - . - . - , , . . - . . , - . . - . , .

September 15, 1983 US Nuclear Regulatory Reactor Controls;Inc. Co='ss'on i Page 4-Response to Comments on Brunswick, Grand' Gulf & Pilgrim Item 1 - Carolina Power & Light Company (LER 80-055)

Base plates and the anchors used for installation were installed in accor-dance with the design specification provided to RCI by CP & L. RCI did not have design responsibility and the use of expansion anchors was an accepted practice at the time of installation. Reactor Controls, Inc.

completed installation work at Brunswick in early 1975 and IE Bulletin 79-02 was not issued until 1979. The use of the term " faulty installation techniques by RCI" has not been explained or compared to the standards in existance at the time of construction. The criteria for nuclear power 4 plant construction has changed since 1975 and the increased size of base

plates may be required now, whereas at the time of installation the base plates met the design criteria.

Item 2 & Item 4 - Mississippi Power ~& Light Company (PRD 80/56) and (PRD 82/13) l The-implication in the report that Reactor Controls, Inc. did not have a i' method for documenting, controlling and approving deviations from design drawings is inaccurate. .

The facts surrounding the events leading up to the status report issued on i January 23, 1981 were as follows:

RCI work during the time period of January,1981 was incomplete in relation-ship to the supports being installed for the Control Rod Drive Hydraulic System. The client had determined that new design criteria were being applied for the supports for the Control Rod Drive Hydraulic System and therefore the supports that were already installed probably would not be adequate to support these new loads. It was jointly decided'by RCI & MP & L at this time, that RCI should complete the installation of the supports on

~

a temporary basis in order that the pre-op testing of the Control Rod Drive Hydraulic System Piping and Components could be started'by MP & L. The pre-op testing could not be started;if the supports were not installed for the system. Therefore Reactor Controls did in fact install the supports in a temporary fashion and the installation of these supports was documented to assure all work would be identified. During the installation there were

  • incidences where material was substituted for that called out on the drawings ,

due to information supplied by the personnel performing the analysis. In

, some cases, the material was supplied to Reactor Controls, Inc. by Bechtel Corp., because they had the material on site and for Reactor Controls, Inc.  ;

- to purchase the material in order to complete the installation process at that time would have been time consuming and would have delayed the sche-duled completion of the supports. It was with the knowledge of Bechtel and

~

RCI that some of the support. members were installed not in accordance with

, the drawings because it was datermined the installation was temporary. The temporary installation was recorded on marked up drawings & ECNs .in the

- field and provided to RCI engineering for incorporation into the design ,

drawings to be used for analysis of the permanent supports. When the re-1  ; analysis was performed on the supports, the work was then restarted in ac-cordance with the new design drawings supplied to the field. Where the supports installed were adequate for the new design loads, the information

- was recorded and the temporary installation was upgraded to a permanent installation and inspections were performed to ascertain that the installa-

[ tion was in accordance with the drawings. During the time of this installa-y 4 .wa- y- + ye+ . - ,ps, e.-me v.m* ,y4,y e-n-y g,w_- -g-ny f4' M*' "' "9*T' "' *"9'-"**-rse.-r-y.sv.g y-e en ip- g -- o wp e w yt w-74 % w- . -e,*s e -W 9 - y*m. e y wm---t-pt-y-er*. - wyr

September 15, 1983 US Nuclear Regulatory

' Reactor Controls, Inc. e,Y'"

J Item 2 & Item 4 (Con't) tion, .in the period from mid 1981 thru mid 1982, the client had determined the plant's start-up date and Reactor Controls was informed that our work t could not impact the scheduled operation of the plant. It was during this time that Reactor Controls provided additional personnel and went to a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, 7 day a week schedule to complete the installation of the

supports for the Control Rod Drive Hydraulic System. Due to the re-analysis e being performed on each installation, many Engineering Change Notices were issued due to interferences and/or evidence the initial design was inadequate and changes had to be made. Even though this may have caused some confusion
during the installation' process, inspections were being performed as work '

j was being completed. These inspections were termed initial inspections, a

and with the knowledge nf all concerned Bechtel, MP & L and RCI, a final inspection would be undertaken prior to the final as-built drawings to assure that the: system being-turned over_ to the client would be per the drawings and as designed.

