ML20206N214

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With
ML20206N214
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/30/1999
From: Beasley J, Sheibani M
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1306-D, NUDOCS 9905170171
Download: ML20206N214 (7)


Text

.

  • - #
  • J. Bernie Beasley. Jr, P.E. Southern Nuclzr

. Vice President Operating Comp 2:y.11c.

Vogtle Project 40 invemess Center Parkway P0. Box 1295 )

Birmingham, Alabama 35201 j Tel 205992.7110 Fax 205992.0403 SOUTHERN May 10, 1999 COMPANY Energy to Serve Your%rld" LCV-1306-D Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk I Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - APRIL 1999 l 1

Enclosed are the April 1999, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely, i

}. B. Beas r.

I JBB/JLL [

Enclosures El- VEGP Unit 1 Monthly Operating Report - April 1999 M E2- VEGP Unit 2 Monthly Operating Report - April 1999 cc: Southern Nuclear Operating Company Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. R. Assa, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle l l

[$"!8s!A mogag 10 PDR a

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTIILY OPERATING REPORT FOR APRIL 1999 TABLE OF CONTINTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2

, OPERATING DATA REPORT Docket No.: 50424 Unit Name: VEGP UNIT 1 Date: May 1.1999 Completed By: M. Sheibani Telephone: (706) 826-3209 Opera 1LngJtatus

1. Reporting Period: April - 1999 ,
2. Design Electrical Rating (Net MWe): 1169
3. Maximum Dependable Capacity (Net MWe): 1151 l

This Month Year To Date Qqm_ulative

4. Number Of Hours Reactor Was Criticat 719.0 2250.6 91.982.6
5. Hours Generator On Line: 719 0 2228.3 90.641.6
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWHe): 845.383 2.543.752 100.223.011 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No. Event Desenption 1

N/A N/A N/A l

l l

l l

E1 1

. UNIT SHUTDOWNS Docket No.: 50-424 Unit Name: VEGP UNIT 1 Date; May 1,1999 Completed By: M. Sheibani Telephone: (706) 826-3209 Reporting Period: April 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No. Date S: Sf Muled (Hours) Reason (1) Down (2) Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON: (2) METHOD:

A Equipment Failure (Explain) E - Operator Training / License Examination 1. Manual 4. Continuation B - Maintenance or Test F - Administrative 2. Manual Trip / Scram 5. Other C - Refueling G - Operational Error (Explain) 3. Automatic Trip / Scram D Regulatory Restriction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

EVENT Q_A_U.SL CORRECTIVE ACTION:

CRITICAL PATli.WA_S; I

I I

NARRATIVE REPORT Apnl 0100.00 At 100% power with no significant operating problems.

April 30 23.59 At 100% power with no significant operating problems.

E12

E l

l l

i 1

1 ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 <

MONTilLY OPERATING REPORT FOR APRIL 1999 TABLE OF CONTENTS ,

OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 i

UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 1

OPERATING DATA REPORT l Docket No.: 50-425  !

Unit Name: VEGP UNIT 2 Date: May 1,1999 Completed By: M. Shelbant $

l Telephone: t 706 ) 826-3209 OperatJngitatus

1. Reporting Period: April - 1999
2. Design Electrical Rating (Net MWe): 1169 ll
3. Maximum Dependable Capacity (Net MWe): 1154 l This M_qnih n Lear To Date Carnujaliyg i
4. Number Of Hours Reactor Was Criticat 719.0 2854.2 79,092.9 1
5. Hours Generator On Line: 719.0 2834.3 78.343.5
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWHe): 844.368 3.327,672 87.303.010 l

i CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES '

Date Tag No. Event Desenptiori i

I l

l N/A N/A N/A i

I

, E2-1 1

- UNIT SHUTDOWNS Docket No.: 50425 Unit Name: VEGP UNIT 2 Date: May 1,1999 Completed By: M. Sheibane Telephone: (706)826-3209 Reporting Period: April - 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No. Date S: Scheduled (Hours) Reason (1) Down (2) Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON: (2) METHOD:

A - Equipment Failure (Explain) E Operator Training / License Examination 1. Manual 4. Continuation B - Maintenance or Test F - Administrative 2. Manua! Trip / Scram 5. Other -

C - Refueling G - Operational Error (Explain) 3. AutomaticTrip/ Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

EVENT QASSE QORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT Apnl 0100:00 At 100% power with no significant operating problems.

April 30 23 59 At 100% power with no significant operating problems.

E2-2