J. Bernie Beasley, Jr, P.E.
Southore Nuclear I-Vice President Operating Cosupony, lac.
Vogtle Project 40 invemess Center Parkway E0. Box 1295 l
Birmingham. Alabama 35201
,c Tel 205.992.7110
.. Fax 205.992.0403 SOUTHERN COMPANY December 14, 1998-
_ g,,,,,,, S,,,, g,, y,,fg.
LCV-1169-K Docket Nos.
50-424 50-425 U, S. Nuclear Regulatory Commission ATfN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - NOVEMBER 1998 Enclosed are the November 1998, monthly operating reports for Vogtle Electric Generating
- Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification S.6.4.
Sincerely, J B. Beasle, Jr.
JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - November 1998 E2-VEGP Unit 2 Monthly Operating Report - November 1998 cc:
Southern Nuclear Operating Company Mr. J. T. Gasser Mr. M. Sheibani -
SNC Document Management U. S. Nuclear Regulatory Commission
,g Mr. L. A. Reyes, Regional Administrator
-D Mr. D. Jaffe, Senior Project Manager, NRR h6'
)
. Mr. J. Zeiler, Senior Resident Inspector, Vogtle q<
C8
{
^
9812210178 981130 l
PDR ADOCK 05000424' R
P M _,
e ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT-UNIT 1 MONTIILY OPERATING REPORT FOR NOVEMBER,1998 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1
. UNIT S11UTDOWNS and NARRATIVE REPORT Page El-2 1
l l
a i
h l
l l
. ~.
O' PERATING DATA REPORT Docket N).:
50-424 Unit N:.me:
VEGP UNIT 1 Date:
December 3,1998 Completed By:
T,S. Hargis Telephone:
(706)826-3469 Operating Status
- 1. Reporting Period:
November-1998
- 2. Design Electrical Rating (Net MWe):
1189 l
- 3. Maximum Dependable Capacity (Net MWe):
1162 l
This Month Year To Data Cumulatiya
- 4. Number Of Hours Reactor Was Critical:
720.0 8016.0 88,988.0
- 5. Hours Generator On Line:
720.0 7994.5 87,669.3 6 Unit Reserve Shutdown Hours:
0.0 0.0 0.0 i
l
- 7. Net Electrical Energy Generated (MWHe):
851,513 9,337,532 96,799,844 l
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description N/A N/A N/A 1
l E1-1 f
' UNIT SHUTDOWNS Docitt No.:
50-424 Unit Name:
VEGP UNIT 1 Date:
December 3,1998 Completed By:
T.S. Hargis Telephone:
(706)826-3469 l
Reporting Period:
November-1998 -
Type Method of F: Forced Duration Shutting Cause/ Corrective Actions s: W uw No.
Date (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Expisin) E Operator Training / License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative
- 2. Manual Trip / Scram
- 5. Other C Refbelmg G - Operational Error (Explain)
- 3. Automatic Trip / Scram D - Regulatury Restriction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
CAUSE:
CORRECTIVE ACTION:
NARRATIVE REPORT November 01,1998 00:00 Unit 1 at 100% power with no operating problems.
November 30,1998 23:59 Unit 1 at 100% power with no operating problems.
E1-2
(
\\
l l
ENCLOSURE 2
' VOGTLE ELECTRIC GENERATING PLANT-UNIT 2 MONTHLY OPERATING REPORT FOR NOVEMBER,1998 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 p
I
6PERATIN"G DATA REPORT DockIt No.:
50-425 Unit NIme:
VEGP UNIT 2 Date:
December 3,1998 Completed By:
T.S. Hargis Telephone:
(706) 826-3469 Operatingliatus
- 1. Reporting Period:
November - 1998
- 2. Design Electrical Rating (Net MWo):
1169
- 3. Maximum Dependable Capacity (Net MWe):
1167
)
I This Month year To Date Cumulative
{
- 4. Number Of Hours Reactor Was Critical:
720.0 6670.9 75,494.7
- 5. Hours Generator On Line:
720.0 6606.0 74,765.2
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
853.491 7,503,440 83,090,166 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description N/A N/A N/A E2-1
UNIT SHUTOOWNS Docict No.:
50-425 Unit N;me:
VEGP UNIT 2 i
Date:
December 3,1998 Completed By:
T.S. Hargis l
Telephone:
(706)826-3469 l
4 Reporting Period:
November - 1998 Iype Method of l
F: Forced Duration Shutting Cause/ Corrective Actions s:swm No.
Date (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A EquipmentFailure(Explain) E - Operator Training 4.icense Examination
- 1. Manual
- 4. Continueuon B - Maintenance or Test F - Administrative
- 2. Manual Trip / Scram
- 6. Other
.C Refueling G OoerationalError(Explain)
- 3. AutomaticTrip/ Scram D Regulatory Restriction H - Other (Explain) j CAUSE/ CORRECTIVE ACTION / COMMENTS:
CAUSE.
CORRECTIVE ACTION:
CBjIICAL PATH WAS:
l NARRATIVE REPORT 1
November 01,1998 00:00 Unit 2 at 100% power with no operating problems.
i November 30,1998 23:59 Unit 2 at 100% power with no operating problems.
l E2-2 i
I l
[