l J. D.Woodard Southern Nuclear Exccutive Vice President Operating Company. loc.
40 invemess Center Parkway l
Post Office Box 1295 Birminghem. Alabama 35201 Tel 205.992.5080 SOUTHERN h COMPANY Energy to Serve nurWorld" May 11, 1998 LCV-1169-D Docket Nos.
50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT-APRIL 1998 Enclosed are the April 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical j
Specification 5.6.4.
{
Sincerely, k
(
J.
Woodard CKM/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - April 1998 E2-VEGP Unit 2 Monthly Operating Report - April 1998 cc:
Southern Nuclear Onerating Comnany Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS
... [, Oi 3 U. S. Nuclear Reculatory Commission Mr. L. A. Reyes, Regional Administrator Mr. D. Jaffe, Senior Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle l
b
!,/
l 9005190318 990430 L
DR ADOCK O 4y4
l-
. i L
1' ENCLOSURE 1
[
VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTiiLY OPERATING REPORT FOR APRIL 1998 TABLE OF CONTENTS I
OPERATING DATA REPORT and CilALLENGES to PORV and SAFETY VALVES Page El-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page El-2 4
f' L
l L.-.~--.--..-__---
- OPERATIN3 DATA REPORT Dicket No.:
50-424 Unit Name:
VEGP UNIT 1 Date:
May 4,1998 Completed By:
T.S. Hargis Telephone:
(706)826-3469 Opatating. Status
- 1. Reporting Period:
Apr-98
- 2. Design Electrical Rating (Net MWe):
1169
- 3. Maximum Dependable Capacity (Net MWe):
1162 This Month Year To Date Cumulative
- 4. Number Of Hours Reactor Was Critical:
719.0 2879.0 83,851.0
- 5. Hours Generator On Line:
719.0 2879.0 82,553.8
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe);
843.831 3.398,911 90,861,223 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAJETY VALVES Date Tag No.
Event Description N/A N/A N/A l
i E1-1 l
l
' UNIT SHUTDOWNS Docket No.:
50-424 Unit Name:
VEGP UNIT 1 Date:
May 4,1998 Completed By:
T.S. Hargis Telephone:
(706)826-3469 Reporting Period:
Apr-98 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions
{
S: Scheduled No.
Date (Hours)
Reason (1)
Down (2)
Comments NA NA NA NA NA NA NA (1) REASON:
(2) METHOD:
A - Equipmert Failure (Explain) E - Operator Training /Ucense Examination
- 1. Manual
- 4. Continuation B Maintenance or Test F-Adrrunistrative
- 2. Manual Trip / Scram
- 5. Other C - Refueling G - Operational Error (Explain)
- 3. AutomaticTrip/ Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
NARRATIVE REPORT March 0100:00 Unit 1 at 100% power with no operating problems.
March 3123:59 Unit 1 at 100% power with no operating problems.
l l
E1-2
l
- /
l..
n o
L i
l ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT-UNIT 2 MONTHLY OPERATING REPORT FOR APRIL 1998 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES
. Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 L
l k
l t
I
._----a
l,*
OPERATIN3 DATA REPORT Docket No.:
50-425 Unit Name:
VEGP UNIT 2 l
Date:
May 4,1998 Completed By:
T.S. Hargis Telephone:
(706) 826-3469 OperatingEtatus -
- 1. Reporting Period:
Apr-98
- 2. Design Electrical Rating (Net MWe):
1169
- 3. Maximum Dependable Capacity (Net MWe)'.
1167 This Month Year To Date Cumulative
- 4. Number Of Hours Reactor Was Critical:
281.4 1865.8 70.689.6
- 5. Ho. '. Generator On Line:
254.9 1838.9 69.998.2
- 6. Una Heserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
243,439 2,036,632 77.623,358
{
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description l
NA NA NA I
i I
E2-1 l
}
UNIT SHUTDOWNS Docket Nz.:
50-425 Unit Name:
VEGP UNIT 2 l'
Date:
May 4.1998 1
)
Completed By:
T.S. Hargis Telephone:
(706)826-3469 l
Reporting Period:
Apr-98 t
I Type Method of F: Forced Duration Shutting Cause/ Corrective Actions s: scheduled No. '
Date (Hours)
Reason (1)
Down (2)
Comments 98-1 3/8 S
457.5 C
4 SEE BELOW 98-2 4/20 S
5.1 B
1 SEE BELOW 98-3 4/21 F
15 B
1 SEE BELOW (in REASON:
(2) METHOD:
j A - Equipment Failure (Erplein) E - Operator Training 4.icense Examination
- 1. Manual
- 4. Continuation B -Maintenance or Test F - Admin 6strative
- 2. Manual Trip / Scram
- 5. Other C - Refueling G -Operational Error (Explain)
- 3. Automatic Trip / Scram D Regulatory Restriction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
EVENT 98-1 CAUSE.
Scheduled Refueling Outage CORRECTIVE ACTION:
Guide Tube Support Pin Replacement.
J CRITICAL PATH WAS:
Completed S/G Eddy Current Testing on 2 & 3. Reloaded fuel, installed upper intemals and reinstalled reactor vessel head. Tensioned head and completed reassembly. Began heatup and mode ascension from mode 5 to mode 1. Performed appropriate functional testing in each mode, raised power after entering mode 1, and closed breaker.
EVENT 98-2 CAUSE.
Turbine Overspeed Trip Test CORRECTIVE ACTION:
Turbine test completed and unit retumed to service.
EVENT 98-3 CAUSE.
Repair ground in voltage regulator CORRECTIVE ACTION:
Ground repaired and unit retumed to service.
NARRATIVE REPORT April 01 00:00 Unit 2 defueled April 08 04:01 Unit 2 entered mode 6.
April 14 04:21 Unit 2 entered mode 5.
April 1615:11 Unit 2 entered mode 4.
April 17 05:20 Unit 2 entered mode 3.
April 19 03:00 Unit 2 entered mode 2.
April 19 06:34 Unit 2 reactor critical.
April 19 22:56 Unit 2 entered mode 1.
April 20 02:29 Unit 2 generator tied to grid.
April 20 14:37 Unit 2 turNne tripped for overspeed test.
April 2019:41 Unit 2 generatortied to grid.
f April 21 17:03 Unit 2 turbine tripped to take generator offline to repair ground in voltage regulator.
April 21 18:33 Unit 2 generator tied to grid.
r f
April 25 06:32 Unit 2 retumed to 100%.
April 30 23 59 Unit 2 at 100% cower with no operatino problems l
E2-2