i 1
fL OPERATING DATA REPORT j
DockCt No.:
50-424_ _.
Unit Name:
VEGP UNIT 1 Date:
~ June _1,1998 Completed By:
_T.S. _Hargis_.
Telephone:
p_06)_826-3469 Operating Status
- 1. Reporting Period:
May-98 l
- 2. Design Electrical Rating (Net MWe):
- 1169,
- 3. Maximum Dependable Capacity (Net MWe):
1162 This Month Year _To Date Cumulative
- 4. Number Of Hours Reactor Was Critical:
744.0_
3623.0, 84_,595.0_
- 5. Hours Generator On Line:
722.5 3601.5 83,276.3
- 6. Unit Reserve Shutdown Hours:
0.0_
0.0_
0.0
- 7. Net Electrical Energy Generated (MWHe):
825,563 4,224,454 91,686,766 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
' Event Description N/A N/A N/A l
E1-1 9906160385 990610 PDR ADOCK 05000424' R
UNIT SHUTDOWNS Docket No.:
50-424 _ __
Unit Name:
VEGP UNIT 1 Date:
June 1,1998 Completed By:
T.S. Hargis -
Telephone:
}7061816 3469 2
Reporting Period:
May-98 Method of Type Cause/ Corrective Actions F: Forced Duration Shutting No.
tDate (Hours)
Reason (1) own (2)
Comments 8 *d" SEE BELOW 98-1 05/22/98 S
21.5 B
1 I
(2) METHOD:
(1) REASON:
- 1. Manual 4 Continuation A Equipment Failure (Explasn) E - operator Training /Ucense Examinata
- 2. Manualinp/ Scram 5 Other B Maintenance or Test F - Administratwo
- 3. AutomaticTnp/ Scram G OperationalError(Explain)
C Refueling H - Other (Explain)
D Regulatory Restrden CAUSE/ CORRECTIVE ACTION / COMMENTS:
EVENT 98:1 Planned Maintenance Outage Replace the power supply on the main generator voltage regulator and retumed CAUSE:
I CORRECTIVE ACTION:
to service.
NARRATIVE REPORT May 01,1998 00:00 Unit 1 at 100% power with no operating problems.
May 22,1998 20:07 Unit i began power reduction in preparation for planned maintenance o May 23,1998 03:39 Unit 1 Turbine tripped for planned maintenance outage, reactor at 21%
May 24,1998 01:08 Unit 1 generator tied to grid.
May 25,1998 03:00 Unit i retumed to 100%.
May 31,1998 23:59 Unit i at 100% power with no operating problems.
E1-2
U~
3-s.
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTilLY OPERATING REPORT FOR MAY 1998 TABLE OF CONTENTS L
L OPERATING DATA REPORT and CilALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT Sl1UTDOWNS and NARRATIVE REPORT Page E2-2 i
t I
l i
i
_ = _
OPERATING DATA REPORT Docket No.:
50-42_5,_.
Unit Name:
VEGP UNIT 2 Date:
June 1,1998 Completed By:
T.S. _H_argis Telephone:
17_06) 826-3469 l
Operating Status
- 1. Reporting Period:
Mayi8_
- 2. Design Electrical Rating (Net MWe):
1169_
- 3. Maximum Dependable Capacity (Net MWe):
1167 This Month Yeat.To Date Cumulative
- 4. Number Of Hours Reactor Was Critical:
591.8 2457.7 71.281.5
- 5. Hours Generator On Line:
588.8 2427.7 70,587.0
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
668,032 2,704,664 78.291,390 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description NA NA NA l
l l
E2-1
1 UNIT SHUTDOWNS Docket No.:
50-425
+
Unit Name:
VEGP DNIT 2'~~
Date:
Mris171998 Completed By:
.T.STHirgi[s..
Telephone:
.{706)826-3469 Reporting Period:
_May 08 l Type
- Method of F; forced Duration Shutting Cause/ Corrective Actions No.
Date __8 8""'f(Hours)_ Reason (1)_Down,(2)
, Comments l
98-4 05/08/98 F
155.2 H
3 SEE BELOW (1) REASON:
(2) METHOD:
A Equiprnent failure (Explain) E. Operator Trainin0/Ucense Emannation 1 Manual
- 4. Conhnuation B. Maintenance or Test F-Admnistrahve
- 2. Manual Trip / Scram
- 5. Other C - Refueling G. Operstkmal Error (Explain) 3 AutomaticTnp/ Scram O. Regulatory Restriction H. Other (Explain)
CAUSE/ CORRECTIVE ACTIONICOMMENTS:
EVENT.90-4 CAUSE; Ughtning strike on step up transformer A - Forced Outage CORRECTIVE ACTION: Place spare transformer inservice. Inspected main generator for insulation degradation.
CRITICAL PATH WAS:
Entered mode 3. Placed spare stepup transformer in service. Initiated reactor startup.
Initiated reactor shutdown to inspect main generator for insulation degradation. Repaired MDAFW Train A miniflow valve and performed operability test. Entered mode 1. Performed at speed turbine test. Continued ramp up. Tied to Grid.
NARRATIVE REPORT May 01,1998 00:00 Unit 2 at 100% power with no operating problems.
May 08,1998 04:00 Unit 2 Reactor Trip / TurbineTrip.
May 09,1998 02:53 Unit 2 Entered Mode 2.
May 09,1998 03:58 Unit 2 Reactor Critical.
May 09,199815:22 Unit 2 Reactor shutdown initiated entered Mode 3.
May 12,199815:28 Unit 2 Entered Mode 2.
May 12,199816:32 Unit 2 Reactor Critical.
May 14,1998 00.03 Unit 2 Power increase stopped due to MDAFW Pump A temp. increase on discharge side.
May 14,199812:01 Unit 2 Cleaned limit switch for miniflow isolation valve. Power increase restarted.
May 14,199812:11 Unit 2 Entered Mode 1.
May 14,199815:13 Unit 2 generator tied to grid.
May 15,199813:14 Unit 2 retumed to 100%
May 31,1998 23:59 Unit 2 at 100% power with no operating problems.
I E2-2 L
L I
l
_ _ _ _ _ _ - _ _ _ _ _ _ _ _