1 ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT-UNIT 1 MONTiiLY OPERATING REPORT FOR SEPTEMBER 1998 TABLE OF CONTENTS OPERATING DATA REPORT and CIIALLENGES to PORV and SAFETY VALVES Page El-1 l
UNIT SilUTDOWNS and NARRATIVE REPORT Page El-2 l
l.
i 9810190356 981014'#
PDR ADOCK 05000424 R
PDR lf.
i
i OPERATIN2 DATA REPORT DockIt No.:
50-424_ _ _
Unit Name:
VEGP UNIT 1 Date:
~DiotieT2 5598
~
Completed By:
f.S[Hargis _
Telephone:
9 06)826-3469 Operating Status 1, Reporting Period:
September - 1998
- 2. Design Electrical Rating (Net MWe):
- 1169,
- 3. Maximum Dependable Capacity (Net MWe):
1162 This Month Year _To Date Cumuletive
- 4. Number Of Hours Reactor Was Critical:
720.0 6551.0 87,523.0
- 5. Hours Generator On Line:
720.0 6529.5 86,204.3
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
837,828_
7,609,683 95,071,995 j
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description i
N/A N/A N/A l
l I
l i
E1-1
~
- UNIT SHUTDOWNS Docket No.:
50-424 Unit Name:
~VEGP URlT 1 Date:
October 2,1998 Completed By:
T.S. Hargis Telephone:
J706) 826-3469 Reporting Period:
September - 1998 Type
' Method of F: Forced Duration Shutting Cause/ Corrective Actions No.
Date S: Wu%(Hours)
Reason (1)_Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain) E - Operator Training / License Examinatum
- 1. Manual
- 4. Continuation B - Maintenance or Test F Administrative
- 2. Manual Trip / Scram
- 5. Other C Refuehng G - Operational Error (Explain)
- 3. Automatic Tnp/ Scram
' D - Regulatory Restnction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
CAUSE:
CORRECTIVE ACTION; l
NARRATIVE REPORT September 01,1998 00:00 Unit 1 at 100% power with no operating problems.
September 30,1998 23:59 Unit 1 at 100% power with no operating problems.
i l
E1-2
4 L
I t
l-
' ENCLOSURE 2 l
VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTilLY OPERATING REPORT FOR SEPTEMBER 1998 TABLE OF CONTENTS OPERATING DATA' REPORT and CIIALLENGES to PORV and SAFETY VALVES Page E2-1
- UNIT SIIUTDOWNS and NARRATIVE REPORT Page E2-2 i
.+
1 t -
1 i
i
' OPERATING DATA REPORT Dock 1t No.:
50-425 Unit Name:
VEGP UNIT 2_
Date:
October 2,1998 Completed By:
T.S. Hargis Telephone:
(706)826-3469 Operating Status 1, Reporting Period:
September - 1998
- 2. Design Electrical Rating (Net MWe):
1169_-
- 3. Maximum Dependable Capacity (Net MWe):
1167 ThisMonth YearloDate Cumulative
- 4. Number Of Hours Reactor Was Critical:
694.4 5205.9 74,029.7
- 5. Hours Generator On Line:
688.0 5141.0 73,300.2
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
' 7. Net Electrical Energy Generated (M He):
786,453 5,789,231 81,375,957 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
' Event Description N/A N/A N/A E2-1
~
UNIT SHUTDOWNS Docket No.:
50-425_ _ _
Unit N';me:
VEGP UNIT 2 l
Date:
October 2,1998 l
Completed By:
T.S]argis_.
~
Telephone:
_(706) 826-3469 Reporting Period:
September - 1998
!~
l Type Method of i
F: Forced Duration Shutting Cause/ Corrective Actions s m uw No.
Date (Hours)
Reason (1)
Down (2)
Comments 98-7 09/04/98 F
31.97 B
2
'3ee below (1) REASON:
(2) METHOD:
A Equipment Failure (Explain) E Operator Training /Ucense Examinabon
- 1. Manual
- 4. Continuauon B - Ma;ntenance or Test F - Administrative
- 2. Manual Trip / Scram
- s. Other l
C - Refueling G OperationalError(Explain;
- 3. Automats,Tnp/ Scram D. Regulatory Restriction H Other(Explain) j CAUSE/ CORRECTIVE ACTION / COMMENTS:
CAUSE; The operators initiated a manual reactor trip because of the loss of both Feedwater Pumps.
The Feedwater Pumps tripped during the performance of the slave relay surveillance testing.
CORRECTNEACTKtN; Performed testing / troubleshooting to verify cause.
CRITICALPATliWAS; Completing the testing of the circuit.
l NARRATIVE REPORT September 01,1998 00:00 Unit 2 at 100% power with no operating problems.
September 04,1998 00:25 Unit 2 Manually tripped due to trip of both Feedwater Pumps.
September 05,1998 00:51 Unit 2 entered mode 2 In route to reactor startup.
September 05,1998 02:03 Unit 2 reactor is critical.
September 05,1998 03:51 Unit 2 entered mode 1.
September 05,1998 08:23 Unit 2 Main Generator is tied to grid.
September 06,1998 07:52 Unit 2 retumed to 100% power.
September 30,1998 23:59 Unit 2 at 100% power with no operating problems.
l E2-2 l