Text
CI.McCJ(
Southern Nucleer VK.e President Operating Company. loc.
Vogtle Project 40 Invemess Center Parkway P0. Box 1295 Birmingham. Alabama 35201 Tel 205 992.7122 f ax 2059920403 SOUTHERN Ra COMPANY Energy to Servehur%rld' March 9, 1998 LCV-1169-B Docket Nos.
50-424
{
50-425 U. S. Nuclear Regulatory Commission ATFN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTilLY OPERATING REPORT-FEBRUARY 1998 Enclosed are the February 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely, C. K. McCoy CKM/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - February 1998 E2-VEGP Unit 1 Monthly Operating Report - February 1998 Southern Nuclear Operating Comnany cc:
l Mr. J. B. Beasley, Jr.
Mr. M. Sheibani j
NORMS g
Qg{
-,LAAC 11 S. Nuclear Regulatory Commission h
'f Mr. L A. Reyes, Regional Administrator Mr. D. Jaffe, Senior Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle k!k l!!
c-9003170449 980228 PDR ADOCK 05000424 R
\\
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONT11LY OPERATING REPORT FOR FEBRUARY 1998 TABLE OF CONTENTS OPERATING DATA REPORT and CilALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SilUTDOWNS and NARRATIVE REPORT Page El-2 i
l I
a OPERATING DATA REPORT DockCt No.:
50-4_24_ _
Unit Name:
.M,_ arch 2,1998 Completed By:
T.S. Hargis _
Telephone:
,(7_06) 826-3469 Operating Status
- 1. Reporting Period:
Feb-98
- 2. Design Electrical Rating (Net MWe):
1i6(
~
- 3. Maximum Dependable Capacity (Net MWe):
116?.
j j
This Month Year _To Date Cumulative j
- 4. Number Of Hours Rescior Was Critical:
672.0 1416.0 82,388.0
- 5. Hours Generator On Une:
~572i6 14166 85,09'0I6
- 6. Unit Reserve Shutdown Hours:
0.0.,
0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
795d49_
1,67__7J84, 89,139A96_
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date __ Tag No.
_ Event Description 02/04/98 1PV0455 During the failure of AY1 A, PORV 1PV0455 cycled open due to a swing in pressure channel 1P-455, tail pipe temp trends indicate PORV reciosed.
E1-1
{
i
. UNIT SHUTDOWNS Docket No.:
$ 424 Unit Name:
VEG'P UNIH Date:
M. arch 2,1998 Completed By:
T.S. Hargis_
q Telephone:
2 06) 826-3469 Reporting Period:
,,_ Feb-98 j
Type
' Method of F; Forced Duration Shutting Cause/ Corrective Actions s:
No.
Date scheduled (Hour _s)_
Reason (1)
Down @_
[ Comments NA NA NA NA NA NA NA (1) REASON:
(2) METHOD:
A - Equipment Failure (ExplairE - Operator Training / License Examination
- 1. Manual
- 4. Continuation D - Maintenance or Test F Adrranistrative
- 2. Manual Trip / Scram
- 5. Other C. Refuehng G - Operational Error (Explain)
- 3. Automate Trip / Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
NARRATIVE REPORT February 0100:00 Unit at 100% power with no operating problems.
February 28 23:59 Unit at 100% power with no operating problems.
i I
1 1
E1-2
-4 ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT-UNIT 2 MONTI1LY OPERATING REPORT FOR FEBRUARY 1998 TABLE OF CONTENTS OPERATINC OATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SliUTDOWNS and NARRATIVE REPORT Page E2-2
\\
\\
. OPERATING DATA REPORT Docket No.:
50-435~
Unit Name:
yEGP ONi_T 2 Date:
Merch 2,1998 Completed By:
J.S. Hargis___
Telephone:
17_06L826-3469 Operating Status
- 1. Reporting Period:
Feb-98
- 2. Design Electrical Rating (Net MWe):
1169~
- 3. Maximum Dependable Capacity (Net MWe):
1167 This Month Year To Date Cumulative
- 4. Number Of Hours Reactor Was Critical:
672.0 1416.0 70,239.8
- 5. Hours Generator On Line:
672[0}
14IB'.(
69',575Y
~
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
761,617_
1,643 809 77,230,53_5 1
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
! Event De.scription NA NA NA E2-1
l e
. UNIT SHUTDOWNS g
Docket No.:
50-425
~
Unit Name:
VEGP UNIT 2 Date:
(March 21998 Completed By:
.T.S. Hargis_ __.
Telephone:
(706}826-3469 i
Reporting Period:
Feb-98 l Type
- Method of F FM Duration Shutting Cause/ Corrective Actions s m uw No.
Date (Hours)
Reason (1)
Down (2)
Comments NA NA NA NA NA NA NA (1) REASON:
(2) METHOD:
A - Equipment failure (Explain) E Operator Training /t.icense Examination
- 1. Manua;
- 4. Conbnuabon B Maintenance or Test F Aderi.1istrabve
- 2. Manual Trip / Scram
- 5. Other C - Refuehng G - Operational Error (Explain)
- 3. AubmateTrip/Scrarn D - Regulatory Restriction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
NARRATIVE REPORT February 0100:00 Unit at 100% power with no operating problems.
February 1314:35 Unit commenced coastdown to refueling outage 2R6 which begins in March.
February 28 23:59 Unit at 86% power with no operatileg problems.
i E2-2 l