MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 ML20199B6301997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H5991997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216H6071997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Vogtle Electric Generating Plant ML20210K5081997-07-31031 July 1997 Monthly Operating Repts for July 1997 for VEGP ML20140D7301997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Vogtle Electric Generating Plant ML20141D8531997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20137T6191997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Vogtle Electric Generating Plant ML20136G3471997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20134H3481997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20133F6551996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Vogtle Electric Generating Plant,Unit 1 & 2 ML20132B9671996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20134K7361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20128N1541996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20117N1731996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20116J3461996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20115E9821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Vogtle Electric Generating Plant ML20112H6411996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20111B2461996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20101R0251996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Vogtle Electric Generating Plant ML20100R2701996-02-29029 February 1996 Monthly Operating Repts for Feb 1995 for Vogtle Electric Generating Plant ML20100F2071996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20096C3051995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Vogtle Electric Generating Plant,Units 1 & 2 ML20095E0201995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Vogtle Electric Generating Plant ML20094J0741995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Vogtle Electric Generating Plant Units 1 & 2 ML20093F5031995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Vogtle Electric Generating Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20217K8041999-09-30030 September 1999 Rev 1 to Vegp,Unit 2 Cycle 7 Colr ML20217K7741999-09-30030 September 1999 Rev 1 to Vegp,Unit 1 Cycle 9 Colr ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20196F9711999-05-31031 May 1999 Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling Outage ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20206A6561999-04-21021 April 1999 Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20205A9581999-03-31031 March 1999 Rev 0 to VEGP Unit 1 Cycle 9 Colr ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H3951999-02-15015 February 1999 Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20209H4091999-02-15015 February 1999 Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20202H9851999-01-29029 January 1999 Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1 ML20199F8041999-01-13013 January 1999 Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198S1781998-12-31031 December 1998 SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 ML20196E5221998-12-0101 December 1998 Rev 8 to ISI-P-014, ISI Program for VEGP-2 ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20236Q3051998-06-30030 June 1998 Owner'S Rept for ISI for Sixth Maint/Refueling Outage of Vogtle Electric Generating Plant,Unit 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20154Q9721998-04-20020 April 1998 10CFR50.59(B) Rept of Facility Changes,Tests & Experiments for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H7181998-04-0101 April 1998 Corrected Page 5 to 980324 SER Re Relief Requests Associated W/Second 10-year Interval Insp program.RR-21 in Error in That Component,Suction Damper Inadvertently Omitted. Corrected Page 7 of Technical Ltr Rept Also Encl ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217Q1301998-03-31031 March 1998 Rev 0 to Vepc Unit 2 Cycle 7,COLR ML20217B8831998-03-24024 March 1998 SER Accepting Relief Request RR-5,RR-19,RR-20,RR-21,RR-23 & RR-24 for Second 10-yr Interval ISI Program Plan ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H9551998-02-23023 February 1998 SER Denying Quality Assurance Program Description Change for Vogtle Electric Generating Plant,Units 1 & 2 ML20203E4831998-02-11011 February 1998 Rev 1 to Vogtle Electric Generating Plant,Units 1 & 2 Second Ten-Yr Interval Pump Inservice Test Program ML20198T1211998-01-31031 January 1998 Owners Rept for Inservice Inspection for Seventh Maintenance/Refueling Outage ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20199E5431998-01-31031 January 1998 Rev 3 to WCAP-14720, Vogtle Units 1 & 2 Spent Fuel Rack Criticality Analysis W/Credit for Soluble Boron ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203C2811997-12-0909 December 1997 Safety Evaluation Authorizing Request for Relief of Second 10 Yr Interval Inservice Insp Program ML20202B7881997-12-0101 December 1997 Rev 8 to ISI-P-006, ISI Program for Gpc Vogtle Electric Generating Plant Unit 1 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 1999-09-30
[Table view] |
Text
'
e - _t. ,. .
. J. Bernie Beasley, Jr., P.E Southern Nuclear 1 Vice President Operating Company. loc.
. Vogtle Project 40 inverness Center Parkway P0. Box 1295 Birmingham. Alabama 35201 Tel 205.992.7110 Fax 205 992.0403 SOUTHERN COMPANY Energy to Serve Your World**
March 11, 1999 LCV-1306-B i
Docket Nos. 50-424 l 50-425 l
U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - FEBRUARY 1999 Enclosed are the February 1999, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely,
_j l J. B. Bed r.
JBB/JLL L l' Enclosures fL l l
El- VEGP Unit 1 Monthly Operating Report - February 1999 E2- VEGP Unit 2 Monthly Operating Report - February 1999 cc: Southern Nuclear Operating Company Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management i
- U. S. Nuclear Regulatory Commission
- Mr. L. A. Reyes, Regional Administrator Mr. D. Jaffe, Senior Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle 9903170239 990228 61 PDR ADOCK 05000424 6 R PDR lL{ ,
i e
I ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR FEBRUARY 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2 l
l t
. OPERATIN2 DATA REPORT Dock t No.: 50-424_ _
Unit Name: .VEGP UNIT 1 Date: March 2,1999 Completed By: T.S. Hargis__ _
Telephone: _(706) 826-3469 Operating Status
- 1. Reporting Period: February - 1999
~
j
- 2. Design Electrical Rating (Net MWe): 1i69' !
