Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With
ML20207K605
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/28/1999
From: Beasley J, Hargis T
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1306-B, NUDOCS 9903170239
Download: ML20207K605 (7)


Text

'

e - _t. ,. .

. J. Bernie Beasley, Jr., P.E Southern Nuclear 1 Vice President Operating Company. loc.

. Vogtle Project 40 inverness Center Parkway P0. Box 1295 Birmingham. Alabama 35201 Tel 205.992.7110 Fax 205 992.0403 SOUTHERN COMPANY Energy to Serve Your World**

March 11, 1999 LCV-1306-B i

Docket Nos. 50-424 l 50-425 l

U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - FEBRUARY 1999 Enclosed are the February 1999, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely,

_j l J. B. Bed r.

JBB/JLL L l' Enclosures fL l l

El- VEGP Unit 1 Monthly Operating Report - February 1999 E2- VEGP Unit 2 Monthly Operating Report - February 1999 cc: Southern Nuclear Operating Company Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management i

- U. S. Nuclear Regulatory Commission

- Mr. L. A. Reyes, Regional Administrator Mr. D. Jaffe, Senior Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle 9903170239 990228 61 PDR ADOCK 05000424 6 R PDR lL{ ,

i e

I ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR FEBRUARY 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2 l

l t

. OPERATIN2 DATA REPORT Dock t No.: 50-424_ _

Unit Name: .VEGP UNIT 1 Date: March 2,1999 Completed By: T.S. Hargis__ _

Telephone: _(706) 826-3469 Operating Status

1. Reporting Period: February - 1999

~

j

2. Design Electrical Rating (Net MWe): 1i69'  !
3. Maximum Dependable Capacity (Net MWe): 1151 This Month YeatTo Date Cumulative
4. Number Of Hours Reactor Was Critical: 647.'i -

1391.7 91,123.7

5. Hours Generator On Line: 647.5 1391.5 89,804.7
6. Unit Reserve Shutdown Hours: 0.0 0.0 0_1 .
7. Net Electrical Energy Generated (MWHe): 732,905 1,615,766 99,295,025 l

CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES I Date _ Tag No. ' Event Description N/A N/A N/A l

I I

E1 1

, t . .

l

. UNIT SHUTDOWNS

  • l Dock;t No.:

50-424_ _

Unit Name: VEGP UNIT 1 Date: _M_a_rch 2,1999 Completed By: T.S. Hargis Telephone: (706) 826-3469 Reporting Period: February - 1999 Type Method of F; Forced Duration Shutting Cause/ Corrective Actions No. Date S: WM (Hours) Reason (1) Down (2) Comments j I

99-1 27-Feb-99 S 41 C 2 SEE BELOW l l

(1) REASON: (2) METHOD:

A - Equipment Failure (Erplain) E - Operator Training,ticense Examination 1. Manual 4. Continuaten B - Maintenance or Test F Administratue 2. Manual Trip / Scram 5. Other <

C Refueling G OperstmalError(Explain) 3. Automate Trip / Scram D - Regulatory Restnction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

EVENT _99-1 CAUSE: Scheduled Refueling Outage )

CORRECTIVEACIlON: Routine Outage Maintenance i

CriticalfatttWas; Cooldown to 200 deg. F. RCS Cleanup, and then cooldown to 110 deg. F, Vessel Disassembly follows in which the reactor head and upper intemals are removed. The fuel is then off loaded. After mid-loop maintenance work is complete, the fuel is re-loaded in the vessel and the vessel is re-assembled. Steam Generator #1 & #4 Eddy Current testing runs parallel critical path with the later part of the vessel assembly activities.

NARRATIVE REPORT February 01,1999 00.00 Unit 1 at 100% power with no operating problems.

February 16,1999 00:00 Unit 1 started coast down in preparation for scheduled refueling outage.

February 27,1999 06:45 Unit i started ramp down in preparation for the scheduled refueling outage.

February 27,1999 23:37 Unit 1 was taken off-line for scheduled refueling outage.

February 27,1999 23:40 Unit 1 reactor was manually tripped and entered mode 3.

February 28,199917:51 Unit i entered mode 4.

February 28,1999 23:59 Unit 1 was in mode 4 cooling down for scheduled refueling outage.

E1-2

.% e e ENCLOSURE 2 q

VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR FEBRUARY 1999 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2

OPERATIN3 DATA REPORT Docktt No.: 50-425 Unit Name: VEGP UNIT 2 1 Data: . March 2,19%

Completed By: T.S. Hargis _ _

Telephone: 1706)826-3469 Operating Status

1. Reporting Period: February- 1999
2. Design Electrical Rating (Net MWe): 1169,
3. Maximum Dependable Capacity (Net MWe): 1154 This Month YeatTo Date Cumulative
4. Number Of Hours Reactor Was Critical: 672.0 1416.0 77,654.7
5. Hours Generator On Line: 659.4 1402.4 76,912.6
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWHe): 769,880 1,654,778 85,630,116 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No. Event Description N/A N/A N/A l

E2-1 i

I i

g

  • UNIT SHUTDOWNS Dock:t No.: 50-425 ~ ~ ' ~ ~ '

Unit Name: VEGP UNIT 2 Date: March 2.,1999 Completed By: T.S. Hargi_s _ _

-

  • Telephone: _(706}826-3469 Reporting Period: February - 1999 Type . Method of F; Forced Duration Shutting Cause/ Corrective Actions No. Date s: scheduied (Hours) Comments Reason (1) Down (2) 99 -1 19-Feb-99 F 40.5 H 5 SEE BELOW (1) REASON: (2) METHOD:

A - Equipment Failure (Explain) E - Operator Training /Ucense Examination 1. Manual 4. Conhnuabon B MaintenanceorTest F Administrahve 2. Manual Trip / Scram 5. Other C Refuehng . - Operabonal Error (Explain) 3. AutomabeTrip/ Scram D Regulatory Restnction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

EVENTL99 - 1 CAUSE: The generator was taken off line and reactor power was reduced to approximately 26% to replace the Stator Cooling strainer. The decision was made by plant managemont to replace the strainer at  !

this time since rapid degradation had been observed.

CORRECTIVEACTION: Replacing the strainer and evaluating the condition of the old strainer.

CRITICALPATHWAS; Rep! acing the strainer and evaluating the condition of the old strainer, i

i i

NARRATIVE REPORT _

February 01,1999 00:00 Unit 2 at 100% power with no operating problems.

February 19,199916:29 Unit 2 power reduction initiated to replace stator cooling strainer.

February 19,1999 23:32 Unit 2 generator was taken off-line with reactor power at about 26% to replace strainer.

February 20,199912:07 Unit 2 generator was tied to the grid.

February 21,1999 09:00 Unit 2 was retumed to 100% power.

February 28,1999 23:59 Unit 2 at 100% power with no operating problems.

E2-2