|
---|
Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20198E0631998-01-0707 January 1998 Part 21 Rept Re Shipment by Dubose National Energy Svcs,Inc, of 40 Pieces of 4 inch,90 Degree Elbows Which Did Not Meet ASME Section II SA-234 Requirements ML17309A6211997-09-29029 September 1997 Part 21 Rept Re Final Disposition of Masterflow 713 & Embeco 636 Grout Nonconformance Reported by Master Builders,Inc. Licensee Continuing to Monitor shelf-life of Masterflow 713 & Embeco 636 Grouts Produced at Rancho Cucamonga ML20217K5991997-08-11011 August 1997 Part 21 Interim Rept Re Fafnir S7K Bearing Discrepancies. Further Evaluation of Deviation Is Required & Will Be Completed by 971111 ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20140G4481997-05-0101 May 1997 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause ML20134H3361996-11-0505 November 1996 Part 21 Rept Re Defective Inner Thrust Bearing 1801461-01 Used in PSA 35 Mechanical Shock Arrestor Used as Restraint on Piping Sys for Nuclear Generating Plant.Lot of Defective Parts Located & Isolated to Three Customers ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20115D2001996-07-0909 July 1996 Part 21 Rept Re Mfg Defect of Enterprise DSR-4 & DSRV-4 Edgs,Originally Mfg by Calcon Corp.Amot Control Corp Purchased Calcon Product Line & Maintains Design & Production.Valves Returned to Cooper Energy Svcs on 960131 ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML20100L7411996-02-29029 February 1996 Final Part 21 Rept Re Fan Motor Bearing Indications,Updating Status of Evaluation of Deviation.Bearings for Unit 2 Fcus Inspected & No Linear Indications Noted.Unit 1 Fcu Bearings Will Be Inspected Prior to Upcoming Refueling Outage ML20097A5641996-01-31031 January 1996 Final Part 21 Rept Re Ball Valves Supplied by Cardinal Industrial Products Containing Suspect Pressure Boundary Bolting.Valves Containing Suspect Bolts Returned to Canadian Worcester Controls Ltd to Have Bolting Replaced TXX-9603, Interim Part 21 Rept Re Linear Indication on Fan Motor Bearings Mfg by Fafnir.Bearings Provided as Spares for Four UPS Room Fan Coil Units.Further Evaluation Required & Evaluation Will Be Completed by 9602291996-01-29029 January 1996 Interim Part 21 Rept Re Linear Indication on Fan Motor Bearings Mfg by Fafnir.Bearings Provided as Spares for Four UPS Room Fan Coil Units.Further Evaluation Required & Evaluation Will Be Completed by 960229 ML20092H3641995-09-13013 September 1995 Part 21 Rept Re 3/4 Inch ASME Section III Class 2 Ball Valves Supplied by Canadian Worcester Controls Ltd (Cwcl) ML18038A8971994-09-0707 September 1994 Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures ML20064G3441994-03-0707 March 1994 Part 21 Rept Re RTP Universal I/O Controller Interface Card Utilized in Universal I/O Controller Supplied for Installation at Comanche Peak.Design Corrected Through Engineering Change Order Adding Two Filter Capacitors ML20064G3391994-03-0707 March 1994 Part 21 Rept Re RTP Universal I/O Controller Interface Card Utilized in Universal I/O Controller,Supplied for Installation at Comanche Peak & Yonggwang Nuclear Power Plant,Units 3 & 4.Two Filter Capacitors Added to Design ML20064G3261994-03-0707 March 1994 Part 21 Rept Re RTP Universal I/O Controller Interface Card Utilized in Universal I/O Controller Supplied for Installation at Comanche Peak.Design Corrected Through Engineering Change Order Adding Two Filter Capacitors ML20063K6791994-02-16016 February 1994 Part 21 Rept Re Failed Bolting on Pacific Air Products Co Gravity Dampers.Failed Bolts Replaced W/Higher Strength Bolts ML20059H7721994-01-17017 January 1994 Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 