Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2
ML20216E242
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/28/1998
From: Hargis T, Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1169-B, NUDOCS 9803170449
Download: ML20216E242 (7)


Text

CI.McCJ(

Southern Nucleer VK.e President Operating Company. loc.

Vogtle Project 40 Invemess Center Parkway P0. Box 1295 Birmingham. Alabama 35201 Tel 205 992.7122 f ax 2059920403 SOUTHERN Ra COMPANY Energy to Servehur%rld' March 9, 1998 LCV-1169-B Docket Nos.

50-424

{

50-425 U. S. Nuclear Regulatory Commission ATFN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTilLY OPERATING REPORT-FEBRUARY 1998 Enclosed are the February 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely, C. K. McCoy CKM/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - February 1998 E2-VEGP Unit 1 Monthly Operating Report - February 1998 Southern Nuclear Operating Comnany cc:

l Mr. J. B. Beasley, Jr.

Mr. M. Sheibani j

NORMS g

Qg{

-,LAAC 11 S. Nuclear Regulatory Commission h

'f Mr. L A. Reyes, Regional Administrator Mr. D. Jaffe, Senior Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle k!k l!!

c-9003170449 980228 PDR ADOCK 05000424 R

PDR

\\

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONT11LY OPERATING REPORT FOR FEBRUARY 1998 TABLE OF CONTENTS OPERATING DATA REPORT and CilALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SilUTDOWNS and NARRATIVE REPORT Page El-2 i

l I

a OPERATING DATA REPORT DockCt No.:

50-4_24_ _

Unit Name:

VEGP U_ NIT 1 Date:

.M,_ arch 2,1998 Completed By:

T.S. Hargis _

Telephone:

,(7_06) 826-3469 Operating Status

1. Reporting Period:

Feb-98

2. Design Electrical Rating (Net MWe):

1i6(

~

3. Maximum Dependable Capacity (Net MWe):

116?.

j j

This Month Year _To Date Cumulative j

4. Number Of Hours Rescior Was Critical:

672.0 1416.0 82,388.0

5. Hours Generator On Une:

~572i6 14166 85,09'0I6

6. Unit Reserve Shutdown Hours:

0.0.,

0.0 0.0

7. Net Electrical Energy Generated (MWHe):

795d49_

1,67__7J84, 89,139A96_

CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date __ Tag No.

_ Event Description 02/04/98 1PV0455 During the failure of AY1 A, PORV 1PV0455 cycled open due to a swing in pressure channel 1P-455, tail pipe temp trends indicate PORV reciosed.

E1-1

{

i

. UNIT SHUTDOWNS Docket No.:

$ 424 Unit Name:

VEG'P UNIH Date:

M. arch 2,1998 Completed By:

T.S. Hargis_

q Telephone:

2 06) 826-3469 Reporting Period:

,,_ Feb-98 j

Type

' Method of F; Forced Duration Shutting Cause/ Corrective Actions s:

No.

Date scheduled (Hour _s)_

Reason (1)

Down @_

[ Comments NA NA NA NA NA NA NA (1) REASON:

(2) METHOD:

A - Equipment Failure (ExplairE - Operator Training / License Examination

1. Manual
4. Continuation D - Maintenance or Test F Adrranistrative
2. Manual Trip / Scram
5. Other C. Refuehng G - Operational Error (Explain)
3. Automate Trip / Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

NARRATIVE REPORT February 0100:00 Unit at 100% power with no operating problems.

February 28 23:59 Unit at 100% power with no operating problems.

i I

1 1

E1-2

-4 ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT-UNIT 2 MONTI1LY OPERATING REPORT FOR FEBRUARY 1998 TABLE OF CONTENTS OPERATINC OATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SliUTDOWNS and NARRATIVE REPORT Page E2-2

\\

\\

. OPERATING DATA REPORT Docket No.:

50-435~

Unit Name:

yEGP ONi_T 2 Date:

Merch 2,1998 Completed By:

J.S. Hargis___

Telephone:

17_06L826-3469 Operating Status

1. Reporting Period:

Feb-98

2. Design Electrical Rating (Net MWe):

1169~

3. Maximum Dependable Capacity (Net MWe):

1167 This Month Year To Date Cumulative

4. Number Of Hours Reactor Was Critical:

672.0 1416.0 70,239.8

5. Hours Generator On Line:

672[0}

14IB'.(

69',575Y

~

6. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

7. Net Electrical Energy Generated (MWHe):

761,617_

1,643 809 77,230,53_5 1

CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

! Event De.scription NA NA NA E2-1

l e

. UNIT SHUTDOWNS g

Docket No.:

50-425

~

Unit Name:

VEGP UNIT 2 Date:

(March 21998 Completed By:

.T.S. Hargis_ __.

Telephone:

(706}826-3469 i

Reporting Period:

Feb-98 l Type

Method of F FM Duration Shutting Cause/ Corrective Actions s m uw No.

Date (Hours)

Reason (1)

Down (2)

Comments NA NA NA NA NA NA NA (1) REASON:

(2) METHOD:

A - Equipment failure (Explain) E Operator Training /t.icense Examination

1. Manua;
4. Conbnuabon B Maintenance or Test F Aderi.1istrabve
2. Manual Trip / Scram
5. Other C - Refuehng G - Operational Error (Explain)
3. AubmateTrip/Scrarn D - Regulatory Restriction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

NARRATIVE REPORT February 0100:00 Unit at 100% power with no operating problems.

February 1314:35 Unit commenced coastdown to refueling outage 2R6 which begins in March.

February 28 23:59 Unit at 86% power with no operatileg problems.

i E2-2 l