Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With
ML20198B857
Person / Time
Site: Vogtle  
Issue date: 11/30/1998
From: Beasley J, Hargis T
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1169-K, NUDOCS 9812210178
Download: ML20198B857 (7)


Text

.. -. -

J. Bernie Beasley, Jr, P.E.

Southore Nuclear I-Vice President Operating Cosupony, lac.

Vogtle Project 40 invemess Center Parkway E0. Box 1295 l

Birmingham. Alabama 35201

,c Tel 205.992.7110

.. Fax 205.992.0403 SOUTHERN COMPANY December 14, 1998-

_ g,,,,,,, S,,,, g,, y,,fg.

LCV-1169-K Docket Nos.

50-424 50-425 U, S. Nuclear Regulatory Commission ATfN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - NOVEMBER 1998 Enclosed are the November 1998, monthly operating reports for Vogtle Electric Generating

- Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification S.6.4.

Sincerely, J B. Beasle, Jr.

JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - November 1998 E2-VEGP Unit 2 Monthly Operating Report - November 1998 cc:

Southern Nuclear Operating Company Mr. J. T. Gasser Mr. M. Sheibani -

SNC Document Management U. S. Nuclear Regulatory Commission

,g Mr. L. A. Reyes, Regional Administrator

-D Mr. D. Jaffe, Senior Project Manager, NRR h6'

)

. Mr. J. Zeiler, Senior Resident Inspector, Vogtle q<

C8

{

^

9812210178 981130 l

PDR ADOCK 05000424' R

P M _,

e ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT-UNIT 1 MONTIILY OPERATING REPORT FOR NOVEMBER,1998 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1

. UNIT S11UTDOWNS and NARRATIVE REPORT Page El-2 1

l l

a i

h l

l l

. ~.

O' PERATING DATA REPORT Docket N).:

50-424 Unit N:.me:

VEGP UNIT 1 Date:

December 3,1998 Completed By:

T,S. Hargis Telephone:

(706)826-3469 Operating Status

1. Reporting Period:

November-1998

2. Design Electrical Rating (Net MWe):

1189 l

3. Maximum Dependable Capacity (Net MWe):

1162 l

This Month Year To Data Cumulatiya

4. Number Of Hours Reactor Was Critical:

720.0 8016.0 88,988.0

5. Hours Generator On Line:

720.0 7994.5 87,669.3 6 Unit Reserve Shutdown Hours:

0.0 0.0 0.0 i

l

7. Net Electrical Energy Generated (MWHe):

851,513 9,337,532 96,799,844 l

CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N/A N/A N/A 1

l E1-1 f

' UNIT SHUTDOWNS Docitt No.:

50-424 Unit Name:

VEGP UNIT 1 Date:

December 3,1998 Completed By:

T.S. Hargis Telephone:

(706)826-3469 l

Reporting Period:

November-1998 -

Type Method of F: Forced Duration Shutting Cause/ Corrective Actions s: W uw No.

Date (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Expisin) E Operator Training / License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip / Scram
5. Other C Refbelmg G - Operational Error (Explain)
3. Automatic Trip / Scram D - Regulatury Restriction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

CAUSE:

CORRECTIVE ACTION:

NARRATIVE REPORT November 01,1998 00:00 Unit 1 at 100% power with no operating problems.

November 30,1998 23:59 Unit 1 at 100% power with no operating problems.

E1-2

(

\\

l l

ENCLOSURE 2

' VOGTLE ELECTRIC GENERATING PLANT-UNIT 2 MONTHLY OPERATING REPORT FOR NOVEMBER,1998 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 p

I

6PERATIN"G DATA REPORT DockIt No.:

50-425 Unit NIme:

VEGP UNIT 2 Date:

December 3,1998 Completed By:

T.S. Hargis Telephone:

(706) 826-3469 Operatingliatus

1. Reporting Period:

November - 1998

2. Design Electrical Rating (Net MWo):

1169

3. Maximum Dependable Capacity (Net MWe):

1167

)

I This Month year To Date Cumulative

{

4. Number Of Hours Reactor Was Critical:

720.0 6670.9 75,494.7

5. Hours Generator On Line:

720.0 6606.0 74,765.2

6. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

7. Net Electrical Energy Generated (MWHe):

853.491 7,503,440 83,090,166 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N/A N/A N/A E2-1

UNIT SHUTOOWNS Docict No.:

50-425 Unit N;me:

VEGP UNIT 2 i

Date:

December 3,1998 Completed By:

T.S. Hargis l

Telephone:

(706)826-3469 l

4 Reporting Period:

November - 1998 Iype Method of l

F: Forced Duration Shutting Cause/ Corrective Actions s:swm No.

Date (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A EquipmentFailure(Explain) E - Operator Training 4.icense Examination

1. Manual
4. Continueuon B - Maintenance or Test F - Administrative
2. Manual Trip / Scram
6. Other

.C Refueling G OoerationalError(Explain)

3. AutomaticTrip/ Scram D Regulatory Restriction H - Other (Explain) j CAUSE/ CORRECTIVE ACTION / COMMENTS:

CAUSE.

CORRECTIVE ACTION:

CBjIICAL PATH WAS:

l NARRATIVE REPORT 1

November 01,1998 00:00 Unit 2 at 100% power with no operating problems.

i November 30,1998 23:59 Unit 2 at 100% power with no operating problems.

l E2-2 i

I l

[

1 1