ML20059F2631994-01-0707 January 1994 Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20059A7181993-10-19019 October 1993 Part 21 Rept Re Defective Rocker Arms Supplied to TU & Clei. Rocker Arms Machined & Inspected to Incorrect Print & Discovered at Tu.Defective Rocker Arms Recalled from Nuclear Customers.No Corrective Action Required at Respective Utils ML20024H8341993-08-19019 August 1993 Part 21 Rept Re Potential Problem W/Installation of Bushing in gear-type,3 Gpm,Oil Pump Used in Refrigerant Compressors, Mfg by Dunham-Bush.CVI Will Call for Hold Point in Fabrication Process Where Bushing Installed ML20012G3261993-02-18018 February 1993 Part 21 Rept Re Borg-Warner Bolted Bonnet Swing Check Valve Failing to Close During Preoperational Testing.Caused by Internal Body Wall Protrusions Resulting from Intersecting Machine Bores.Design Mods Will Be Implemented ML20128M7821993-02-12012 February 1993 Part 21 Rept Re Failure of 4-inch,150 Bolted Bonnet Swing Check Valve 2CC-0697 to Fully Close During Preoperational Testing.Disc Design Mod Installed.New Disc Component Should Be Installed or Existing Disc Refurbished ML20127P6151993-01-22022 January 1993 Final Deficiency Rept CP-92-019 Re Steam Leak Discovered in Train a RHR Pump Casing Gasket & Seal on 920729.No Apparent Damage to Seal Noted.Item Not Reportable Per 10CFR50.55(e) or Part 21 ML20127L4661993-01-20020 January 1993 Suppl to Final Deficiency Rept CP-89-015,provided on 921130 Re Check Valves 2CC-0693 & 2CC-0697 Failure to Close on 921201.Valves Reworked & Retested Satisfactorily.Supplier Bw/Ip Advised of Test Failures,Cause & Corrective Actions ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20127A1201993-01-0808 January 1993 Supplemental Deficiency Rept CP-92-004 Re Mfg Defects in Printed Circuit Boards for Elgar Class 1E Electric Power Inverters.Initially Reported on 920513.Baseline Data Established for Each Printed Circuit Board ML20127C2191993-01-0707 January 1993 Supplemental Deficiency Rept CP-92-010 & Final Deficiency Rept CP-92-020 Re Cracks in Containment Spray Pump Suction Vent Piping,Initially Reported on 920722 & 1204, Respectively.Unacceptable Configurations Modified TXX-9263, Interim Deficiency Rept CP-92-020 Re Cracks in Containment Spray Sys.Initially Reported on 921204.Detailed Rept Will Be Submitted by 9301111993-01-0404 January 1993 Interim Deficiency Rept CP-92-020 Re Cracks in Containment Spray Sys.Initially Reported on 921204.Detailed Rept Will Be Submitted by 930111 TXX-9262, Suppl to Final Deficiency Rept CP-87-122 Re Overstress Condition in Various Equipment Nozzles.Initially Reported on 871125.Nozzle Loads Specified for Applicable Equipment Qualified & within Stress Limits Specified in FSAR1992-12-31031 December 1992 Suppl to Final Deficiency Rept CP-87-122 Re Overstress Condition in Various Equipment Nozzles.Initially Reported on 871125.Nozzle Loads Specified for Applicable Equipment Qualified & within Stress Limits Specified in FSAR ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML20126E1551992-12-22022 December 1992 Supplemental Deficiency Rept CP-92-007 on QA Program Breakdown of Kranco,Inc Re Parts for Polar Crane Supplied W/O Dedicated QA Program.Initially Reported on 920814.Util Will Not Utilize Supplied Components for Critical Lifts ML20126C7691992-12-18018 December 1992 Final Deficiency Rept CP-92-018 Re Steam Leak Discovered in 3-inch Schedule 80 Lateral Installed SG Blowdown Sys. Initially Reported on 920729.Caused by Porosity in Initial Casting.Item Not Reportable Per 10CFR50.55(e) or Part 21 ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20125D5431992-12-11011 December 1992 Final Deficiency Rept CP-92-016 Re