The implication that Reactor Controls failed to follow the requirements of their QA Program is inaccurate. Reactor Controls program required Quality l' Control Hold Information Notices (Nonconformance Reports) be initiated when-installation was not in accordance with the design drawings. QC Hold Information Notices were issued to identify deviations at the time of in-s stallation. It was at this time that Bechtel Corporation chose to point out several QC Hold Notices that had been issued by RCI as an indication of RCI not perfoming work % accordance with our program. Investigation of these'QC Holds by 'Bechtei showed that RCI had performed work in accor-dance with our program. This investigation proved the program identified 4

the deviations and did provide corrective action to correct deviations during the construction process.

The utility constructor's Quality Control personnel were assigned late in the project to do' parallel inspections of the supports being installed by

, Reactor Controls with the intention to eliminate the need for additional inspections when RCI turned the equipment over to the client. These

. inspections would have been required to be performed under the IE Bulletin 19-14 and the thought was to parallel our inspections to provide the 79-14 walkdown inspections prior to the complete turnover of the system. This would enable the utility to maintain their scheduled start-up of the

Grand Gulf
Unit 1 plant. There was at no time an implication made that i

these inspections were being performed because RCI personnel were,not cap-able-of- performing adequate inspections. RCI did in fact perform their  ;

inspections and provided documentation of the work performed and this was turned over to our customer at the end of the project.

Item 3 - Boston Edison Company (LER 82-005)

.The use of the term "four seismic supports not completely installed" does not provide-enough information for RCI to determine the validity of the 4

statement. RCI work at- Pilgrim Nuclear Power Station was completed in 1 mid 1971. Since that time many new designs and requirements have been imposed which are more stringent than at the time of installation. In all probability there has been substantial work performed by others on the supports RCI' installed and to indicate RCI's original installation

September 15, 1983 US Nuclear Regulatory Comission Reactor Controls, Inc. page s Item 3 - (Con't) practices caused pipe clamps to be loose or missing is an unreasonable presumption.

Comment: It is apparent from reviewing the wording of the proposed Information Notice, and investigation of the circumstances identified for each item, there is a lack of evidence to support publication of a document that would be damaging to RCI. Within the time frame permitted to give reasons why we feel this information is inaccurate we feel the RCI response is more than sufficient to raise doubt as to the validity of the IE Information Notice titled " Reactor Controls Incorporated Construction Deficiencies".

We further contend, given the opportunity to provide additional information or to attend a meeting with those personnel responsible for compilation of the data proposed to be published, there is no doubt the outcome would be RCI's ability to disprove the contents of this draft notice. Reactor Controls, Inc. has been involved in fabrication and installation of safety related equipment in numerous nuclear power plants since 1964 and in all cases we have proven to be capable of performing all work contracted.

Our customers have always been satisfied with our work and have expressed satisfaction with personnel assigned to their projects. The publication of this document, with so many unfounded accusations, would be irreversibly damaging to Reactor Controls, Inc. We, as a company are very proud of our performance and our highly qualified and respected personnel. Our perfor-mance has been exceptional and cooperation with agencies has been excellent.

Very truly yours, R OR CONTROLS, INC.

1

{i J ck C. Millett ice President JCM/dh Attachments

l

. . .c "- . g* -.<,...'~,'Fs'

.w .w. ^

-h . W

e. a.3 9' <

.+ .c .

s i ..* .g

- .. Ms

f.  ? , .

s ;-

. . . ;;m. . , . *- 4 ;' .

f- .I Q. * . . * ' ' . .

/,.'j..:- ...

..: .- e.  !

y '. ;

9  % .- ..

