Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2
ML20202G544
Person / Time
Site: Vogtle  
Issue date: 01/31/1998
From: Hargis T, Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1169, NUDOCS 9802200164
Download: ML20202G544 (7)


Text

.-.

C. K. McCoy South:rn N:cleer V(e President Operating CompaIy. Inc.

Vogtle Project 40 inverness Cer.ter Parkway

  • ~,,

P0. Box 1235 Birmingham. A!ahama 35201 Tel 206 932.7122 Fax 205 9320403 k

SOUTHERN h COMPANY Energy to Serve hurWorld" February 9,1998 LCV-Il69 Docket Nos. 50-424,425 U. S. Nuclear Regulatory Commission ATfN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - JANUARY 1998 Southern Nuclear Operating Company hereby submits the January 1998 monthly operating reports for Vogtle Electric Generating Plant, Units 1 and 2, in accordance with the requirements of Technical Specifications 5.6.4.

Please contact this office if you have any questions.

Sincerciv, C. K. McCoy CKM/afs

Enclosures:

El-VEGP Unit 1 Monthly Operating Report - January 1998 E2-VEGP Unit 2 Monthly Operating Report - January 1998 cc: Southern Nuclear Ooeratinn Comoany Mr. J. B. Beasley, fr.

Mr. M. Sheibani NORMS U. S. Nuclear Renulatory Commiston Mr. L. A. Rcycs, Regional Administrator

}lf Mr. D. H. Jaffe, Senior Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle l[

f llllll llllllll l'llll 9902200164 980131 PDR ADOCK 05000424 R

PDR

-. - ~... _. ~... - -. -...

4 ENCLOSUREI TABLE OF CONTENTS VOGR.E ELECTRIC GENERATING PLANT UNIT I hjONTHLY OPERATING REPORT FOR JANUARY 1998 OPERATING DATA REPORT and CHALLENGES TO PORV and SAFETY VALVES Page El 1 UNIT SHUTDOWNS mnd NARRATIVE REPORT Page El-2

OPERATING DATA REPORT Docket No :

50-424 Unit Name:

yeGP UNIT 1 Date:

Februay 2,1998 Completed By:

T.S. Harg:s Telephone:

(706) 826 3469 Operating Status

1. Reporting Period; Jan-98
2. Design Electncal Rating (Net MWe):

1169

3. Maximum Dependable Capacity (Net MWe):

1162' IhitMonth YeatlaDate Cumulative

4. Number Of Hours Reactor Was Critical.

744.0 744.0 31,716.0

5. Hours Generator On Line; 744.0 744.0

.v,418 8_

6. Unit Reserve Shutdown Hours:

0.0 0.0 01

7. Net Electrical Energy Generated (MWHe):

881,735 881,735 88,344.047 CHAlt.ENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES D_a_te iTag No.

Event Desenption NA NA NA E1-1

1 UNIT SHUTDOWNS l

Docket No.:

50-424 l

Unit Name:

VEGP UNIT 1 Date:

February 2,1998 Completed By:

T.S. Hargis Telephone:

(706) 826-3469 Reporting Period:

Jan-98 Type Met *iod of lF: Forced Duration Shutting Cause/ Corrective Actions s

No.

Date Scheduled (Hours)

, Reason (1)

Down (2)

Comments NA NA NA NA NA NA NA (1) REASON:

(2) METHOD:

A Equipment Failure (Explai E Operstor Tranng/ License Examination 1 Manual

4. Continuation B - Maintenance or Test F Administrative
2. Manual Trip / Scram
5. Other C - Refuehng G Operational Error (Explain)
3. Automatic Tnp/ Scram O Regulatory Restriction H Other(Explain)

CAUSE/ CORRECTIVE ACTIONICOMMENTS:

NARRATIVE REPORT January 0100.00 Unit at 100% power with no operating problems.

January 3123:59 Unit at 100% power with no operating problems.

E1-2

t ENCLOSURE 2 TABLE OF CON 11NTS VOG'II.E ELECTRIC GENERATING PLANT UNIT 2 MONTHLY OPERATING REPORT FOR JANUARY 1998.

OPERATING DATA REPORT and CHALLENGES TO PORV and SAFETY VALVES Pag: E21 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2 2 i

  • OPERATING DATA REPORT Docket No.:

50-425 Unit Name:

VEGP UNIT 2 Date:

February 2,1998 Completed By:

T.S}argis..

Telephone:

E001C26 3469 Operating Status

1. Reporting Period:

Jan-98_.

2. Design Electncal Rating (Net M.Ve):

1169

3. Maximum Dependable Capacity (Net MWe):

1167 This_ Month YeaLTo Date Cumulative

4. Number Of Hours Reactor Was Critical:

744 0 744.0 69,567.8

5. Hours Generator On Line:

744.0 f,, Unit Reserve Shutdown Hours:

00~

744.0 68,903.2 0.0 OT

7. Net Electncal Energy Generated (MWHe):

882,192 882,192 76,468,918 CHALLENGES TO PRESSUR'.JER PORV AND PRESEURIZER SAFETY VALVES Date Tag No.

. Event Desenption NA NA NA E2-1

..-ii-.--......,-i..

e

, UNIT SHUTDOWNS Docket No.:

50-425 yEG VRiti2 9

~

l Unit Name:

February 3,19 8 Date:

Completed By:

T}.Hargis_

Telephone:

(706) 826-3469 Reporting Period:

Jan-G8 Type Method of r Forced Duration Shutting Cause/ Corrective Actions No.

!Date 8 8""*8 (Hours) iReanor (1)

Down (2)

Comments NA NA NA NA NA NA NA I

(1) REASON:

(2) METHOD:

A. E quipment Failure (E mplain) E. Operator Tranng/Ucense Esamination t Manual 4 Continuaten B. Maintenanca or Test F. Administrative

2. Manual inp/S /am 6 Other C. Refueling
0. Operational Error (Explain) 3 Automateinp/ Scram
0. Regulatory Restrction H. Othat (Explain)

CAUSE/ CORRECTIVE ACTIONICOMMENTS:

/

i NARRATIVE REPORT January 0100.00 Unit at 100% power with no operating problems, January 3123.59 Unit at 100% power with no operating problems.

e E2-2

,