Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2
ML20198L647
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/31/1997
From: Hargis T, Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0965-L, LCV-965-L, NUDOCS 9801160083
Download: ML20198L647 (7)


Text

- - _ _ _ _ - _ _ _ _ _ _ - - _. - _ _ _ _ _ _ _ _ _ _ - _ _ - - _

  • ~

^.

  • C.lt McCoy.

Southern Nuclear Vee President

- Operating Cornpany, be.

t Vogtie Project 40 inverness Centor Phray l

P.0 Box 1295 :

Birrningharn. Alabama 35201 Tel205.9923122 Fax 205.992.0403 SOUTHERN h-COMPANY Energy to Serve 1ourWorld

January 12, 1998 LCV-0965 L Docket Nos.

50-424 50-425 U. S. Nuclear Regulatory Commirsion ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the December,1997, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units I and 2. Southern Nuclear has revised the content and format of this submittal in accordance with NRC Generic Letter 97-02," Revised Contents of the Monthly Operating Report", dated May 15,1997. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely, s.

C. K. McCoy CKM/JLL Enclosures cc:

Southem Nuclear Onerating Cor,many Mr. J. B. Beasley, Jr.

7 Mr. M. Sheibani NORMS-

/- r

'j

.b

[

_ro

,i w a J J -

U. S. NurJear Regulatory Commission Mr. L. A'. Reyes, Regional Administrator Mr. D. Jaffe, Senior Project Manager, NRR Senior Resident inspector, Vogtle,

iN th1 Mll Nl lle k'm jr y!Llu,li,,1]41illi{olhl 9001160083 971231 l

{'

l ai,,,

  • PDR ADOCK 05000424

^***

R PDR

f e.

ENCLOSUREl i

VOOTLE ELECTRIC GENERATING PLANT - UNIT 1 l

MONTHLY OPERATING REPORT FOR DECEMBER 1997 l

l TABLE OF CONTENIS OPERATING DATA REPORT and CilALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2

__m___..__m._______

_m____

OPERATING DATA REPORT Docket No.:

50-424 Unit Name:

VEGP UNIT 1 Date:

January 2,1998 Telephone: '

T.S. Hargis Completed By:

(706)826-3469 OperatingEtatus

1. Reporting Period:

Dec-97

2. Design Electrical Rating (Net MWe):

1169

3. Maximum Dependable Capacity (Net MWe):

1162 Ibi1Ronth YeatIo.Datt Cumulative

4. Number Of Hours Reactor Was Critical:

744.0 7,257.2 80,972.0

5. Hours Generator On Line:

744.0 7,169.3 79,674.8 0.0 0.0 00

6. Unit Reserve Shutdown Hours:

_ 880,876.0 8,270J.07.0 87,462,312.0

7. Net Elec;rical Energy Generated (MWHe):

CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag ido.

Event Desenption NA NA NA E1-1

l UNIT SHUTDOWNS Docket No.:

50424 Unit Name:

T/EGP UNIT 1 Date:

January 2,1998 Completed By:

T.S. Hargis Telephone:

(706) 826-3469 R: porting Period:

Dec-97 Iype Method of F: Forced Duration Shutting Cause/ Corrective Actions S-No.

.Date Scieduled (Hours)

Reason (1)

Down (2)

Comments NA NA NA NA NA-NA NA (1) REASON:

(2) METHOD:

A < Equipment Failure (Explain) E - C perator Training /Ucense Examination

1. Manual
4. Contgiuation

.. Other 0 Maintenance or Test F-Administratlve

2. Manual Trip / Scram C - Refuchng G OperatenalError(Explain)
3. AutomaticTrip/ Scram D - Regulatory Restriction H - Other(Explain)

CAUSE/ CORRECTIVE ACTIONICOMMENTS:

NARRATIVE REPORT December 0100.00 Unit at 100% power with no operating problems.

December 3123.59 Unit at 100% power with no operating problems.

E1-2

ENCLOSURE 2 =

VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTilLY OPERAT;NG REPORT FOR DECEMBER 1997 TABLE OF CONTENT!i

- OPERATING DATA REPORT and CilALLENGES to PORV a:td SAFETY VALVES Page E2-1 UNIT SilUTDOWNS and NARRATIVE REPORT Page E2-2

~

OPERATING DATA REPORT

- Docket No.:

50425 Unit Name:

VEGP UNIT 2 Date:

January 2,1998 Completed By-T.S. Hargis Telephone:

j706) 826-3469 Operating _ Status

1. Reporting Period:

Dec-97

2. Design Electrical Rating (Net MWe):

1169

3. Maximum Dependable Capacity (Net MWe):

1162 Itt.Jdorib YeaLTo_ Dale Cumulaitve

4. Numbei Of Hours Reacter Was Critical.

744.0 8,760.0 68,823.8

5. Hours Generator On Line:

744.0 8,760.0~

68,159.2 G.0

~dTO 0.0

6. Unit Reserve Shutdown Hours:

- 884,151.0 10,310.828.0

~

75,586.726.0 7; Net Electricci Energy Generated (MWHe):

CHALLENGES TO PRESSURIZER PORV AND PRESSUR12Ert SAFETY VALVE 3 Date _

Tag No.

Event Description NA NA NA E2-1 l

UNIT SHUTDOWNS

~

Docket No.:

50-425 Unit Name:

VEGP UNIT 2 Date:

January 2,1998 Completed By:

T.S. Har{s Telephone:

(706)826-3469 Reporting Period:

Dec-97 1YPe Method of F: Forced Duration Shutting Cause/Correctivo Actions S:

No.

Jate Scheduled (Hours)

Reason (1)

Down (2)

Comments NA NA NA NA NA NA NA (1) REASON:

(2) METHOD:

1 A Equpment Failure (Explain) E Operator Trainingluceme Examination 1 Manual

4. Continuatic, B - Maintenance or Test F Adrainistrative
2. Manual Trio / Scram
5. Other C - Refueling G OperationalError(Explain)
3. AutomaticTnp/ Scram D - Regulator, rtestriction H Other(E@ lain)

CAUSE/ CORRECTIVE ACTIONICOMME14TS:

s i

NARRATIVF REPORT Dece mber 0100:00 Unit at 100% power with no operating problems.

Dec^mber 3123:59 Unit at 100% power with no operating problems.