Stems on Borg-Warner manually-operated 3-inch Gates Valves Separating from Disks. Initially Reported on 920911.Addl Administrative Controls Will Be Implemented to Prevent Inadvertent Damage ML20125D3871992-12-0808 December 1992 Interim Deficiency Rept CP-92-019:on 920729,steam Leak Discovered in Train a RHR Pump Casing Gasket & Seal During Hot Functional Testing.Deviation Being Evaluated.Evaluation Will Be Complete by 930125 ML20125A9511992-12-0404 December 1992 Part 21 Rept,Providing Major Milestone Schedule & Portions of Part 21 Open Items List of Issues Currently in Review TXX-9253, Final Deficiency Rept CP-89-015 Re Backleakage Through AFW Check Valves Supplied by Bw/Ip Intl,Inc.Initially Reported on 890519 & Documented in Insp Rept 50-446/92-25. Check Valves Will Be Inspected Prior to Fuel Load1992-11-25025 November 1992 Final Deficiency Rept CP-89-015 Re Backleakage Through AFW Check Valves Supplied by Bw/Ip Intl,Inc.Initially Reported on 890519 & Documented in Insp Rept 50-446/92-25. Check Valves Will Be Inspected Prior to Fuel Load ML20116E2991992-11-0303 November 1992 Part 21 Rept Forwarding CPSES Major Milestone Schedule & Portions of Part 21 Open Items List of Issues That Are Currently in Review ML20116C6001992-10-30030 October 1992 Final Deficiency Rept CP-92-010 Re Containment Spray Pump Vent Weld Cracks.Initially Reported on 920722.Vent Pipe Replaced & Containment Spray Pump Vibration Being Corrected, Per Steady State Vibration Monitoring Test ML20116C4631992-10-30030 October 1992 Final Deficiency Rept CP-92-08 Re Train B Diesel Generator Auxiliary Lube Oil Pump Valve.Initially Reported on 920722. All Nine Valves in Warehouse Have Been Magnetic Particle Examined ML20116D1571992-10-29029 October 1992 Final Deficiency Rept CP-92-12 Re Deviation in Several Spare ferro-resonant Transformers.Initially Reported on 920618. Caused by THD Measurement Exceeding Westinghouse Equipment Spec Criteria.Not Reportable Per 10CFR50.55(e) or Part 21 ML20115H0771992-10-20020 October 1992 Final Deficiency Rept CP-92-017 Re Improper Position of Seal Water Circulating Ring on Train a RHR Pump Supplied by Intersoll-Rand.Initially Reported on 920921.Motor Raised & Disassembled to Position Circulating Ring Properly ML20115C1781992-10-13013 October 1992 Interim Deficiency Rept SDAR-CP-92-016,re Defect in Two Manually Operated 3 Inch Gate Valves,In Which Stems Separated from Disks & Disks Being Wedged in Seats.Initially Reported on 920911.Internals of Two Valves Replaced 1999-04-12
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217K7741999-09-30030 September 1999 Rev 1 to Vegp,Unit 1 Cycle 9 Colr ML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20217K8041999-09-30030 September 1999 Rev 1 to Vegp,Unit 2 Cycle 7 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20196F9711999-05-31031 May 1999 Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling Outage ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20206A6561999-04-21021 April 1999 Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205A9581999-03-31031 March 1999 Rev 0 to VEGP Unit 1 Cycle 9 Colr ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20209H4091999-02-15015 February 1999 Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20209H3951999-02-15015 February 1999 Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202H9851999-01-29029 January 1999 Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199F8041999-01-13013 January 1999 Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage ML20198S1781998-12-31031 December 1998 SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With 1999-09-30
[Table view] |
Text
- _. _ _ _ _ - _ _ _ . - _ _ . _- . . .