. . , < g . *~

3 O

dls ' ?$.l ' : ' . ' -

+

. N ; '.

g - .

h, . . W, #'. ' '-,

-_ . . ,N

._ . 3 ,

l*

a y p.. ,

,.. &yw...  ; ' ,,, ,y . , r

. t ,, - .. :,,,. .

l ', . .

j  ;- , .

sy ,.

.k , .'. , . . . .: * - s .,1

, .w ;;-

..s . ,j

? ,

.. ;% -p.n .%. m.

s

. / 4; .  : n c<.-

! .. m '7 ..,

. , 7 , .. ?'[.f. 'kY '.; h L

M'.

,/[- f*.

I - .

I.

[ ..d M ((5

.'*II ' '- 7*

\*' .

. 4' %~-.  ;; . 'y , 3 , :: - w .R ' > . , "? .

i

'. .. + j ,q -

O,[ [ ,D M '. p --

-'# # 1; - ' _ ' .

.g .. h ,., p. ' y

{s  :

.y ..,y ..:n:.'.; r . . < ,: .

x- '4.

'- -,.; *, ..:.. .4-

\

J

..s.

m. /

,. .y-

% es .r. - -

'. l.

J Lp ,4 .

..(~['

Q'-

. , ,..- . w ~..

y ,[, "...$(-

s- s..

y e..-

y, l

l= .m  ; . .

7 85 .] :. .;, . . >:. .,

, -  : n

. . ' . .. j i, -w . .

  • .= . ; q, . y .,.r,

.3 n. . 7. 3~

J,

  • 3 .**t.A .f ,
. . a,e i 'e

.h ,- .

j

) - . q O ; , ), . . ay 9 -,. 4 . .3 ,y 9 ., . l

.g 4.

2'-, ' 7. , . . , . , ,

e - - -

5 . ., -f .

N ' '7 -....'.'.'n.

Y..

sO.Q q .-' ,

. V. .. .. .. . -c.

t

$, . $ 4 ' . kl *_ . .;~ ..- 2,42 s

.y* ,

. .',g s , ' a. - - f I }
-(.-

',~.',-,.&n,

+ j 1I yi'. . <, -.s y ,'

p - -.m g

. 4 .

v.

.p. 3 ,

4. .- -

.p.. .

.,L.,, .,. ; *,

/  ; 4 g .*; .i a- .

J g T. - gg.. 4 f .,#. - ..,,' ,

l y' .-
:

l 1 - '. , Y'l ..y . - X**

~y ad. .. M u,..

p

  • i., Q ,'f.' - g. ... ,

.j ' . l ,. . f . g. gj ..,. .,- . I:y

,, a g , .. 2, . . % .s

. ~x .

f y,  : L .. 3h L , ; y- ,  :. ; .< ;Mr . nhangui l l-e r .% . :.; u .

5:

}. ll.. l h :j ; & ^ j ._. _' .

- n.!. . ^ ..

. .
. ; _, ,.-y .;..

+- z %x &. ,: -^*=c .

,w-  ;' . 'g & f. ::-: , "

=;3ng. - WV./

,t

(. 4 f: W N:c. .

vh4C .. _

?% w :n Q y*G.l Y;Y E '..hN l:.%. ' ni: w' %g. 5.,.j

  • f'g.L + .ge y y :: (.. . . b
  • i.-

57~%~

t- .

pf (':9.gt. - -y v% L % ;. . -.e.y .;.%' %:.. ;-

.A . .

+

MyNi- . ; 3,, .. .. ,%.e,. .- n G - . - . .

