Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with
ML20216E506
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/31/1999
From: Beasley J, Myers C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1306-H, NUDOCS 9909140203
Download: ML20216E506 (7)


Text

f:

l* s

  • J. Barnie B:asley, Jr.. P.E. Southirn Nucle:r

~

  • l , Vice President Operating Company. inc.

! Vogtle Project 40 inverness Centar Parkway P0 Box 1295

! Birmingham. Alabama 35201 Tel 205 992 7110 fax 205 992 0403 SOUTHERN COMPANY Energy to Serve l'our World" September 9, 1999 LCV-1306-H

. Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT- AUGUST 1999 Enclosed are the August 1999, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance l with the Technical Specification 5.6.4.

Sincerely, 4

J. B. Beas ey, Jr.

JBB/JLL Enclosures El- VEGP Unit 1 Monthly Operating Report - August 1999 E2- VEGP Unit 2 Monthly Operating Report - August 1999 cc: Southern Nuclear Operating Company }

Mr. M. Sheibani SNC Document Management g

\

-p D

U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. R. Assa, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle 14 '.1 U b 4

! 9909140203 990831  !

! PDR ADOCK 05000424  !

i. R PDR l 1

i

_ _]

r; 1 4

-a ,

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR AUGUST 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2

e .

OPERATING DATA REPORT Docket No.: 50-424 Unit Name: VEGP UNIT 1

, Date: September 1,1999 Completed By: C.S. Myers, Jr.

Telephone: (706)826-3122 999falln.g $.talyg

1. Reporting Period: August 1999
2. Design Electrical Rating (Net MWe): 1169
3. Maximum Dependable Capacity (Net MWe): 1151 1.hja M_qnth Year-To-Date Cumutaliyg
4. Number Of Hours Reactor Was Cntical: 744 0 5202.6 94.934.6
5. Hours Generator On Line: 744.0 5180.3 93.593.6
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWHe): 859.993 5.978.119 103.657.378 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No. Event Desenption N/A N/A N/A l

E1 1 I

l l

I a U, NIT SHUTDOWNS Docket No.: 50-424 Unit Name: VEGP UNIT 1

, Date: September 1,1999 Completed By: C.S. Myers, Jr.

Telephone: (706) 826-3122 Reporting Period: August 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No. Date S: Scheduled (Hours) Reason (1) Down (2) Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON: (2) LETHOD:

A - Equipment Failure (Explain) E - Operator Training / License Examination 1 Manual 4. Continuation B Maintenance or Test F- Administrative 2. Manual Trip / Scram 5. Other C Refueling G - Operational Error (Explain) 3. Automatic Trip / Scram D Regulatory Restriction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

EVENT.

9615L CORRICTIVE ACTION:

CRITICAL PATH WAS:

MRRATIVE REPORT Egcst 01 00:00 At 100% power with no significant operating problems.

August 31 23:59 At 100% power with no significant operating problems.

E1-2

(,

,. I l

i e i

ENCLOSURE 2

.VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR AUGUST 1999 i 1

TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 i

l

t QPERATING DATA REPORT Docket No.: 50-425 Unit Name: VEGP UNIT 2

, Date: September 1,1999 Completed By: C.S. Myers, Jr.

Telephone: (706)826-3122 QRg!Etlag $htyg

1. Reporting Period: August 1999
2. Design Electrical Rating (Net MWe): 1169
3. Maximum Dependable Capacity (Net MWe): 1154 This Month har-To-Date Cyrnula_tiv.R
4. Number Of Hours Reactor Was Critical: 744.0 5806.2 82.044.9
5. Hours Generator On Line: 744.0 5778.e 81.288.0
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWHe): 859.398 6.733.377 90.708.715 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No. Event Desenption N/A N/A N/A E2-1

{

f i 1

j o

UNIT SHUTDOWNS Docket No.: 50-425 Unit Name: VEGP UNIT 2 i

, , Date: September 1.1999 l Completed By: C.S. Myers. Jr.

Telephone: (706)826-3122 Reporting Period: August 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No. Date S: Scheduled (Hours) Reason (1) Down (2) Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON: (2) METHOD:

A - Equipment Failure (Explain) E - Operator Training / License Examination 1. Manual 4. Continuation B - Maintenance or Test F- Administrative 2. Manual Trip / Scram 5. Other C - Refueling G - Operational Error (Explain) 3. AutomaticTrip/ Scram j D - Regulatory Restriction H Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

EVENT:

CAUSE.

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT August 01 00:00 At 100% power with no significant operating problems.

August 31 23:59 At 100% power with no significant operating probbms.

E2-2 l

'l 1