Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2
ML20206C229
Person / Time
Site: Vogtle  
Issue date: 03/31/1999
From: Sheibani M
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20206C226 List:
References
NUDOCS 9904300199
Download: ML20206C229 (6)


Text

r.

c.

a

~ ~*

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR MARCH 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2

)

l l

9904300199 990421 PDR ADOCK 05000424 R

PDR

fi

+

i.

i ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2

. MONTHLY OPERATING REPORT FOR MARCH 1999 l

TABLE OF CONTENTS l

I OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 j

' UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 l

l i

1 f

1 l..

OPERATING DATA REPORT l

Docket No.:

50-424 Unit Name:

VEGP UNIT 1 l

Date:

Apnl 1,1999 Completed By:

M. Shelbani Telephone:

(706) 826-3209 l

l Qperatina Stelug

1. Reporting Period:

March - 1999 1 Design Electrical Rating (Net MWe):

1169 I

3. Maximum Dependable Capacity (Net MWe):

1151 I

Ibis Monitl Year To Date Cumulative i

4. Number Of Hours Reactor Was Critical:

140 0 1531.6 91263 6

5. Hours Generator On Line:

117.9 1609.3 89922.6

6. Unit Reserve Shutdown Hours:

0.0 0.0 0.0 l

7, Net Electrical Energy Generated (MWHe):

82603.0 1698369 0 99377628.0 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Desenption N/A N/A N/A f

1 E11 j

l j

UNIT SHUTDOWNS Docket No :

50-424 Unit Name:

VEGP UNIT 1 Date:

Aoni 1,1999

)

Completed By:

M. Snelbani Telephone:

(706) 826-3209 Reporting Period:

March - 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments 99-1 2/27/99 S

622.2 C

4 See Below 99-2 3/27/99 S

2.8 8

2 See Below 99-3 3/23/99 S

1.1 B

2 See Below (1) REASON:

(2) METHOD.

A Equipment Failure (Explain) E - Operator Training / License Examination 1, Manual

4. Continuation B - Maintenance or Test F Admi,$trative
2. Manual Trip / Scram
5. Other C Refueling G OperationalError(Explain)
3. AutomaticTrip/ Scram D Regulatory Restriction H Other(Explain) j CAUSE/ CORRECTIVE ACTION / COMMENTS:

EVENT 99-1 CA_MSE; Scheduled Refueling Outage (continued from Feb )

CORRECTIVE ACTIOR Routine Outage Maintenance CRITICAL PATH WAS:

Cooldowa, le "10 Deg. F, Vessel Disassembly, Fuel off load, Mid-loop Maintenance, Re-load fuel in core, Reasse nble veissel, Fill and vent reactor vessel and, complete prerequisites for mode changes.

EVENT 99-2 CAQSE; Turbine Oierspeed Test CQBBECINEAQEQR Routine Turbine overspeed trip test.

CRITICAL PATH WAS:

Complete overspeed trip test and re-tie generator to grid.

EVENT 99-3 CAUSE:

Reperformance of Turbine Overspeed Test CORRECTIVE ACTIOtt Reperformance of Turbine Overspeed Test to verify Generator Output Breaker trip delay.

CRITICAL PATH WAS; Complete overspeed trip test and re-tie generator to grid.

NARRATIVE REPORT Varch 01,1999 00.00 Unit 1 in mode 4 for scheduled refueling outage.

March 01,1999 00:27 Unit i entered mode 5.

March 03,199916:36 Unit i entered mode 6.

March 05,199911:13 Unit 1 commenced fuel off-load.

March 07,199916 25 Unit 1 core off-load complete; entered defueled window.

i March 11,199915:58 Unit 1 entered mode 6.

March 17,1999 23:22 Unit i entered mode 5.

March 23,1999 31:14 Unit i entered mode 4.

March 24,1999 03:33 Unit i entered mode 3.

March 26,1999 01:25 Unit i entered mode 2.

March 26,1999 04:02 Unit i reactor entical.

March 26,199917:00 Unit i entered mode 1.

March 26,1999 22:14 Unit 1 generator tied to grid.

March 27,199910:20 Unit 1 turbine tripped for overspeed test.

March 27,199913:08 Unit 1 generator tied to grid.

March 28,1999 02:31 Unit 1 turbine tripped for overspeed test.

March 28,1999 03:37 Unit i generator tied to grid.

March 30,1999 22:00 Unit i retumed to 100% power.

March 31,1999 23.59 Unit 1 at 100% power with no operating problems.

l E1-2 I

7-4 OPERATING DATA REPORT Docket No.:

50425 Unit Name:

VEGP UNIT 2

~

Date:

April 1,1999 Completed Bv:

M. Stwibani Telephone:

(706)826-3209 Defratine Status

1. Reporting Period:

March - 1999

2. Design Electrical Rating (Net MWe):

1169

3. Maximum Dependable Capacity (Net MWe):

1154 This Month Year To Date Cumulative

4. Number Of Hours Reactor Was Oritical:

710.2 2135.2 78373.9

5. Hours Generator On Line:

711.9 2115.3 77624.6

6. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

7. Net Electrical Energy Generated (MWHe):

828526 0 2483304.0 86458642.0 l

I z

CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Desenption N/A N/A N/A

)

i E2-1

_I

O

..p l

I UNIT SHUTDOWNS Docket No.:

50-425 Unit Name:

VEGP UNIT 2 Date:

Apnl 1,1999 l

Completed By:

M. Sheibani Telephone:

(706) 826-3209 Reporting Period:

March - 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No.

Date P Scheduled (Hours)

Reason (1)

Down (2)

Comments 99-2 3/2/99 F

32.1 G

2 See Below (1) REASON:

(2) METHOD:

A EquipmentFailure(Explain) E - Operator Training / License Examination

1. Manual
4. Continuation i

k B-Maintenance or Test F - Administrative

2. Manual Trip / Scram
5. Other J

C - Refueling G - Operational Error (Explain)

3. AutomaticTrip/ Scram

{

D - Reguq1 tory Restriction H - Other (Explain) l CAUSE/ CORRECTIVE ACTION / COMMENTS:

EVENT 99-2 CAUSE.

The b5it 2 reactor was manually tripped due to low Steam Generator water level caused by Feedwater isolation. The loss of the feedwater was due to personnel error hanging equipment clearance.

CORRECTIVE ACTION:

Replace fuse removed in error i

I CRITICAL PATH WAS:

Complete prerequisites required for retuming reactor to power operations NARRATIVE REPORT March 01,1999 00.00 Unit 2 at 100% power with no operating problems.

j March 02,1999 02:06 Unit 2 manually tripped due to loss of feedwater flow.

i March 02,199916:55 Unit 2 entered mode 2.

March 02,199918:07 Unit 2 te+ntered mode 3 due to descrepancy with rod control demand position indication.

March 03,1999 01:53 Unit 2 entered mode 2.

March 03,1999 02:52 Unit 2 Reactor critical.

March 03,1999 05:38 Unit 2 entered mode 1.

March 03,199910:11 Unit 2 Generator tied to Grid.

March 04,1999 07:00 Unit 2 Retumed to 100% power.

Mart h 31,1999 23:59 U:,it 2 at 100% power with {1 operating problemn.

E2-2