Q . L . +' -'. .  ! -

t f .' % ,b ' f..l 4<ory i c;~.. -

v.-

ww 1 .- .. ., :n>e hM. i. ~

,.. [g ( ; :D. IJ [,;..~ ( 5 1 $ Q ~"9. t s q k..-

; e

.,..-..,. . ,S .%, :./ . q . . . . .,_ ,,. .y p +q..L 9' m;;;. ,

.. n  ; -

L s;' y;

<. l c > .,,,-_, . '

pR ~. f ;- ~ ' - -g .5 n. _

GY~, a';; ~. ...y'?". -

, .:;yg (: , ,%x ':.+7,peo"c .< > ~ '

v .& \. .:.s. .' .'.O ^ o ;1. . -~ Y,..a

. j: . .f . .. . ,

d, . 4.. ;.>b- ..,1 $ i>.C. .: . . % 2 . 4

.*  ; d U .' M:, .W ' N. .s :... . . .

m. . . ..-:w2 ...,,.

n M...

y .. E.S.- w.. a, x - s : ,y .. . ..

g  ;. : , . .r

.'d

.,.s

+.y 4 - g.l . * -

i 5 .-

. f ;. :;.4g

..c r. '.. '% .;f.,'-

\ n;.g - y < 2 ' . Wise %:::f.?. ,; _  ;

,: ., .j.  :. _ , . .i. ' :f;~c:).' M .x Q:p.[ f,L.3 3

, a

[ y ' f 3;. . g;M- .v 1- . . <.

., .-.n..-< .1 .. .w w--.

e%%.. ..~ .

g.. ,

.- ' [,5
i. . 4. s ,- n .Q c  : i l .' f. .

%.; .c. ', s-

. ,': -l -

V 4 .

3 . yp - l -:19w'gi(n

~e' ' '-

-S f. e.

4 3

. u.a .j . ' --

  • w..  ; l; .

g

'~},'[..-l R- ),

@? h ; F; ..

cl,> .*.**t*9&mik c. 6 #'

.;-?

. ' h , '-

V l. *., a he fb:

l "h f

? j  ;;

}.f r l

1

~.: gM .,'yc_ < _ t .,y y. a:

g 3,g: ,

'.e "

..h

. - (c% i s ' . .. , . . . .*. :' g;j 2 s.a W,v,...:. ?

  • fy' ,,
y ef yp d -

, jj w-

.V. 79.a a. m si.

g..,

4 t ,m:g

  • * . . . p.p. . .y 4:,;;~r,. . v.g.

g , .

a. ,

r: t .. . , . .

3 hb .

;.  ; f,.

fy_

  • w- .

x, m nv.L uw

[

wn +.z

.- 3 ;m:% R n.Lg v.n?.-m:c:  :

1 zh w.. ~

'.1 ;c :i.. '

a :

g* L.a

% .fzu... .::; 4 a 2%-Vy':'..,.' 4.f .- n ",. . m a

. g TM x..

.- e

-. y '

. .: - . ., ;.:g.2: ^ _ . .:. . . ,. .. . g .4 3: , ,, . ; - .;

. .-x y .:

y - Q l.

^

. v .;. ~ p .; _S ,. ji?.

.g k Q '?g,C L; '-cf. p. r . nlp;B.% ? f i R ,5

: :." .. g;; .y . - %;!;. g .?y-u 7 ; 'gg ' , g~y ?.P.

+

~...

n  ;&.;w-s

7. .

4 -;. , . 7p n% Q;.;p;;9.

- Gm . .

j.9.V. . ;. 3.[ .; Q.

.g. .' ? ;
>sn .zX. yh, ar Y(f . c:-

-r '

f. . :.~ v.sy'3 . : t .,,,. .;1 , . :. :3 , . 3.

. w u: .,.- :' .. M.%.f, y $ .;. c. x . .p:.<

[ f

.. a; y ; me, ; . ,; vlI 5 *' -

  • T.;;" '. ., .. . , .. .
n. ~

, - .uy t'

; ,. .y -

7, f.v.?. . .;,,u. . . c , g.. ,.,

.E .*

~,' ' T;" * . - ' '

.c. '. K.y 3

"\ ,, _

n.

. t , 'e )  :. . .c . .

  • i, '. . ,

, . ', .*f ,., ,., .' ': c - ,J'j.

a .t + :
g. - * . -- .

