Deficiency Rept Re Electrical Separation Criteria Specified in Const Spec X3AR01.Initially Reported on 870909.Second Test of Electrical Separation Requirements Very Positive. Final Rept Expected to Be Submitted Prior to 880301
ML20236V298
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/19/1987
From: Rice P
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GN-1414, NUDOCS 8712040219
Download: ML20236V298 (2)


Text

T Georgia Fbwer Company -

^

Post Office Box 282 Waynesboro. Georgra 30830 Telephone 404 554 9961, Extensjon 3413 404 724 8114 biension 3413 L

no.mc. Georgia Power

\ , .

vNieY e$ November 19, 1987 w weac wem U. S. Nuclear Regulatory Commission

~

ATTN: Document Control Desk File: X7BG03-M140 Washington, D. C. 20555 Log: GN-1414

( _.

Reference:

Vogtle Electric Generating Plant - Unit 2; 5 425 I Cable Separation Within Panels Letter GN-1403, dated 10/6/87 On September 9, 1987, Mr. R. E. Folker, Vogtle Project Quality Assurance Engineer, notified Mr. M. V. Sinkule of the USNRC-Region

, II of a potentially reportable condition involving the electrical separation criteria specified in Construction Specification X3AR01.

l_

In subsequent correspondence with the NRC, Georgia Power Company ,

indicated that a final report on this issue was expected to be submitted by December 1, 1987. However, after reviewing the results of a detailed study comparing the test report performed by Wyle Labs on electrical separation, the construction specification, design criteria, and the FSAR; Georgia Power Company (GPC) decided to perform further tests on different configurations to extend the results of the original tests. These tests wre designed to j the same criteria as the original tests and were performed by the '

same laboratory.

This second test of electrical separation requirements has been performed by Wyle Labs. The preliminary results are being reviewed and are very positive. However, because of the change in plan, a final report on this issue will not be available for submittal by December 1 .987, as expected. GPC currently anticipates completing the i piew of the test report, performing a plant walkdown if required, anc submitting the final report prior to March 1, 1988.

This correspondence contains no proprietary information and may be placed in the NRC Public Document Room.

?

/, i ' ,,ftr.2&vu P. D. Rice PDR/wkl 6

8712040219 871119  !

PDR ADOCK 05000425 \\d S PDR \

File: X7BG03-M140 Log: GN-1414 Page two l

xc: H. G. Baker D. R. Altman L. T. Gucwa J. P. O'Reilly J. A. Bailey C. W. Hayes R. H. Pinson G. Bockhold, Jr. R. W. McManus E. D. Groover G. R. Frederick Sr. Resident (NRC)

C. T. Moore J. E. Swartzwelder D. H. Smith (OPC)

J. E. Joiner (TSLA) NORMS G. A. McCarley l

l-l i

1 l

l i

(

l l

j l

l l

l