Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With
ML20210P984
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/31/1999
From: Beasley J, Meyers C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1306-G, NUDOCS 9908130120
Download: ML20210P984 (6)


Text

g

[: . .

'!" .- J. Bamie Bs:sity, Jr., P.E.- Stuthern Nuctsar Vice President Opsrating Comp:ny, Inc.

. Vogtle Project , ,40 invemess Center Parkwa/

PO Box 1295 Birmingham, Alabama 35201 Tel 205 9927110.

Fax 205 9920403 SOUTHERN COMPANY Energy to Serve krWorld" l.

' July'9, 1999 LCV-1306-G I Dockht Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - JUL.Y 1999 Enclosed are the July 1999, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely, I

f

. nl y, l }

JBB/JLL Enclosures El-'VEGP Unit 1 Monthly Operating Report - July 1999 E2- VEGP Unit 2 Monthly Operating Report - July 1999 L

cc: Southern Nuclear Operating Company _ .

Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management l

U. S. Nuclear Regulatory Commission Mr. L. A. Reyes,- Regional Administrator

'-QQ

/

1 f )

Mr. R. R. Assa, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle 9900130120 990731 7 PDR ADOCK 05000424-  !

R PDR .

L

~

ENCLOSUREI VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR JULY 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2 1

l L

[L I .

OPERATING DATA REPORT Docket No.: f0-424 Unit Name: VEGP UNIT 1

, , Date: August 1,1999 Completed By: C.S. Myers, Jr.

Telephone: (706)826-3122 9peratina Status

( 1. Reporting Period: July 1999

2. Design Electrical Rating (Net MWe): 1169
3. Maximum Dependable Capacity (Net MWe): 1151 This Month Yiar-To-Date Cumulative
4. Number Of Hours Reactor Was Critical: 744.0 4458.6 94,190.6
5. Hours Generator On Line: 744.0 4436.3 92,849.6
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0 {

7, Net Electrical Energy Generated (MWHe): 860,773 5,118,126 102,797,385 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No. Event Desenption N/A N/A N/A i

1

)

E1-1

UNIT SHUTDOWNS Docket No.: 50-424 Unit Name: VEGP UNIT 1

, , Date: August 1.1999 Completed By: C.S. Myers. Jr.

Telephone: (706)826-3122 Reporting Period: July 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No. Date S: Scheduled (Hours) Reason (1) Down (2) Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON: (2) METHOD:

A - Equipment Failure (Explain) E - Operator Training / License Examination 1. Manual 4. Continuation B - Maintenance or Test F - Administrative 2. Manual Trip / Scram 5. Other 1 C - Refueling G - Operational Error (Explain) 3. AutomaticTrip/ Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

EMEL CAUSE.

CORRECTIVE ACTION:

CRITICAL PATH WAS:

l l

NARRATIVE REPORT July 01 00:00 At 100% power with no significant operating problems.

July 31 23:59 At 100% power with no significant operating problems.

l l

l l

E1-2 l

r=

i ENCLOSURE 2 VOOTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR JULY 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CIIALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 I

I 1 i

Li

e OPERATING DATA REPORT Docket No.: 50-425 Unit Name: VEGP UNIT 2

, , Date: August 1.1999 Completed By: C.S. Myers. Jr.

Telephone: (706)826-3122 DML81i.DR31!LtVA

1. Reporting Period: July 1999
2. Design Electrical Rating (Net MWe): 1169
3. Maximum Dependable Capacity (Net MWe): 1154 h Month lhis yfar-To-Date Cumulative
4. Number Of Hours Reactor Was Critical: 744.0 5062 2 81.300.9
5. Hours Generator On Line: 744.0 5034 8 80.544.0
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWHe): 860.554 5.873.979 89.849 E CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No. Event Desenption N/A N/A N/A E2-1 I

)

a e

UNIT SHUTDOWNS Docket No.: 50-425 Unit Name: VEGP UNIT 2 Date: August 1,1999 Completed By: C.S. Myers, Jr.

Telephone: (706) 826-3122 .

I Reporting Period: July 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No. Date S: Scheduled (Hours) Reason (1) Down (2) Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON: (2) METHOD:

A - Equipment Failure (Explain) E - Operator Training / License Examination 1. Manual 4. Continuation B - Maintenance or Test F- Administrative 2. Manual Trip / Scram 5. Other C Refueling G - Operational Error (Explain) 3. AutomaticTrip/ Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

EVENT.

CAUSF; CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT July 01 00:00 At 100% power with no significant operating problems.

July 31 23.59 At 100% power with no significant operating problems.

E2-2