2- j

[  ;[ :-

l

..=.;..'.,...'f'^t.-

. " . . ;, a l .; ,

p  : $ -  : .f-

. ; . ,. ., f. " i .-f.. _-

  • -4. ' .: : ,; . , .--  ; .;  :: . . .. -

.._ l

s. - , , . . . . l

....:,,.....\. f r. s. g

. . . _. :. ,s..a, t_;

- - . . . , ,, . 4, y

,/%g, " . p I,., .'.$-' e. .../,,,,f,,,,,t.gf, - :

"Aw:- ,.

.. v . , . . '* " '},j. _. j .4 ,

l '.". } - ~,.l " '

r;.??q . l.. .h ^ . . l [ ' y , ? .* '

a..

h 5.  : .

'7

~

.' [. k

..: -y

.. .. -  : :. .+ , i. . < .c...
.z.

(.su.

. na.s :
.g

( W [

~

. ,. l:. -
A -

e x.

,,f.  ;

, f 1

{. - -

f.t W <- l.e.3

..fl ef,  %. :3 A

v,- .4 , , c; - -

Vy . .,. .,

}

?, ;; ; ; .: . :m

..~.:_

C.

c..,...- .y ,.c- 4.:c -

,: .,- .e ,: . _

W., v. i .- J . - - . . ;m. _., -6 .:: . . .. 'e. -c:

n~

n:n y . .~ ,
  • mgN: . :n .w ,5 , n +_ ::: ;:x.e ,

. + -Q ,. ; 1 ! 3 , c.7,.

l'" v N 4. ; , y p As N ,e 4... . ~ ,f ; . - :4 i ' *; ; .

< v*~  ;.

, ww l ,c;

.,,-l,

'q'y t..1.;e. 1. -'

c. , g , f , gs.h/N

. s-4;.'.

7 g, .j . e. y, .. lo. ........,-

v g- , . _ . . . y,. . . ., y . , .

zl*;.f(>gy;.,,;....-..7:; T ,

L.y-..f. , - '

.. .- . .s ..

i L q.; ... @

{ . R_[f. ( .:> .. +.p.. :+

L g .%. .xc., :.,;;i.6.:%... 9 . ." . 4 . . J . t ' y. . , . h. ;,_ .%.~ . c $. _ Q. .::

7

.; .; w A. g : - ..;.3

.x m. .. .. .. ~. . .v.c

.  ?. . x. :,pc< .. .; . - t .. r . . . . c.

.:;s

.;., n . m, , .: =. , . ' s : . ..

  • ?? := - ; . N; ).i J. k . l 7 ; . .. . .a P 4 4: : . .g, .9 .

e r by 1 & .,; - - - My S: .,

u.

g x[x.
g 7

.gg .

. '% h .$ s.r 9, T]4 h.f;.. g. .e w

3, . .

- ,_ . J .. .s. ,s.

.~ ,. .

. ; . a u. . .*, j- . . tr ., -

J

,.:. s . .-

'c e..

..;- .:  ;% ; .:. .e  :

c .-::m.

5 I i s* ; . , ,  ;-.';_% . . n. ,,. . ... . ... ." '.-:; . . .

L  : s+- mx y_.-r-

.6 .r -. '. . . o. . e : .:

n- . .

,: .4 '.: , .:. g . :. %: :.' .J. u?;

Q: y. . '; -. ' .3 ::_ f:' ; . a.- i !.N

.l.: y - - *. 'u-J '; .

' ~_;.. .

f. ,l. . -

l [.  ?.;  :. . j :r e -

y ,. '_; ;f: f . .'; .: - * *. g

[. " .. ,

.[*k N :. . . .

t y: j 3..

r' , .; 3 - S_..vj  ; g, a., . , j.d - .. y i y %pl - 7L - "'  ; D: - . . . . , ;. f j (; ' V ' .  : <

i' .f.sg *' ,:k : ; ' :; . .- J.."

  • g g e

' 1. j

,- ; J pb v-,- -,;, -

j r..