- 3. Maximum Dependable Capacity (Net MWe): 1151 This Month YeatTo Date Cumulative
- 4. Number Of Hours Reactor Was Critical: 647.'i -
1391.7 91,123.7
- 5. Hours Generator On Line: 647.5 1391.5 89,804.7
- 6. Unit Reserve Shutdown Hours: 0.0 0.0 0_1 .
- 7. Net Electrical Energy Generated (MWHe): 732,905 1,615,766 99,295,025 l
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES I Date _ Tag No. ' Event Description N/A N/A N/A l
I I
E1 1
, t . .
l
. UNIT SHUTDOWNS
50-424_ _
Unit Name: VEGP UNIT 1 Date: _M_a_rch 2,1999 Completed By: T.S. Hargis Telephone: (706) 826-3469 Reporting Period: February - 1999 Type Method of F; Forced Duration Shutting Cause/ Corrective Actions No. Date S: WM (Hours) Reason (1) Down (2) Comments j I
99-1 27-Feb-99 S 41 C 2 SEE BELOW l l
(1) REASON: (2) METHOD:
A - Equipment Failure (Erplain) E - Operator Training,ticense Examination 1. Manual 4. Continuaten B - Maintenance or Test F Administratue 2. Manual Trip / Scram 5. Other <
C Refueling G OperstmalError(Explain) 3. Automate Trip / Scram D - Regulatory Restnction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
EVENT _99-1 CAUSE: Scheduled Refueling Outage )
CORRECTIVEACIlON: Routine Outage Maintenance i
CriticalfatttWas; Cooldown to 200 deg. F. RCS Cleanup, and then cooldown to 110 deg. F, Vessel Disassembly follows in which the reactor head and upper intemals are removed. The fuel is then off loaded. After mid-loop maintenance work is complete, the fuel is re-loaded in the vessel and the vessel is re-assembled. Steam Generator #1 & #4 Eddy Current testing runs parallel critical path with the later part of the vessel assembly activities.
NARRATIVE REPORT February 01,1999 00.00 Unit 1 at 100% power with no operating problems.
February 16,1999 00:00 Unit 1 started coast down in preparation for scheduled refueling outage.
February 27,1999 06:45 Unit i started ramp down in preparation for the scheduled refueling outage.
February 27,1999 23:37 Unit 1 was taken off-line for scheduled refueling outage.
February 27,1999 23:40 Unit 1 reactor was manually tripped and entered mode 3.
February 28,199917:51 Unit i entered mode 4.
February 28,1999 23:59 Unit 1 was in mode 4 cooling down for scheduled refueling outage.
E1-2
- .% e e ENCLOSURE 2 q
VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR FEBRUARY 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2
OPERATIN3 DATA REPORT Docktt No.: 50-425 Unit Name: VEGP UNIT 2 1 Data: . March 2,19%
Completed By: T.S. Hargis _ _
Telephone: 1706)826-3469 Operating Status
- 1. Reporting Period: February- 1999
- 2. Design Electrical Rating (Net MWe): 1169,
- 3. Maximum Dependable Capacity (Net MWe): 1154 This Month YeatTo Date Cumulative
- 4. Number Of Hours Reactor Was Critical: 672.0 1416.0 77,654.7
- 5. Hours Generator On Line: 659.4 1402.4 76,912.6
- 6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe): 769,880 1,654,778 85,630,116 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No. Event Description N/A N/A N/A l
E2-1 i
I i
g
- UNIT SHUTDOWNS Dock:t No.: 50-425 ~ ~ ' ~ ~ '
Unit Name: VEGP UNIT 2 Date: March 2.,1999 Completed By: T.S. Hargi_s _ _
-
- Telephone: _(706}826-3469 Reporting Period: February - 1999 Type . Method of F; Forced Duration Shutting Cause/ Corrective Actions No. Date s: scheduied (Hours) Comments Reason (1) Down (2) 99 -1 19-Feb-99 F 40.5 H 5 SEE BELOW (1) REASON: (2) METHOD:
A - Equipment Failure (Explain) E - Operator Training /Ucense Examination 1. Manual 4. Conhnuabon B MaintenanceorTest F Administrahve 2. Manual Trip / Scram 5. Other C Refuehng . - Operabonal Error (Explain) 3. AutomabeTrip/ Scram D Regulatory Restnction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
EVENTL99 - 1 CAUSE: The generator was taken off line and reactor power was reduced to approximately 26% to replace the Stator Cooling strainer. The decision was made by plant managemont to replace the strainer at !
this time since rapid degradation had been observed.
CORRECTIVEACTION: Replacing the strainer and evaluating the condition of the old strainer.
CRITICALPATHWAS; Rep! acing the strainer and evaluating the condition of the old strainer, i
i i
NARRATIVE REPORT _
February 01,1999 00:00 Unit 2 at 100% power with no operating problems.
February 19,199916:29 Unit 2 power reduction initiated to replace stator cooling strainer.
February 19,1999 23:32 Unit 2 generator was taken off-line with reactor power at about 26% to replace strainer.
February 20,199912:07 Unit 2 generator was tied to the grid.
February 21,1999 09:00 Unit 2 was retumed to 100% power.
February 28,1999 23:59 Unit 2 at 100% power with no operating problems.
E2-2