. l 150 bncoln Avenue )
- Grove Ccy, PA 161271898 l T;4 412 458 8000 !
Fu 412 458 3574 Ajax@
c** "'*
C.O O P E R 1 ENERGY SERVICES U.'"2."~~*
En-Tronk@
I Peno*
5"P'
May 22,1998 Our Ref: OCG 10483 (K5fa43)
Document Control Desk U.S. Nuclear Regulatory Commission ,
Washington, D.C. 20555
Subject:
10 CFR 21 Notification, Enterprise DSR-4 and DSRV-4 Emergency Diesel i
DearSir:
In accordance with the retirements of the Nuclear Regulatory Commission Title 10, Chapter 1, Code of Federal Regulations, Part 21, Cooper Energy Services (CES), a division Jf Cooper Cameron Corporation, provides initial ratification and an interim report of a 10CFR Part 21 evaluation associated with the 701 Digital Speed Control, Rev. G Installed at Southem Nuclear Company's Plant Vogtle and Texas Utilities Commanche Peak. j Discussion:
These digital 701 goveming systems are manufactured by Woodward Govemor Company of Fort Collins, Colorado and sold by Cooper Energy Sen/hes as part number 2-02G-110-001, Woodward part number 9903 466, Revision G). Revision G is the only revision of the subject part that has the potential problem. The Revision G controller design was recently introduced by Woodward to address an anomaly found during laboratory testing of the previous conf guration. Evaluations conducted by CES and the two affected utilities at that time determined that this anomaly was not credible in nuclear service. Nevertheless, the original controllers were being changed to the later revision to satisfy the Woodward concerns.
An application problem has been identified with the Remion G acward 701 Digital Speed Control used on Emergency Diesel Generators. It was .rountered during the spring outages at both Southem Nuclear Company's Plant Vogtle and Texas Utilities Commanchie Peak Stations.
During the outages, the Woodward 701 Digital Speed Controllers were being upgraded from the original revision provided to the utilities by Cooper Energy Services, to the current Revision G control. Post-installation testing revealed that high EMI/RFI levels affected the new controllers, whereas the original controllers were unaffected.
Cooper Energy Services is warking to identify the exact source /cause of the problem, detemiine the solution, and evaluate the 10 CFR Part 21 applicability. In the interim, the two utilities have \{
placed the original controllers back into service in order to keep the diesel generators operational.
O 7 9805290304 990522 4 l
PDR ADOCK 05000424: /
S PDR ,
, Page 2 May 22,108 Ref: OCG-10483 (K5fa-43)
A follow-up report will be provided no later than July 31,1998.
Affected Sites:
1 Southern Nuclear Company, Plant Vogtle Texas Utilities, Commanche Peak Station l
STP Nuclear Operating Company (Houston Light and Power Co.)
Sincerely, COOPER ENERGY SERVICES Peter DeFronzo General Manager Copies to:
Mr. Louis Ward, Southem Nuclear Company (Fax 205-992-7885)
Southern Nuclear Operating Company Vogtle Project P. O. Box 1295 Birmingham, AL 35201 j Attn: Mgr., Nuclear Engineering and Licensing l Mr. Stephen Alexander Nuclear Regulatory Commission QA Vendor insp. & Maintenance Branch One White Filnt North Mailstop 9A1 '
Washington, DC 20555 l
TU Electric Company P. O. Box 1002 Glen Rose, TX 76043 Attn: Group Vice President, Nuclear STP Nuclear Operating Company South Texas Project Electric P. O. Box 289 Wadsworth, TX 77483 Attn: General Manager I Nuclear Assurance and Licensing
1 E0!RN SERVICES h
'pf 150 LINCOLN AVENUE GROVE CITY, PA 16127 PHONE: (724) 458-3575 FAX:(724)458-3461 DATE: 5/&Ud TO: A/[d _
y sp/ g A I.,
COMPANY: FAX: N/ * [/d -*[/$~/
FROM- > h M @An-TELEPHONE: M /- N -dSY4~ FAX: 7M-N"Ed/
NUMBER OF PAGES INCLUDING COVER: d PLEASE CALL (724) 458-3575, IF YOU DID NOTRECEIVE ALL OF THE PAGES 1
PLEASE NOTE eOUR NEW FAX NUMBER IS 724-458-3461.