;J . '..g. ,lp . 7.-

r . < - ;. , - r.

y ~ l ,-; $.':

I l

.Yi [_. ,\ , k, . .h, _

ll Q f, .". .,N. _ . . . . &. . Q'. }l .*4 .?:?_'

. . ~ , _ . ... . . , ,.- . . 4 3.

s ..

,.o n , . , . .. ..

.c .

  • '~% I 4 a . .? ( ' : "l C w ' . .. -  :.

M. :s b;f. ]

l f, Q .i , [ .

_' V . ( _

. ..; [*... ,[:.y l  :: . ;.*,. ;;_ _ g __ ;_::. L '

. " . :; - .-x

y. n^ .?..

L.. - :..:: - .- :.

.' . , . ._ G .>.

q .y_ o. . . . . . '

.o -

e - x; -

S. .. .~ .

. c . ,.

3

' : f. -

.% N A - - _ k.Y

'y ? Y .h k Ni -l . . . l. t. '*Y -

hl

p. Q .; ~

.x  ; . g.; r,;.

3

. k. ..

.~

l  ;

" =; Q.;,:.; ?... c.5g- g @.

nR. .: 9) :... u % W.

  • '. ;i.; ?

, ,;#g .1h.:?

lL.h.,5.h. Y N. Y.g

{.&?+l cp g

%< g

.. f.n&.e ~ ~ . n",(p'y?>;.-

pw?117

. .a..

a c

i4 ,7/3; t

1. A * ~k g'

.~.. ,& . o 4.. . ... . r.m .

~.

. .y . Tile CINCINilATI GAS A ELECTRIC COMPANY J .

COLUM3US AllD SOUTHERN OHIO ELECTRIC COMPANY' THE DAYTON PO';lER AND LIGHT COMPANY

~

P. O. Box 960 -

Cincinnati, Ohio 45201

, FIELD ORDER NO. fd]- / DATE: August 22, 1975 To: Reactor Controls, Inc.

Attention: John Klaus RE: Contract No. H-2832 R.P.V. Internals and CRD System

.J Gentlemen:

You are hereby authorized to perform the following described work in accordance with the cost plus provisions of the above contract:

1. Furnish supervision, labor, tools and equipment and do all things necessary to erect owner furnished CRD Housing Restraint Supports and Beams per G. E. Drawings 762E658 and K.E.I.

CSK-195. -

m.,.,

,x P -'Q/s, ,-

v

%d i W 'NP t/

I if G Q

.T Daily Time Cards Signed by Kaiser Engineers,'Inc.

The estimated cost for the above work is ,0 r .ine MI*vc M This work is.to be invoiced separately with reference made to the above Field Order Number. Invoice must list labor and material separately. Charge this work to W.0. Item .

Very truly yours, i

THE CINCINNATI GAS & ELECTRIC COMPAriy f

f r

- By cc: I ,

9

' ,$ h qFiel

~

_d Eng(neef r l e r Approved: M bllN

/, Field Project Engineer i

i fDUlDUOLDiWRlk

l , U1 U. Dr.'.'2T'UCI,FJ.R TOL'rt: STmon .j .Tg po,/ g-,. /U ppge . g f. 7,,, , ,s _,. -(

b.f 4 .W ra c.??. u.v. ni un. tcw 39. r. s rrtrm u. ra-n ne t y . ra d r.a d. E U c . . Cmrrce<. stoo &hv4

. */tal E 970 2--

l licw wa horcm.r G.l\ Cox

- -,, .-......'..---~~,t )- 6 -75 -

.1 ,

.. .21s ym mjmr mais m y ;_ x u.at ua t.cMtp tu'-

.ni,kl.=C, exih , _,

qc;g gj

~~

CRDIb.ai Svan' "GE,  ; '2~184

'.'1%'s.2)E l<3 GT p* r, FIT UP PROBLEM WITH CRD SUPPORT BENA BRACKETS bO ,.I'E,' i

' U s EMBEDDED SUPPORT PLATE.. .

