ML20237D205
| ML20237D205 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/31/1998 |
| From: | Beasley J, Hargis T SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LCV-1169-G, NUDOCS 9808250142 | |
| Download: ML20237D205 (7) | |
Text
_ _ _ _ _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _
South 1rn Nucint Op:rati:g C:mpany,Inc.
Post Office 007.1295 Birmingham, Alabama 352011295 Tel 205992fA00 SOUTHERN h
)
COMPANY Energy to Serve %ur World*
August 14, 1998 LCV-Il69-G Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT-JULY 1998 Enclosed are the July 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
4 Sincerely, 3q
.J. B. Bea ey, J.
1 JBB/BHW
/
Enclosures:
El - VEGP Unit 1 Monthly Operating Report-July 1998
/
E2 - VEGP Unit 2 Monthly Operating Report - July 1998 I
cc: Southern Nuclear Operating Company Mr. J. T. Gasser Mr. M. Sheibani 7t/
SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. D. Jaffe, Senior Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle 9908250142 980731
~
DR ADOCK 03000424 PDR
l 1
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT-UNIT I MONTHLY OPERATING REPORT FOR JULY 1998 TABLE OF CONTENTS Operating Data Report and Challenges to PORV and Safety Valves Page El,
Unit Shutdowns and Narrative Report Page El-2 l
t f
I f
I l
l l
\\
OPERATING DATA REPORT Docktt No.:
5_0-4_24 _
Unit Name:
VEGP UNIT 1 Date:
August 3,1998 Completed By:
T.S. Hargis_
Telephone:
(706)826-3469 Operating. Status
- 1. Reporting Period:
July-98
- 2. Design Electrical Rating (Net MWe):
1169_
- 3. Maximum Dependable Capacity (Net MWe):
1162 This Month Year _ToDate Cumulative
- 4. Number Of Hours Reactor Was Critical:
744.0 5087.0 86,059.0
- 5. Hours Generator On Line:
744.0 5065.5 84,740.3
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
858,415 5,915,391 93,377,703 l
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description N/A N/A N/A 4
1 E1-1 r
i i
i
UNIT SHUTDOWNS Dockrt No.:
50-424 Unit Namo:
VEGP UNIT 1 Date:
August 3Ti998 I
Completed By:
T.S. Hargis Telephone:
(706)826-3469 Reporting Period:
July-98 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions S: ScheduW No.
Date (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A-Equipment Failure (Explain) E - Operator Training / License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative
- 2. Manual Trip / Scram 5, Other C Refueling G Operational Error (Explain) 3 AutomaticTrip/ Scram D Regulatory Restncton H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS: N/A NARRATIVE REPORT July 01,1998 00:00 Unit 1 at 100% power with no operating problems.
July 31,1998 23:59 Unit 1 at 100% power with no operating problems.
E1-2 i
1
l l
l l
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT-UNIT 2 MONTiiLY OPERATING REPORT FOR JULY 1998 l
TABLE OF CONTENTS Operating Data Report and Challenges to PORV and Safety Valves Page E2-1 l
Unit Shutdowns and Narrative Report Page E2-2 l
l l
l l
l-j 4
l
=
l OPERATING DATA REPORT l
Dock;t No.:
50-425 _ _.
Unit Name:
VEGP UNIT 2 Date:
Augu_st 3,1998 Completed By:
T.S. Hargis _
Telephone:
_(706) 826-3469 Operating Status
- 1. Reporting Period:
July-98 l
- 2. Design Electrical Rating (Net MWe):
116[
- 3. Maximum Dependable Capacity (Net MWe):
- 1167, l
This Month
. Year.Io Date Cumulative
- 4. Number Of Hours Reactor Was Critical:
744.0 3798.8 72,622.6
- 5. Hours Generator On Line:
744.0 3752.5 71,911.7
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0 l
- 7. Net Electrical Energy Generated (MWHe):
854,356 4,206,103 79,792,829 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description l
N/A N/A N/A
)
l E2-1 l
UNIT SHUTDOWNS Dockst No.:
50-425 Unit Nims:
VEGP UNIT 2
~
~
Date:
hugustfi998
~.S.Rargis._ _
Completed By:
T Telephone:
_(706) 826-3469 Reporting Period:
. July-98 Type Method of F: Forced Duration
. Shutting Cause/ Corrective Actions l
No.
Date 8 **
(Hours)
Reason (1)
Down (2)
Comments l
l N/A N/A N/A N/A
-N/A N/A N/A l
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain) E - Operator Training /Ucense Examination t Manual
- 4. Continuabon B Maintenance or Test F-Administrative
- 2. Manual Trip / Scram
- 5. Other C - Refuehng G Operational Error (Explain)
- 3. Automaticinp/ Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS: N/A l
l NARRATIVE REPORT July 01,1998 00:00 Unit 2 at 100% power with no operating problems.
July 18,1998 00:59 Unit 2 Planned pou, reduction initiated to perform maintenance on Main Feedwater Pump.
July 19,1998 04:00 Unit 2 Returned to 100% power after planned maintenance reduction.
July 31,1998 23:59 Unit 2 at 100% power with no operating problems.