d P -
GENERAL INFORMATION or OTHER EVENT NUMBER: 34281 LICENSEE: COOPER ENERGY SERVICES NOTIFICATION DATE: 05/22/98 CITY: GROVE CITY REGION: 1 NOTIFICATION TIME: 16:10 [ET)
COUNTY: STATE: PA EVENT DATE: 05/22/98 LICENSE #: AGREEMENT: N EVENT TIME: : [EDT]
DOCKET: - -- LAST UPDATE DATE: 05/22/98 l 1
l NOTIFICATIONS GENE KELLY / REG 1 RDO STUART RICHARDS/NRR EO
.(C NOTIFIED BY: PETER DeFRONZO AL BELISLE/ REG 2 RDO 3 HQ OPS OFFICER: FANGIE JONES JOHN PELLET / REG 4 RDO VERN HODGE NRR EMERGENCY CLASS: NOT APPLICABLE i l
10 CFR SECTION:
CCCC 21.21 UNSPECIFIED PARAGRAPH EVENT TEXT j i
.gl0%FR@PART21' NOTIFICATION-ENTERPRISEDSR-4ANDDSRV-4EMERGENCYDIESEL AN APPLICATION PROBLEM HAS BEEN ASSOCIATED WITH THE 701 DIGITAL SPEED CONTROL (REVISION 'G' CONTROLLER DESIGN) INSTALLEe AT PLANTS VOGTLE AND COMANCHE PEAK. THE SPEED CONTROLS ARE MANUFACTURED BY WOODWARD GOVERNOR COMPANY AND SOLD BY COOPER ENERGY SERVICES AS PART NUMBER 2-02G-110-001.
REVISION 'G' IS THE ONLY REVISION OF THE SUBJECT PART THAT HAS THE POTENTIAL PROBLEM, AND IT WAS RECENTLY INTRODUCED TO ADDRESS AN ANOMALY OF PREVIOUS CONTROLLERS. EVALUATIONS OF THE ANOMALY INDICATED NO CREDIBLE PROBLEM IN NUCLEAR SERVICE. THE ORIGINAL CONTROLLERS WERE STILL BEING REPLACED WITH THE LATER REVISION (REVISION 'G') TO SATISFY WOODWARD CONCERNS.
POST-INSTALLATION TESTING OF THE NEW CONTROLLERS REVEALED THAT HIGH EMI/RFI LEVELS AFFECTED THE NEW CONTROLLERS, WHEREAS THE ORIGINAL CONTROLLERS WERE UNAFFECTED. WORK IS PROGRESSING TO IDENTIFY THE EXACT CAUSE OF THE PROBLEM AND TO DETERMINE A SOLUTION. IN THE INTERIM, THE TWO UTILITIES HAVE PLACED THE ORIGINAL CONTROLLERS BACK INTO SERVICE TO KEEP THEIR EMERGENCY DIESEL GENERATORS OPERATIONAL.
A FOLLOW-UP REPORT WILL BE PROVIDED NO LATER THAN JULY 31, 1998.
COOPER ENERGY HAS NOTIFIED SOUTHERN NUCLEAR OPERATING COMPANY (VOGTLE .
PROJECT), TU ELECTRIC' COMPANY (COMANCHE PEAK), AND STP NUCLEAR OPERATING f COMPANY (SOUTH TEXAS PROJECT) OF THIS 10-CFR-PART-21 REPORT. i l
(
- _ _ _ _ _ - _ _ _ _ _ _ _