Interim Deficiency Rept Re Lack of Procedural Qualification for Pipe Bends.Initially Reported on 821109.Post- Qualification Program for Small Bore Pipe Bending Operations Being Conducted.To date,24 of 35 Tests Completed
ML20023D956
Person / Time
Site: Zimmer
Issue date: 05/25/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0033, LOZ-83-33, NUDOCS 8306060197
Download: ML20023D956 (2)


Text

_--

.. - :.: y.::.m: ,

THE CINCINNATI GAS & ELECTRIC COMPANY eE CINCIN N AT1. OHIO 4 5201 May 25, 1983 LOZ-83-0033 J. WILLI AM S. J R schson vics enssiotNT NUCLEAR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J.G. Keppler Regional Administrator Gentlemen:

RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50. 5 5 (e) , ITEM M-67, LACK OF PROCEDURAL QUALIFICATION FOR PIPE BENDS W.O. 57300, JOB E-5590, FILE NO. 956 C, M-67 This letter constitutes an interim report concerning the subject condition, initially reported to the Commission on November 9, 1982, as a potentially reportable deficiency under the requirements of 10CFR50.55 (e) .

A post qualification program for small bore pipe bending operations is being conducted under NRC approved Construction Work Authorization Request (CWAR) #71. To date, twenty-four (24) of thirty-five (35) qualification tests have been completed. The remaining eleven (11) tests will be completed upon receipt of the test material. Analysis to determine the acceptability of the pipe bend qualification tests and any corrective action needed will be performed by The Cincinnati Gas & Electric Company, H. J.

Kaiser Company, and Sargent & Lundy Engineers. A follow-up report will be submitted by August 10, 1983.

8306060197 830525 DRADOCK05000g A04Y 311983 , g- '

,A

Mr. J.G. Keppler Regional Administrator May 25, 1983 LOZ-83-0033 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By j ? g h ;_ m J. WILLIAMS, JHf.

SENIOR VICE PRE IDENT cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Senior Resident Inspector ATTN: W.F. Christianson NRC Zimmer Project Inspector, Region III ATTN: E. R. Schweibinz