ML20195G173

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with
ML20195G173
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/31/1999
From: Beasley J, Myers C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1306-E, NUDOCS 9906150260
Download: ML20195G173 (6)


Text

-

f... ",,

J. Barnie Beasley, Jr., P.E Southern Nucleer I

-f Vice President Operating Company. inc.

l Vogtle Project 40 invemess Center Parkway R0. Box 1295 j.

Birmingham. Alaoama 35201 Tel 205992.7110 Fax 205.992.0403 June 9, 1999 COMPANY Energy to Serve krWorld*

LCV-1306-E Docket Nos. 50-424 50-425 l

f

. U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

~

l VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT-MAY 1999 Enclosed are the May 1999, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely, yDr JBB/JLL

/

/

Enclosures El-VEGP Unit 1 Monthly Operating Report - May 1999 l

7 E2-VEGP Unit 2 Monthly Operating Report - May 1999 j/

cc: Southern Nuclear Operating Company Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. R. Assa, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle 9906150260 990531 PDR ADOCK 05000424 R

PDR _

i ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR MAY 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2 J

OPERATING DATA REPORT Docket No.:

50-424 Unit Name:

VEGP UNIT 1 Date:

June 1,1999 Completed By:

C.S. Myers, Jr.

Telephone:

(706) 826-3122 OPf911!!g.jlatus

1. Reporting Period:

May 1999

2. Design Electrical Rating (Net MWe):

1169

3. Maximum Dependable Capacity (Net MWe):

1151 This Month lear To Date Cumulativg

4. Number Of Hours ReactorWas Critical:

744.0 2994 6 92.726.6

5. Hours Generator On Line:

744.0 2972.3 91.385.6

6. Unit Reserve Shut wn Hours:

00 00 0.0

7. Net Electrical Energy Generated (MWHe):

874.304 3.418.056 101.097.315 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Desenption N/A N/A N/A

. wssw.,

E1-1 i

)

  • ~

NIT SHUTDOWNS Docket No.:

50-424 Unit Name:

VEGP UNIT 1 Date:

June 1,1999 Completed By:

C.S. Myers, Jr.

Telephone:

(706) 826-3122 Reporting Period:

May 1999

~

Type Method of F; Forced Duration Shutting Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A

~

(1) REASON.

(2) METHOD:

A - Equipment Failure (Explain) E Operator Training / License Examination

1. Manual
4. Continuation B - Maintenance or Test F Administrative
2. Manual Trip / Scram
5. Other i

C Refueling G - Operational Error (Explain)

3. AutomaticTrip/ Scram D Regulatory Restriction H - Other (Explain) i CAUSE/CORREC1NE ACTION / COMMENTS:
EVENT, CAUSE.

1 CORRECTIVE ACTION:

CRITICAL PATH WAS; NARRATIVE REPORT May 01 00 00 At 100% power with no significant operating problems.

May 31 23:59 At 100% power with no significant operating problems.

E1-2

!1 i

ENCLOSURE 2 l

VOGTLE ELECTRIC GENERATING PLANT - UNIT 2

' MONTHLY OPERATING REPORT FOR MAY 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 L

(

(

l-OPERATING DATA REPORT Docket No.:

50-425 Unit Name:

VEGP UNIT 2 Date:

June 1.1999 Completed By:

C.S. Myers. Jr.

Telephone:

(706)826-3122 Qpuging Sta_t.g3

1. Reporting Period:

May 1999

2. Design Electncal Rating (Net MWe):

1169

3. Maximum Dependable Capacity (Net MWe) 1154 Ibis Month

. Year.I. 2 Qate pymulativ, r

4. Number Of Hours Reactor Was Critical:

744.0 3598.2 79.836.9

5. Hours Generator On Line:

744.0 3578.3 79,087.5

6. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

7. Net Electrical Energy Generated (MWHe):

873,698 4.201.370 88.176.708 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Desenption i

N/A N/A N/A i

E2-1 1

I w_

~.

e UNIT SHUTDOWNS Docket No.:

50-425 Unit Name:

VEGP UNIT 2 Date:

June 1,1999 Completed By:

C.S. Myers. Jr.

Telephone:

(706)826-3122 Reporting Period:

May 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain) E - Operator Training / License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip / Scram
5. Other C - Refueling G - Operational Error (Explain)
3. AutomaticTrip/ Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

EVENT:

CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

I NARRATIVE REPORT YU1 oc00 At 100% power with no significant operating problems.

o May 31 23:59 At 100% power with no significant operating problems.

I 4

  • e l

E2-2 l

l L