. D .

' L BRACKETS 6 18,2.1422 To LON G . O ..d l l '{FI l IE.  %" GAP ON ONE SIDE OF BKT.dr7 ( EMB.RO['OfEtu f d( D W r G " q ti$E @W W piil $h5b bE5M a/ i

$ M. i.. ,. ,

s n u:.;..t::.. on.o {

  • Qgg y ---
+

n .

.. f k. .... .. .t-th 9 Q 'lyAh2N h:---f t

$f ! f-bf}  ;

Pi RE TO CLOSE %" GAP ( \NEl.D P R DETAlic C..

9.II.P~"

BLriTER BRIGET .*17. QAE 9+w  !

4 +elee m. R.a.Pr.v d.,.

k. ..

c .

.. t .R - A b h P. -1 n 6

-hD BE/dli SUPPORT B@- I ,tw'e pmp;c.4

~

', p } ,,. , . . . ._

i 6e ,

.{ 1 .i. r - -

ct p t o< ed b ig S c_./_ i

/ gg. .7u kl sob n#n (

lht- f+,(%.

{

j  ??

~

l!' *

^

~.

CswcrL.63W\\

t o % p . e .dQA c n ag w g& A. w .

A n g i

1

. W.[ L. i_ --

T ~~ f . ,

W Nt AfaMGMWO TO FIT &(W

.M,%h;l;?". .. [ RD

! dE/VhA du? ' ORT .

. d ABED. M.D PLJJ:

i

.,.v..s9.,$y).

.:,.g'i;. t TM e ?.. A 7 I\

' / O' 1/

gumn Gta

,' P FQ.

it hF . : -m .> .-- b yf>p Wrru Wl'A D

  • .,f..k.)J '." -l S.. g . , , tqx,~gtx '

%g,G.AF "y.V,h+

3 (1Tfr y

X'? u K s  %,. T h.

i'

>? .
j. ? A. .. ;)imTUP g.e - ? S GAP.! Vs g) J \*- F%.-

'g t . ',- : .s - t .

3 '

.] ~..' ~ . . [ ~

\. ~

} ,,, .

m.

. n .,

i73.y'

/ DETla t.c .. . 3 l

.hy sse omit c i

,"J, .

r'.'!?

1

\

. on'.-M'- u a . o d (A).?.X M EM03 = wU . 7-9.W

~

.L,

w. a t.n c,ut. (I O /C:,#

, chb "h;h:y.r- WF K .

_;} s' LW 7- Q t;.

< d c

. i

t

. 9 GENER AL @ ELECTRIC . .

~

PLACE Moscow, Ohio TO J I,_ Billings _._ -

Kaisci;_ Engineers _Inc. DATE 9/11/75 Zimmer Nuclear Station CC:

SUBJECT CRD Support Beans and Brackets Ref Kn-1-13 dug - 761E970 Sheets 1 and 2

~

Due...to . imbed. ment. problems., mo.difica. tion...of... General Electric. supplied equipment ,

...is,,, authorized a s . follows.. ,,_., , , , _ ,

B.eam.. 3. , ,

. Install.1/16... shim .betwe,en. bo.tto.m of beam and bracket # 11.

Beam,.,6 . , .,

... Bracket 23 .- ,.cutof f ,1,/2" ,q ,, g , , .. . , , , , , , , _ _

Bracket _24 - cutoff 7/16" , , , , . ) , , ,

... .. .. ... ..B_ .e..a.. m. . 2 ... .Br..acket.10...... cuto f f 1. ./.2. "

... Bracket 11, - , cutof f 1/4" , , , ,,

  1. 18 Bea m , 7,, . En.large , hole in . beam so bolt will .go through beam and bracket approx,imately 1/8",. ,, ,

Beam 51,,,,,,,, ,. Bracket,,21 cut long leg so bracket will fit on embedment not to

. exceed lh". ,

Bracket 22,,c,,ut long leg so bracket will fit on embedment - not to exceed ,1b". . , , , . ,,

Brackets 25, 26, 27,,,28, may be cut or. ground to , fit.

