J. Barnie BesslIy. Jr.; P.E South rn Nuct:ar Vice President Optrating Comp:ny. Inc.
Vogtie Project 40 invemess Center Parkway -
PO Box 1295 Birmingham Alatana 35201 Tel 2059SD110 Fax 205 992.0403 SOUTHERN CCMPANY
]
Energy to Serve Your u"orld" October 15, 1999 LCV-1306-I Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC CENERATING PLANT MONTHLY OPERATING REPORT - SEPTEMBER 1999 Enclosed are the September 1999, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely, Oy s
' Jj B. Beasley, Jr. ;l JBB/JLL Enclosures
. El-VEGP Unit 1 Mon.hly Operating Report - September 1999 E2-VEGP Unit 2 Monthly Operating Report - September 1999 1
'cc:' Southern Nuclear Operating Comoany Mr. M. Sheibaai SNC Document Management U. S. N_uglear Regulatory Commission i
Mr. L. A. Reyes, Regional Administrator g-l Mr. R. R. Assa, Project Manager, NRR
/gr Mr. J. Zeiler, Senior Resident Inspector, Vogtle 9910260157 990930 PDR ADOCK 05000424 R
PDR j'
R s
l
- (
i ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLAN - UNIT 1 1
- MONTHLY OPERATING REPORT FOR SEPTEMBER 1999
. TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2 l
r.
I i
l l
l
, 1
[.
I i
OPERATING DATA h2 PORT
/
Docket No.;
50-424 Unit Name:
VEGP UNIT 1 Date:
October 1,1999 Completed Bc.
C.S. Myers, Jr.
Telephone:
(706)826-3122 i
' QooratingjMug
- 1. Reporting Period:
September 1999
- 2. Design Electrical Rating (Net MWe):
1169
- 3. Maximum Dependable Capacity (Net MWe):
1151 1
This Month Year To-Date Qumylative f
- 4. Number Of Hours Reactor Was Critical:
720.0 5922.6 95,654.6
- 5. Hours Generator On Line:
720.0 5900.3 94.313.6
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
841,201 6.819.320 104.498.579 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Desenption l
)
N/A N/A N/A I
i i
i ll 1
i E1-1 a
r; T
UNIT SHUTDOWNS Docket No.:
50-424 Und Name:
VEGP UNIT 1 Date:
October 1,1999 Completed By:
C.S. Myers, Jr.
Telephone:
(706) 826-3122 Reporting Period:
September 1999 Type Method of
(
F: Forced Duration Shutting Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
Reason (1)
Down (2)
Comments
~ N/A N/A
~ N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
)
A - Equipment Failure (Explain) E Operator Training / License Examination
- 1. Manual
- 4. Continuation
)
B - Maintenance or Test F - Administrative
- 2. Manual Trip / Scram
- 5. Other C Refueling G OperationalError(Explain)
- 3. Automatic Trip / Scram O Regulatory Restriction H - Other (Exp'ain)
CAUSE/ CORRECTIVE ACTION /CAMMENTS:
EV_ENI; CAUSE:
CORRECTIVE ACTION:
I falILQAL PATH WAS:
{
i NARRATIVE REPORT September 01 00:00 At 100% power with no significant operating problems.
September 30 23:59 At 100% power with no significant operating problems.
I E1-2
\\.
pc s
i ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR SEPTEMBER 1999 l
J l
TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 l
l l
L L.:..
'W a-o ::t
' OPERATING DATA REPORT Docket No.:
50425 Unit Name:
VEGP UNIT 2 Date:
_ October 1,1999 a
Completed By:
C.S. Myers. Jr.
Telephone;
{06)826-3122 QPRIMl!lGJMh!S
- 1. Reporting Period:
September 1999
- 2. Design Electrical Rating (Kat MWe):
1169
- 3. Maximum Dependable Capacity (Net MWe):
1154 This Month Year-To-Date Cumulative
- 4. Number Of Hours Reactor Was Critical:
720.0 6526.2 82,764.9
~
- 5. Hours Generator On Line:
720.0 6498.8 82.008.0 1
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
820.101 7.553.478 91.528.816 CHALLENGES TO PRESSURIZER PORY AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Descripton N/A N/A.
N/A E2-1
e..
UNIT SHUTDOWNS Docket No.:
50-425 Unit Name:
VEGP UNIT 2 Date:
October 1.1999 Completed By:
C.S. Myers. Jr.
Telephone:
(706)826-3122 Reporting Per'M:
September 1999 Type Method of I
F; Forced Duration Shutting Cause/Corretive Actions No.
Date S: Scheduled (Hours)
Reason '1)
Down (2)
Comments s
N/A N/A N/A N/A N/A N/A N/A i
(1) REASON:
(2) METHOD:
' A - Equipment Failure (Explain) E OperatorTraining/ License Exan.ation
- 1. Manual
- 4. Cvitinuation i
)
B - Maintonence or Test F Administrative
- 2. Manual Trip / Scram
- 5. Otter C - Refueling G - Operational Error (Explain) 3 NutomaticTrip/ Scram
/
D Regulatory hestriction H - Other (Explain) i CAUSE/ CORRECTIVE ACTION / COMMENTS:
)
4
- EVENT, CAUSL j
I l
CORRECTIVE ACTION-CRITICAL P'iTILVyA$1, l
NARRATIVE REPORT September 01 00:00 At 100% power with no significant operating problems.
September 20 07:30 Coastdown for planned refueling outage 2R7 began upon reaching <10 ppm RCS boron concentration.
l September 30 23.59 At 90% power with no significant operating problems.
i l
)
I l
EN l
l 1