ML20065N107

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Control Cable Length/Sizing. Initially Reported on 820922.Deficiency Determined Reportable Under 10CFR50.55(e).Final Rept Expected by 821022
ML20065N107
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/08/1982
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8210220078
Download: ML20065N107 (1)


Text

Georgia Power Company Post Office Box 4545 Atlanta, Georgia 30302 b Teiepnone 404 522-60m Vogtle Project Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 October 8, 1982 United States Nuclear Regulatory Commission a ',,.

Office of Inspection and Enforcement N 1 0~,

Region II - Suite 3100 3- 12 101 Marietta Street Atlanta, Georgia 30303 File: X78G03-M27 s

Log: GN-196 yy m

Attention: Mr. J. P. O'Reilly E. E,?2 o ,so

~~ 7

Reference:

Vogtle Electric Generating Plant - Units 1 & 2 50-424; 50-425; Control Cable Lengths C -

y Gentlemen: ,

On September 22, 1982 Georgia Power Company verbally notified the NRC that the previously reported potential deficiency concerning control cable length / sizing had been evaluated and detemined to be reportable under 10CFR50.55(e). A final report of our evaluation will be submitted to the NRC by October 22, 1982.

You truly, i /

<0.

D. O. Foster Vice President and General Manager CWH/00F/tlp xc: U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr. , Director Office of Inspection and Enforcement Washington, D.C. 20555 R. J. Kelly H. H. Gregory, III R. E. Conway E. D. Groover G. F. Head L. T. Gucwa J. T. Beckham, Jr. M. Malcom J. H. Boykin C. R. Miles, Jr.

D. E. Dutton M. Manry R. H. Pinson P. D. Rice D. L. McCrary R. W. Staffa R. A. Thomas J. L. Vota J. A. Bailey W. F. Sanders

0. Batum 0 , , v 9-8210220078 821008 PDR ADOCK 05000424 S FDR