ACCELERATED DIWIUBUTION DEMONS TION SYSIEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9004100403 DOC.DATE: 90/03/09 NOTARIZED:
NO FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co.
50-423 Millstone Nuclear Power Station, Unit 3, Northeast Nu 50-424 Alvin W. Vogtle Nuclear Plant, Unit 1, Georgia Power 50-425 Alvin W. Vogtle Nuclear Plant, Unit 2, Georgia Power AUTH.NAME
.AUTHOR AFFILIATION KNECHT,W.G.
Anchor/Darling Valve Co.
(subs.
of Anchor/Darling RECIP.NAME RECIPIENT AFFILIATION NRC No Detailed AffiliationGiven
'DOCKET 05000389 05000423 05000424 05000425 Industrie
SUBJECT:
Errata to 900126 Part 21 rept re Anchor/Darling actuators incorporating use of Teldyne-Republic four-way valves. Lists plants inadvertently left out in original rept.
A DISTRIBUTION CODE:
IE19D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Part 21 Rept (50-DKT)
NOTES:Application for permit renewel filed.
,05000425 RECIPIENT ID CODE/NAME PD2-2 LA PD2-3 LA PD1-4 PD
'ORRIS,J REED,T INTERNAL. AEOD/DOA IRM TECH ADV NRR VARGA,S NRR/DOEA/OGCB11 REG EI 01 RGN3 RGN5 EXTERNAL: INPO RECORD CTR NRC PDR COPIES LTTR ENCL 1
0 1
0 1
1 1
1 1
1 1
1 1
1
,1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME PD1-4 LA PD2-2 PD PD2-3 PD JAFFE,D AEOD/DSP/TPAB NRR CRUTCHFIELD NRR/DLPQ/LPEB10 NRR/DRIS/RVIB9D NUDOCS-ABSTRACT.
RES/DSIR/EIB RGN2 RGN4 LPDR NSIC SILVERi E COPIES LTTR ENCL 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 3
3 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASIH CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 32 ENCL 29
Anchor/Dar ~ng Valve Company-701 FIRST STREET P.O. BOX 3428 WILLIAMSPORT, PA 1770M428 (717) 327<800 TELEX: 759953 March 9, 1990 Director - Office of Inspection 8 Enforcement US Nuclear Regulatory Commission Washington, DC 20555
Subject:
10 CFR 21 Reportable Incident
Reference:
Anchor/Darling Valve Company letter dated January 26, 1990 Gentlemen:
The above referenced letter (copy attached) identified a potential problem and listed plant sites that have been supplied with our actuator which incorporate the use of Teldyne-Republic four-way valves.
We inadvertantly left off the',
following three sites:
Northeast Utilities Milestone 3
Florida Power 8 Light St. Lucie 2 Georgia Power Company Vogtle 1
& 2.
These sites
- were, however, notified of the problem at the same time as the other sites (see letters attached)
~
Please excuse the oversite.
WGK/jf Attachments cc:
A.
E.
Caron R.
W.
Dommers F. Velez F. A. Bensinger G.
K. Knieser J. J.
Chappell H.
R. Patterson l(~
/("
V