Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With
ML20217K459
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/30/1999
From: Beasley J, Myers C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1306-1, NUDOCS 9910260157
Download: ML20217K459 (7)


Text

,

J. Barnie BesslIy. Jr.; P.E South rn Nuct:ar Vice President Optrating Comp:ny. Inc.

Vogtie Project 40 invemess Center Parkway -

PO Box 1295 Birmingham Alatana 35201 Tel 2059SD110 Fax 205 992.0403 SOUTHERN CCMPANY

]

Energy to Serve Your u"orld" October 15, 1999 LCV-1306-I Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC CENERATING PLANT MONTHLY OPERATING REPORT - SEPTEMBER 1999 Enclosed are the September 1999, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely, Oy s

' Jj B. Beasley, Jr. ;l JBB/JLL Enclosures

. El-VEGP Unit 1 Mon.hly Operating Report - September 1999 E2-VEGP Unit 2 Monthly Operating Report - September 1999 1

'cc:' Southern Nuclear Operating Comoany Mr. M. Sheibaai SNC Document Management U. S. N_uglear Regulatory Commission i

Mr. L. A. Reyes, Regional Administrator g-l Mr. R. R. Assa, Project Manager, NRR

/gr Mr. J. Zeiler, Senior Resident Inspector, Vogtle 9910260157 990930 PDR ADOCK 05000424 R

PDR j'

R s

l

(

i ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLAN - UNIT 1 1

- MONTHLY OPERATING REPORT FOR SEPTEMBER 1999

. TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2 l

r.

I i

l l

l

, 1

[.

I i

OPERATING DATA h2 PORT

/

Docket No.;

50-424 Unit Name:

VEGP UNIT 1 Date:

October 1,1999 Completed Bc.

C.S. Myers, Jr.

Telephone:

(706)826-3122 i

' QooratingjMug

1. Reporting Period:

September 1999

2. Design Electrical Rating (Net MWe):

1169

3. Maximum Dependable Capacity (Net MWe):

1151 1

This Month Year To-Date Qumylative f

4. Number Of Hours Reactor Was Critical:

720.0 5922.6 95,654.6

5. Hours Generator On Line:

720.0 5900.3 94.313.6

6. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

7. Net Electrical Energy Generated (MWHe):

841,201 6.819.320 104.498.579 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Desenption l

)

N/A N/A N/A I

i i

i ll 1

i E1-1 a

r; T

UNIT SHUTDOWNS Docket No.:

50-424 Und Name:

VEGP UNIT 1 Date:

October 1,1999 Completed By:

C.S. Myers, Jr.

Telephone:

(706) 826-3122 Reporting Period:

September 1999 Type Method of

(

F: Forced Duration Shutting Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments

~ N/A N/A

~ N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

)

A - Equipment Failure (Explain) E Operator Training / License Examination

1. Manual
4. Continuation

)

B - Maintenance or Test F - Administrative

2. Manual Trip / Scram
5. Other C Refueling G OperationalError(Explain)
3. Automatic Trip / Scram O Regulatory Restriction H - Other (Exp'ain)

CAUSE/ CORRECTIVE ACTION /CAMMENTS:

EV_ENI; CAUSE:

CORRECTIVE ACTION:

I falILQAL PATH WAS:

{

i NARRATIVE REPORT September 01 00:00 At 100% power with no significant operating problems.

September 30 23:59 At 100% power with no significant operating problems.

I E1-2

\\.

pc s

i ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR SEPTEMBER 1999 l

J l

TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 l

l l

L L.:..

'W a-o ::t

' OPERATING DATA REPORT Docket No.:

50425 Unit Name:

VEGP UNIT 2 Date:

_ October 1,1999 a

Completed By:

C.S. Myers. Jr.

Telephone;

{06)826-3122 QPRIMl!lGJMh!S

1. Reporting Period:

September 1999

2. Design Electrical Rating (Kat MWe):

1169

3. Maximum Dependable Capacity (Net MWe):

1154 This Month Year-To-Date Cumulative

4. Number Of Hours Reactor Was Critical:

720.0 6526.2 82,764.9

~

5. Hours Generator On Line:

720.0 6498.8 82.008.0 1

6. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

7. Net Electrical Energy Generated (MWHe):

820.101 7.553.478 91.528.816 CHALLENGES TO PRESSURIZER PORY AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Descripton N/A N/A.

N/A E2-1

e..

UNIT SHUTDOWNS Docket No.:

50-425 Unit Name:

VEGP UNIT 2 Date:

October 1.1999 Completed By:

C.S. Myers. Jr.

Telephone:

(706)826-3122 Reporting Per'M:

September 1999 Type Method of I

F; Forced Duration Shutting Cause/Corretive Actions No.

Date S: Scheduled (Hours)

Reason '1)

Down (2)

Comments s

N/A N/A N/A N/A N/A N/A N/A i

(1) REASON:

(2) METHOD:

' A - Equipment Failure (Explain) E OperatorTraining/ License Exan.ation

1. Manual
4. Cvitinuation i

)

B - Maintonence or Test F Administrative

2. Manual Trip / Scram
5. Otter C - Refueling G - Operational Error (Explain) 3 NutomaticTrip/ Scram

/

D Regulatory hestriction H - Other (Explain) i CAUSE/ CORRECTIVE ACTION / COMMENTS:

)

4

EVENT, CAUSL j

I l

CORRECTIVE ACTION-CRITICAL P'iTILVyA$1, l

NARRATIVE REPORT September 01 00:00 At 100% power with no significant operating problems.

September 20 07:30 Coastdown for planned refueling outage 2R7 began upon reaching <10 ppm RCS boron concentration.

l September 30 23.59 At 90% power with no significant operating problems.