ML20237D205

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2
ML20237D205
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/31/1998
From: Beasley J, Hargis T
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1169-G, NUDOCS 9808250142
Download: ML20237D205 (7)


Text

_ _ _ _ _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _

South 1rn Nucint Op:rati:g C:mpany,Inc.

Post Office 007.1295 Birmingham, Alabama 352011295 Tel 205992fA00 SOUTHERN h

)

COMPANY Energy to Serve %ur World*

August 14, 1998 LCV-Il69-G Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT-JULY 1998 Enclosed are the July 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

4 Sincerely, 3q

.J. B. Bea ey, J.

1 JBB/BHW

/

Enclosures:

El - VEGP Unit 1 Monthly Operating Report-July 1998

/

E2 - VEGP Unit 2 Monthly Operating Report - July 1998 I

cc: Southern Nuclear Operating Company Mr. J. T. Gasser Mr. M. Sheibani 7t/

SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. D. Jaffe, Senior Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle 9908250142 980731

~

DR ADOCK 03000424 PDR

l 1

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT-UNIT I MONTHLY OPERATING REPORT FOR JULY 1998 TABLE OF CONTENTS Operating Data Report and Challenges to PORV and Safety Valves Page El,

Unit Shutdowns and Narrative Report Page El-2 l

t f

I f

I l

l l

\\

OPERATING DATA REPORT Docktt No.:

5_0-4_24 _

Unit Name:

VEGP UNIT 1 Date:

August 3,1998 Completed By:

T.S. Hargis_

Telephone:

(706)826-3469 Operating. Status

1. Reporting Period:

July-98

2. Design Electrical Rating (Net MWe):

1169_

3. Maximum Dependable Capacity (Net MWe):

1162 This Month Year _ToDate Cumulative

4. Number Of Hours Reactor Was Critical:

744.0 5087.0 86,059.0

5. Hours Generator On Line:

744.0 5065.5 84,740.3

6. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

7. Net Electrical Energy Generated (MWHe):

858,415 5,915,391 93,377,703 l

CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N/A N/A N/A 4

1 E1-1 r

i i

i

UNIT SHUTDOWNS Dockrt No.:

50-424 Unit Namo:

VEGP UNIT 1 Date:

August 3Ti998 I

Completed By:

T.S. Hargis Telephone:

(706)826-3469 Reporting Period:

July-98 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions S: ScheduW No.

Date (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A-Equipment Failure (Explain) E - Operator Training / License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip / Scram 5, Other C Refueling G Operational Error (Explain) 3 AutomaticTrip/ Scram D Regulatory Restncton H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS: N/A NARRATIVE REPORT July 01,1998 00:00 Unit 1 at 100% power with no operating problems.

July 31,1998 23:59 Unit 1 at 100% power with no operating problems.

E1-2 i

1

l l

l l

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT-UNIT 2 MONTiiLY OPERATING REPORT FOR JULY 1998 l

TABLE OF CONTENTS Operating Data Report and Challenges to PORV and Safety Valves Page E2-1 l

Unit Shutdowns and Narrative Report Page E2-2 l

l l

l l

l-j 4

l

=

l OPERATING DATA REPORT l

Dock;t No.:

50-425 _ _.

Unit Name:

VEGP UNIT 2 Date:

Augu_st 3,1998 Completed By:

T.S. Hargis _

Telephone:

_(706) 826-3469 Operating Status

1. Reporting Period:

July-98 l

2. Design Electrical Rating (Net MWe):

116[

3. Maximum Dependable Capacity (Net MWe):
1167, l

This Month

. Year.Io Date Cumulative

4. Number Of Hours Reactor Was Critical:

744.0 3798.8 72,622.6

5. Hours Generator On Line:

744.0 3752.5 71,911.7

6. Unit Reserve Shutdown Hours:

0.0 0.0 0.0 l

7. Net Electrical Energy Generated (MWHe):

854,356 4,206,103 79,792,829 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description l

N/A N/A N/A

)

l E2-1 l

UNIT SHUTDOWNS Dockst No.:

50-425 Unit Nims:

VEGP UNIT 2

~

~

Date:

hugustfi998

~.S.Rargis._ _

Completed By:

T Telephone:

_(706) 826-3469 Reporting Period:

. July-98 Type Method of F: Forced Duration

. Shutting Cause/ Corrective Actions l

No.

Date 8 **

(Hours)

Reason (1)

Down (2)

Comments l

l N/A N/A N/A N/A

-N/A N/A N/A l

(1) REASON:

(2) METHOD:

A - Equipment Failure (Explain) E - Operator Training /Ucense Examination t Manual

4. Continuabon B Maintenance or Test F-Administrative
2. Manual Trip / Scram
5. Other C - Refuehng G Operational Error (Explain)
3. Automaticinp/ Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS: N/A l

l NARRATIVE REPORT July 01,1998 00:00 Unit 2 at 100% power with no operating problems.

July 18,1998 00:59 Unit 2 Planned pou, reduction initiated to perform maintenance on Main Feedwater Pump.

July 19,1998 04:00 Unit 2 Returned to 100% power after planned maintenance reduction.

July 31,1998 23:59 Unit 2 at 100% power with no operating problems.