ML20199E756
| ML20199E756 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/31/1998 |
| From: | Beasley J, Hargis T SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LCV-1169-L, NUDOCS 9901210076 | |
| Download: ML20199E756 (7) | |
Text
.
l.
\\
~
J. Bernie Beasley Jr., P.E Somhern Nuclear Vice Paesident Operating Company. Inc.
Vogtle Project 40 inverness Center Parkway -
RO. Box 1295 i
Birmingham. Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 SOUTHERN 1
COMPANY l
Energy to Serve YourWorld" January 13, 1999 LCV-1169-L Docket Nos.
50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
i VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT-DECEMBER 1998 Enclosed are the December 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely,
. B.
easley JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - December 1998 E2-VEGP Unit 2 Monthly Operating Report - December 1998
)
cc:
Southern Nuclear Operating Company j
Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management i
U. S. Nuclear Regulatory Commission
,i j
Mr. L. A. Reyes, Regional Administrator L /
c I
i Mr. D. Jaffe, Senior Project Manager, NRR y
i Mr. J. Zeiler, Senior Resident Inspector, Vogtle
/
., " O
^
c 9901210076 981231 PDR ADOCK 05000424'."
R pgp
t s
i l
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTiiLY OPERATING REPORT FOR DECEMBER 1998 l
t TABLE OF CONTENTS l
l OPERATING DATA REPORT and CHALLENGES to POF.V and SAFETY VALVES.
Page El-1 UNIT S11UTDOWNS and NARRATIVE REPORT Page El-2 i
1 I
s e
a r
7
OPERATING DATA REPORT Dockit No.:
50-424_ _ _.
Unit Name:
VEGP UNIT 1 Date:
January 4,1999 Completed By:
T.S. Hargis__ _
(
Telephone:
_70_6) 826-3469 Operating Status
- 1. Reporting Period:
December-1998
- 2. Design Electrical Rating (Net MWe):
if69-
- 3. Maximum Dependable Capacity (Net MWe):
_, _ 1162 This Month Year _To Date Cumulative l
- 4. Number Of Hours Reactor Was Critical:
744.0 8760.0 89,732.0,
- 5. Hours Generator On Line:
744.0 8738.5 88,413.3
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
879,415 10,216,947 97,679,259 I
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY
- S Date Tag No.
' Event Description N/A N/A N/A l
l E1-1 1'
m.
- UNIT SHUTDOWNS Docket No.:
50-424_ _ _
i Unit Name:
VEGP UNIT 1 Date:
January _4_,19_99 Compieted By:
T.S. Hargis Telephone:
,[7_06[826-3469 Reporting Pt od:
_ December - 1998 d
l Type Method of l
i F: Forced Duration Shutting iCause/ Corrective Actions I
l Comments No.
gate
- s. seeduw (Hours)
Reason (1) ;Down (2)
N/A N/A N/A N/A N/A N/A N/A l
(1) REASON:
(2) METHOD:
A-Equipment Failure (Explain) E Operator Training /Ucense Examination
- 1. Manual
- 4. Continuation B MamtenanceorTest F - Administrative
- 2. Manual Tnp/ Scram
- 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automaticinp/ Scram D - Regulatory Restriction H - Other (Expbin)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
CAUSE:
CORRECTIVE ACTION.;
1
)
i l
NARRATIVE REPORT December 01,1998 00:00 Unit 1 at 100% power with no operating problems.
December 29,199811:35 Ur!; 1 cereted to 86% power in response to secondary transient induced by isol. of extr. steam December 30,1998 01:00 Unit i retume.iio 100% power following the derate.
Dece7ber 31,1998 23:59 Ur.it i e' 600% power wi'.h rio operating problems.
E1-2
9 ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 t
MONT11LY OPERATING REPORT FOR DECEMBER 1998 TABLE OF CONTENTS OPERATING DATA REPORT and CliALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SliUTDOWNS and NARRATIVE REPORT Page E2-2
-t
i OPERATING DATA REPORT Dock;t No.:
50-425 _.__
Unit Name:
VEGP UNIT 2 Date:
January 4,1999 Completed By:
T.S. Hargis Telephone:
[(706)826 3469
~
~
Operating Status
- 1. Reporting Period:
December-1998
- 2. Design Electrical Rating (Net MWe):
1169_
- 3. Maximum Dependable Capacity (Net MWe):
1167 This Month Yearlo Date Cumulative i
- 4. Number Of Hours Reactor Was Critical:
744.0 7414.9 76,238.7 j
- 5. Hours Generator On Line:
744.0 7350.0 75,509 5
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
885,172 8,388,612 83,975,338 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
- Event Description N/A N/A N/A i
E2-1
- - ~. _.
I l
-UNIT SHUTDOWNS
~
,4 Dock:t No.:
50-425 Unit Nime:
VEGP ORIT 2
~
i Date:
January 4,199'9 l
Completed By:
T.S. Hargi,s_
Telephone:
_(706) 826-3469 Reporting Period:
December - 1998 l
{ Type jMethod of lCause/ Corrective Actions jF: Forced Duration Shutting
's: seedul No.
Date (Hours)
Reason (1)
Down (2) l Comments t
N/A N/A N/A N/A N/A N/A N/A l
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E Operator Training / License Examination
- 1. Manual
- 4. Continuabon B - Maintenance or Test F - Administrative
- 2. Manual Tnp/ Scram
- 5. Other C - Refuehng G - Operational Error (Explain)
- 3. AutomaticTrip/ Scram D - Regulatory Restnction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
i l
CAUSE; 1
CORRECTNEACTJON:
)
CRITICALPATH WAS-1 J
L l
I l
1-NARRATIVE REPORT December 01,1998 00:00 Unit 2 at 100% power with no operating problems.
December 31,1998 23:59 Unit 2 at 100% power with no operating problems.
E2-2 I
1 l'