-, m . ,j

.j . . . . . . . . . .

s J. i.l. .l'-l'.j .j:...m.;b.. c e m..:./ : .

.;g.lY;.;.;....!,. ..

1...t......

i;,1;lii.:. t. /. ! .p~.' w '. . .. .

. . l

. 11 .'l.E.l.,.'i! ' n '

N. 5 * ~~ ~ ...i.n..

  • 5':..'.. . ll

' ' ' ! ' l ,55' l' f -;,' -

) -

./t k- - - .

.. m '

l > ~ c;3 .vuj j)yy ;i s, c.,, , n z(/, I -  !

- I;(;nl ',li Iqz - 'L~ j; "

/

ia -

3-

. u;c .- \ _ , ,Y... -

5-

.. .. . .a. .Q. . . . . .. = p .i l-

. 7. . .

. . ,,,,4l^A v b-ed . $ mA '

.. $'i=. -

' 0"'0"L"' " C' ' ' " '" "'*^ ** ,

SIGN YOUR .N AIAE PLAIN!.Y

. 6

, . . <g

~?

.- 3: x ,....__ : :=

KA/SER

_ gyg,ggggg; rp 55 _ _

3.;;;,i;,; .

, ^^ . ._ -

I~ I 'A..  ;., _ s

.s  ; ,.3,., {_' s

~ ~

, ,... 7..- j"22-h. is

,.T,0 - /S VIV5 iM/SE ' A$$

  • _ DAT E:

? ,

AT: -

-f?C20Y , 0 /I) ' ""

e=:.:;-s=::=

FR0M:) h WS Wf$b-Q;lG;;_ .

pf ypfff gpQ  :. :. _

7 . -.;:2 .

CbPIES TO: -_ _ i /88f d,W/Yf[ M AT:._/[#S("M.(N [

$1][}n[/$q~- //f,s & W f/ '$ ' ;s

~

, :: : $$,i'

' ~

~^ ,.~ J0B NO. .- , ,,

~ it..

. 1.?= = = ~ + ~

.:.u= = - =

3 ~'*1-idE :: 2 =.uHANDWRITTEN MESSAGES ENCOURAGED - 7 -- --

= ' -

.y __

w X: -

eM8

SUBJECT:

/ M,F / WM/S .

1t;/wr _z z a em an;/ eenos & Bra ~r *s7 q&no sLs g/rs dygazedo s/w6aoWW6. L: )

b yL?mt & J-/2 e 9fy 9,/LJf 7J' (_,42fffc/fr.$ [

f 6 xcr d s ril d Sir A5iezp /wms ,yo .ns.%_

/ 5 E E Q 0 0 0 S .ii T I! H M

/ gp = un mau wavau ma "A AMI V

/ . UIYLI .

i l

l I

F02W ELF 1 L

  • GENER AL h ELECTRIC )

TO J.P. Billings PLACE Hoscow, Ohio Kaiser Engineers Inc. DATE 9/15/75

~

Zimmer Nuclear Station CC:

SUBJECT CRD Support Beam and Brackets Ref KN-1-13 dwg- 761E970 Sheets 1 and 2

,Due to imbedment, problems, modification l of General Electric. .s.u'p'p. lie.d. . equipment..

is authorize,d as follows. ,,, , ,. , ,. ,

Beam 7 Cut long leg on bracket #18_so. bracket will fit,imbe.dment,..This.must..

leave 3" of the, beam bearing on_ti he bra.cket...

Elongtethe,holeinbeam7180, fend..toalign..beamand...racketholes b

k h t-

' ~

i

..h.. . f.j k.. ,

j l .

. .v, ., . .{..

1 f - Jh,7 ,

( " **

f A--

51 N YOUR 7AME PLAINLY ,

i FN.3 ' 6. A (848) N ev.