Text
.-.
C. K. McCoy South:rn N:cleer V(e President Operating CompaIy. Inc.
Vogtle Project 40 inverness Cer.ter Parkway
- ~,,
P0. Box 1235 Birmingham. A!ahama 35201 Tel 206 932.7122 Fax 205 9320403 k
SOUTHERN h COMPANY Energy to Serve hurWorld" February 9,1998 LCV-Il69 Docket Nos. 50-424,425 U. S. Nuclear Regulatory Commission ATfN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - JANUARY 1998 Southern Nuclear Operating Company hereby submits the January 1998 monthly operating reports for Vogtle Electric Generating Plant, Units 1 and 2, in accordance with the requirements of Technical Specifications 5.6.4.
Please contact this office if you have any questions.
Sincerciv, C. K. McCoy CKM/afs
Enclosures:
El-VEGP Unit 1 Monthly Operating Report - January 1998 E2-VEGP Unit 2 Monthly Operating Report - January 1998 cc: Southern Nuclear Ooeratinn Comoany Mr. J. B. Beasley, fr.
Mr. M. Sheibani NORMS U. S. Nuclear Renulatory Commiston Mr. L. A. Rcycs, Regional Administrator
}lf Mr. D. H. Jaffe, Senior Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle l[
f llllll llllllll l'llll 9902200164 980131 PDR ADOCK 05000424 R
-. - ~... _. ~... - -. -...
4 ENCLOSUREI TABLE OF CONTENTS VOGR.E ELECTRIC GENERATING PLANT UNIT I hjONTHLY OPERATING REPORT FOR JANUARY 1998 OPERATING DATA REPORT and CHALLENGES TO PORV and SAFETY VALVES Page El 1 UNIT SHUTDOWNS mnd NARRATIVE REPORT Page El-2
OPERATING DATA REPORT Docket No :
50-424 Unit Name:
yeGP UNIT 1 Date:
Februay 2,1998 Completed By:
T.S. Harg:s Telephone:
(706) 826 3469 Operating Status
- 1. Reporting Period; Jan-98
- 2. Design Electncal Rating (Net MWe):
1169
- 3. Maximum Dependable Capacity (Net MWe):
1162' IhitMonth YeatlaDate Cumulative
- 4. Number Of Hours Reactor Was Critical.
744.0 744.0 31,716.0
- 5. Hours Generator On Line; 744.0 744.0
.v,418 8_
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 01
- 7. Net Electrical Energy Generated (MWHe):
881,735 881,735 88,344.047 CHAlt.ENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES D_a_te iTag No.
Event Desenption NA NA NA E1-1
1 UNIT SHUTDOWNS l
Docket No.:
50-424 l
Unit Name:
VEGP UNIT 1 Date:
February 2,1998 Completed By:
T.S. Hargis Telephone:
(706) 826-3469 Reporting Period:
Jan-98 Type Met *iod of lF: Forced Duration Shutting Cause/ Corrective Actions s
No.
Date Scheduled (Hours)
, Reason (1)
Down (2)
Comments NA NA NA NA NA NA NA (1) REASON:
(2) METHOD:
A Equipment Failure (Explai E Operstor Tranng/ License Examination 1 Manual
- 4. Continuation B - Maintenance or Test F Administrative
- 2. Manual Trip / Scram
- 5. Other C - Refuehng G Operational Error (Explain)
- 3. Automatic Tnp/ Scram O Regulatory Restriction H Other(Explain)
CAUSE/ CORRECTIVE ACTIONICOMMENTS:
NARRATIVE REPORT January 0100.00 Unit at 100% power with no operating problems.
January 3123:59 Unit at 100% power with no operating problems.
E1-2
t ENCLOSURE 2 TABLE OF CON 11NTS VOG'II.E ELECTRIC GENERATING PLANT UNIT 2 MONTHLY OPERATING REPORT FOR JANUARY 1998.
OPERATING DATA REPORT and CHALLENGES TO PORV and SAFETY VALVES Pag: E21 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2 2 i
- OPERATING DATA REPORT Docket No.:
50-425 Unit Name:
VEGP UNIT 2 Date:
February 2,1998 Completed By:
T.S}argis..
Telephone:
E001C26 3469 Operating Status
- 1. Reporting Period:
Jan-98_.
- 2. Design Electncal Rating (Net M.Ve):
1169
- 3. Maximum Dependable Capacity (Net MWe):
1167 This_ Month YeaLTo Date Cumulative
- 4. Number Of Hours Reactor Was Critical:
744 0 744.0 69,567.8
- 5. Hours Generator On Line:
744.0 f,, Unit Reserve Shutdown Hours:
00~
744.0 68,903.2 0.0 OT
- 7. Net Electncal Energy Generated (MWHe):
882,192 882,192 76,468,918 CHALLENGES TO PRESSUR'.JER PORV AND PRESEURIZER SAFETY VALVES Date Tag No.
. Event Desenption NA NA NA E2-1
..-ii-.--......,-i..
e
, UNIT SHUTDOWNS Docket No.:
50-425 yEG VRiti2 9
~
l Unit Name:
February 3,19 8 Date:
Completed By:
T}.Hargis_
Telephone:
(706) 826-3469 Reporting Period:
Jan-G8 Type Method of r Forced Duration Shutting Cause/ Corrective Actions No.
!Date 8 8""*8 (Hours) iReanor (1)
Down (2)
Comments NA NA NA NA NA NA NA I
(1) REASON:
(2) METHOD:
A. E quipment Failure (E mplain) E. Operator Tranng/Ucense Esamination t Manual 4 Continuaten B. Maintenanca or Test F. Administrative
- 2. Manual inp/S /am 6 Other C. Refueling
- 0. Operational Error (Explain) 3 Automateinp/ Scram
- 0. Regulatory Restrction H. Othat (Explain)
CAUSE/ CORRECTIVE ACTIONICOMMENTS:
/
i NARRATIVE REPORT January 0100.00 Unit at 100% power with no operating problems, January 3123.59 Unit at 100% power with no operating problems.
e E2-2
,