ML19269C679
ML19269C679 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 01/03/1979 |
From: | Corbin T AFFILIATION NOT ASSIGNED |
To: | NRC OFFICE OF THE SECRETARY (SECY) |
Shared Package | |
ML19269C677 | List: |
References | |
NUDOCS 7902120070 | |
Download: ML19269C679 (1) | |
Similar Documents at Braidwood | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P6171999-10-21021 October 1999
[Table view]Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217G9791999-10-14014 October 1999 Forwards SE Accepting Relief Requests to Rev 5 of First 10-year Interval Inservice Insp Program for Plant,Units 1 & 2 ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20217A9311999-09-29029 September 1999 Informs That NRC 6-month Review of Braidwood Identified That Performance in Maint Area Warranted Increased NRC Attention. Addl Insps Beyond Core Insp Program Will Be Conducted Over Next 6 Months to Better Understand Causes of Problem ML20216H4301999-09-23023 September 1999 Informs That Arrangements Made for Administration of Licensing re-take Exams at Braidwood Generating Station for Week of 991108 ML20216F7441999-09-17017 September 1999 Forwards Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824.Three Violations Noted & Being Treated as Ncvs. Insp Focused on C/As & Activities Addressing Technical Concerns Identified During Design Insp Completed on 980424 ML20212A6991999-09-10010 September 1999 Forwards SE Accepting Licensee Second 10-year Interval ISI Program Request for Relief 12R-07 for Plant,Units 1 & 2 ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211Q6611999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Braidwood Operator License Applicants During Wk of 010115 & 22.Validation of Exam Will Occur at Station During Wk of 001218 ML20211P1901999-09-0303 September 1999 Forwards Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20211P1761999-09-0202 September 1999 Discusses Licensee Aug 1998 Rev 3K to Portions of Braidwood Nuclear Power Station Generating Stations Emergency Plan Site Annex Submitted Under Provisions of 10CFR50.54(q). NRC Approval Not Required ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210U8031999-08-0404 August 1999 Forwards SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval for Second 10-year Inservice Testing Program BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K9761999-07-30030 July 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs, for Plant ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210G6291999-07-29029 July 1999 Forwards Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20210C3961999-07-20020 July 1999 Forwards Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Weakness Identified on 990523,when Station Supervisors Identified Individual Sleeping in Cable Tray in RCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl IR 05000456/19993011999-07-15015 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301OL & 50-457/99-301OL for Test Administered from 990607-11 to Applicants for Operating Licenses.Three Out of Four Applicants Passed Exams BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted ML20209H5141999-07-14014 July 1999 Discusses 990701 Telcon Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Braidwood Nuclear Generating Station for Week of 990927,which Coincides with Licensee Regularly Scheduled Exam Cycle ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196H0631999-06-28028 June 1999 Provides Individual Exam Results for Licensee Applicants Who Took June 1999 Initial License Exam.Without Encls ML20212H8241999-06-24024 June 1999 Informs That Effective 990531 NRC Project Mgt Responsibility for Byron & Braidwood Stations Was Transferred to Gf Dick ML20196D4591999-06-18018 June 1999 Forwards Insp Repts 50-456/99-07 & 50-457/99-07 on 990414- 0524.No Violations Noted.Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20196A6671999-06-17017 June 1999 Refers to 990609 Meeting with Util in Braidwood,Il Re Licensee Initiatives in Risk Area & to Establish Dialog Between SRAs & Licensee PRA Staff 05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below1999-06-16016 June 1999 Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below 05000456/LER-1998-004, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations1999-06-16016 June 1999 Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed1999-06-15015 June 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed ML20195J3741999-06-14014 June 1999 Forwards Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted.Sg Insp Program Found to Be Thorough & Conservative BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.51999-06-10010 June 1999 Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 ML20195F3231999-06-0909 June 1999 Informs That in ,Arrangements Finalized for Exam to Be Administered at Plant During Wk of 990607.All Parts of Plant Initial Licensed Operator Exam Approved for Administration 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML20217P6171999-10-21021 October 1999
