ML20198L647
| ML20198L647 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/31/1997 |
| From: | Hargis T, Mccoy C SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LCV-0965-L, LCV-965-L, NUDOCS 9801160083 | |
| Download: ML20198L647 (7) | |
Text
- - _ _ _ _ - _ _ _ _ _ _ - - _. - _ _ _ _ _ _ _ _ _ _ - _ _ - - _
- ~
^.
- C.lt McCoy.
Southern Nuclear Vee President
- Operating Cornpany, be.
t Vogtie Project 40 inverness Centor Phray l
P.0 Box 1295 :
Birrningharn. Alabama 35201 Tel205.9923122 Fax 205.992.0403 SOUTHERN h-COMPANY Energy to Serve 1ourWorld
January 12, 1998 LCV-0965 L Docket Nos.
50-424 50-425 U. S. Nuclear Regulatory Commirsion ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the December,1997, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units I and 2. Southern Nuclear has revised the content and format of this submittal in accordance with NRC Generic Letter 97-02," Revised Contents of the Monthly Operating Report", dated May 15,1997. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely, s.
C. K. McCoy CKM/JLL Enclosures cc:
Southem Nuclear Onerating Cor,many Mr. J. B. Beasley, Jr.
7 Mr. M. Sheibani NORMS-
/- r
'j
.b
[
_ro
,i w a J J -
U. S. NurJear Regulatory Commission Mr. L. A'. Reyes, Regional Administrator Mr. D. Jaffe, Senior Project Manager, NRR Senior Resident inspector, Vogtle,
iN th1 Mll Nl lle k'm jr y!Llu,li,,1]41illi{olhl 9001160083 971231 l
{'
l ai,,,
- PDR ADOCK 05000424
^***
R PDR
f e.
ENCLOSUREl i
VOOTLE ELECTRIC GENERATING PLANT - UNIT 1 l
MONTHLY OPERATING REPORT FOR DECEMBER 1997 l
l TABLE OF CONTENIS OPERATING DATA REPORT and CilALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2
__m___..__m._______
_m____
OPERATING DATA REPORT Docket No.:
50-424 Unit Name:
VEGP UNIT 1 Date:
January 2,1998 Telephone: '
T.S. Hargis Completed By:
(706)826-3469 OperatingEtatus
- 1. Reporting Period:
Dec-97
- 2. Design Electrical Rating (Net MWe):
1169
- 3. Maximum Dependable Capacity (Net MWe):
1162 Ibi1Ronth YeatIo.Datt Cumulative
- 4. Number Of Hours Reactor Was Critical:
744.0 7,257.2 80,972.0
- 5. Hours Generator On Line:
744.0 7,169.3 79,674.8 0.0 0.0 00
- 6. Unit Reserve Shutdown Hours:
_ 880,876.0 8,270J.07.0 87,462,312.0
- 7. Net Elec;rical Energy Generated (MWHe):
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag ido.
Event Desenption NA NA NA E1-1
l UNIT SHUTDOWNS Docket No.:
50424 Unit Name:
T/EGP UNIT 1 Date:
January 2,1998 Completed By:
T.S. Hargis Telephone:
(706) 826-3469 R: porting Period:
Dec-97 Iype Method of F: Forced Duration Shutting Cause/ Corrective Actions S-No.
.Date Scieduled (Hours)
Reason (1)
Down (2)
Comments NA NA NA NA NA-NA NA (1) REASON:
(2) METHOD:
A < Equipment Failure (Explain) E - C perator Training /Ucense Examination
- 1. Manual
- 4. Contgiuation
.. Other 0 Maintenance or Test F-Administratlve
- 2. Manual Trip / Scram C - Refuchng G OperatenalError(Explain)
- 3. AutomaticTrip/ Scram D - Regulatory Restriction H - Other(Explain)
CAUSE/ CORRECTIVE ACTIONICOMMENTS:
NARRATIVE REPORT December 0100.00 Unit at 100% power with no operating problems.
December 3123.59 Unit at 100% power with no operating problems.
E1-2
ENCLOSURE 2 =
VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTilLY OPERAT;NG REPORT FOR DECEMBER 1997 TABLE OF CONTENT!i
- OPERATING DATA REPORT and CilALLENGES to PORV a:td SAFETY VALVES Page E2-1 UNIT SilUTDOWNS and NARRATIVE REPORT Page E2-2
~
OPERATING DATA REPORT
- Docket No.:
50425 Unit Name:
VEGP UNIT 2 Date:
January 2,1998 Completed By-T.S. Hargis Telephone:
j706) 826-3469 Operating _ Status
- 1. Reporting Period:
Dec-97
- 2. Design Electrical Rating (Net MWe):
1169
- 3. Maximum Dependable Capacity (Net MWe):
1162 Itt.Jdorib YeaLTo_ Dale Cumulaitve
- 4. Numbei Of Hours Reacter Was Critical.
744.0 8,760.0 68,823.8
- 5. Hours Generator On Line:
744.0 8,760.0~
68,159.2 G.0
~dTO 0.0
- 6. Unit Reserve Shutdown Hours:
- 884,151.0 10,310.828.0
~
75,586.726.0 7; Net Electricci Energy Generated (MWHe):
CHALLENGES TO PRESSURIZER PORV AND PRESSUR12Ert SAFETY VALVE 3 Date _
Tag No.
Event Description NA NA NA E2-1 l
UNIT SHUTDOWNS
~
Docket No.:
50-425 Unit Name:
VEGP UNIT 2 Date:
January 2,1998 Completed By:
T.S. Har{s Telephone:
(706)826-3469 Reporting Period:
Dec-97 1YPe Method of F: Forced Duration Shutting Cause/Correctivo Actions S:
No.
Jate Scheduled (Hours)
Reason (1)
Down (2)
Comments NA NA NA NA NA NA NA (1) REASON:
(2) METHOD:
1 A Equpment Failure (Explain) E Operator Trainingluceme Examination 1 Manual
- 4. Continuatic, B - Maintenance or Test F Adrainistrative
- 2. Manual Trio / Scram
- 5. Other C - Refueling G OperationalError(Explain)
- 3. AutomaticTnp/ Scram D - Regulator, rtestriction H Other(E@ lain)
CAUSE/ CORRECTIVE ACTIONICOMME14TS:
s i
NARRATIVF REPORT Dece mber 0100:00 Unit at 100% power with no operating problems.
Dec^mber 3123:59 Unit at 100% power with no operating problems.
E2-2 l