Text
g
[:.
J. Bamie Bs:sity, Jr., P.E.-
Stuthern Nuctsar Vice President Opsrating Comp:ny, Inc.
. Vogtle Project,
,40 invemess Center Parkwa/
PO Box 1295 Birmingham, Alabama 35201 Tel 205 9927110.
Fax 205 9920403 SOUTHERN COMPANY l.
Energy to Serve krWorld"
' July'9, 1999 LCV-1306-G Dockht Nos. 50-424 I
50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - JUL.Y 1999 Enclosed are the July 1999, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely, I
f nl y, l
}
JBB/JLL Enclosures El-'VEGP Unit 1 Monthly Operating Report - July 1999 E2-VEGP Unit 2 Monthly Operating Report - July 1999 L
cc: Southern Nuclear Operating Company _
Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management 1
)
U. S. Nuclear Regulatory Commission
/
f l
Mr. L. A. Reyes,- Regional Administrator Mr. R. R. Assa, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle 9900130120 990731 7
L
~
ENCLOSUREI VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR JULY 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2 l
L
[L I
OPERATING DATA REPORT Docket No.:
f0-424 Unit Name:
VEGP UNIT 1 Date:
August 1,1999 Completed By:
C.S. Myers, Jr.
Telephone:
(706)826-3122 9peratina Status
(
- 1. Reporting Period:
July 1999
- 2. Design Electrical Rating (Net MWe):
1169
- 3. Maximum Dependable Capacity (Net MWe):
1151 This Month Yiar-To-Date Cumulative
- 4. Number Of Hours Reactor Was Critical:
744.0 4458.6 94,190.6
- 5. Hours Generator On Line:
744.0 4436.3 92,849.6
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
{
7, Net Electrical Energy Generated (MWHe):
860,773 5,118,126 102,797,385 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Desenption N/A N/A N/A i
1
)
E1-1
UNIT SHUTDOWNS Docket No.:
50-424 Unit Name:
VEGP UNIT 1 Date:
August 1.1999 Completed By:
C.S. Myers. Jr.
Telephone:
(706)826-3122 Reporting Period:
July 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain) E - Operator Training / License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative
- 2. Manual Trip / Scram
- 5. Other 1
C - Refueling G - Operational Error (Explain)
- 3. AutomaticTrip/ Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
EMEL CAUSE.
CORRECTIVE ACTION:
CRITICAL PATH WAS:
l NARRATIVE REPORT July 01 00:00 At 100% power with no significant operating problems.
July 31 23:59 At 100% power with no significant operating problems.
l l
l l
E1-2 l
r=
i ENCLOSURE 2 VOOTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR JULY 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CIIALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 I
I 1
i Li
e OPERATING DATA REPORT Docket No.:
50-425 Unit Name:
VEGP UNIT 2 Date:
August 1.1999 Completed By:
C.S. Myers. Jr.
Telephone:
(706)826-3122 DML81i.DR31!LtVA
- 1. Reporting Period:
July 1999
- 2. Design Electrical Rating (Net MWe):
1169
- 3. Maximum Dependable Capacity (Net MWe):
1154 lhis Month yfar-To-Date Cumulative h
- 4. Number Of Hours Reactor Was Critical:
744.0 5062 2 81.300.9
- 5. Hours Generator On Line:
744.0 5034 8 80.544.0
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
860.554 5.873.979 89.849 E CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Desenption N/A N/A N/A E2-1 I
)
a e
UNIT SHUTDOWNS Docket No.:
50-425 Unit Name:
VEGP UNIT 2 Date:
August 1,1999 Completed By:
C.S. Myers, Jr.
Telephone:
(706) 826-3122 I
Reporting Period:
July 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain) E - Operator Training / License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F-Administrative
- 2. Manual Trip / Scram
- 5. Other C Refueling G - Operational Error (Explain)
- 3. AutomaticTrip/ Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
EVENT.
CAUSF; CORRECTIVE ACTION:
CRITICAL PATH WAS:
NARRATIVE REPORT July 01 00:00 At 100% power with no significant operating problems.
July 31 23.59 At 100% power with no significant operating problems.
E2-2