[Table view]Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes 05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below1999-06-16016 June 1999 Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below 05000456/LER-1998-004, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations1999-06-16016 June 1999 Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed1999-06-15015 June 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.51999-06-10010 June 1999 Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs 05000457/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed1999-05-21021 May 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20206T3351999-05-17017 May 1999 Provides Written follow-up of Request for NOED Re Extension of Shutdown Requirement of TS Limiting Condition for Operation 3.0.3.Page 9 of 9 of Incoming Submittal Not Included ML20206N7861999-05-14014 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Braidwood Station. Rept Contains Info Associated with Stations Radiological Environ & Meteorological Monitoring Programs ML20206Q8521999-05-13013 May 1999 Submits Rept on Numbers of Tubes Plugged or Repaired During SG Inservice Insp Activities Conducted During Plant Seventh Refueling outage,A2R07,per TS 5.6.9 ML20210C7221999-05-0303 May 1999 Forwards Initial License Exam Matls for Review & Approval. Exam Scheduled for Wk of 990607 ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206E3991999-04-29029 April 1999 Forwards 1998 Annual Environ Operating Rept & Listed Attachments Included in Rept.Without Encls ML20206C7901999-04-23023 April 1999 Provides Suppl Info Re Use of W Dynamic Rod Worth Measurement Technique,As Requested During 990413 Telcon.Rev Bars in right-hand Margin Identify Changes from Info Submitted by ML20206B3941999-04-21021 April 1999 Forwards Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors, for Byron & Braidwood Stations.Updated Info Re PCT for Limiting Small Break & Large Break LOCA Analysis Evaluations & Detailed Description of Errors ML20205S9621999-04-20020 April 1999 Responds to 981203 RAI Telcon Re SG Tube Rupture Analysis for Byron Station,Unit 2 & Braidwood Station,Unit 2.Addl Info & Subsequent Resolution of Issues Discussed During 990211 Telcon Are Documented in Encl ML20206B0821999-04-20020 April 1999 Requests to Reschedule Breaker Maint Insp for Either Wk of 990607 or One of Last Two Wks in Jul 1999,in Order to Better Accommodate Insp Activity ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20206B0251999-04-14014 April 1999 Forwards Reg Guide 1.16 Rept for Number of Personnel & Person-Rem by Work Job Function for 1998. Associated Collective Deep Dose Equivalent Reported According to Work & Job Functions ML20205K3581999-04-0606 April 1999 Submits Request to Reschedule Breaker Maint Insp for Braidwood Nuclear Power Station for Either Wk of 990607 or One of Last Two Wks in Jul 1999 ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20210C7181999-03-30030 March 1999 Forwards Integrated Exam Outline Which Plant Submitting for Review,Comment & Approval for Initial License Exam Scheduled for Wk of 990607 ML20205E6401999-03-26026 March 1999 Forwards Proprietary Ltr Re Notification of Corrected Dose Rept for One Individual,Per 1997 Annual Dose Repts for All Comed Nuclear Power Facilities,Submitted 970430.Proprietary Info Withheld ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util ML20207J4321999-03-0808 March 1999 Forwards Braidwood Station ISI Outage Rept for A1R07, Per Requirements of ASME Section Xi,Article IWA-6200 ML20205C6861999-03-0404 March 1999 Provides Notification That Byron Station Implemented ITS on 990205 & Braidwood Station Implemented ITS on 990219 1999-09-08 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20245D6611988-08-0808 August 1988
[Table view]Submits Listed Comments in Response to Re Safety Practice to Schedule Nuclear Plant Operating & Maint Personnel for 16 H Shifts &/Or Excessive Overtime ML20155B6651988-06-16016 June 1988 FOIA Request for plant-specific Documents Re Fire Protection Requirements,Insp repts,hardware-specific Deficiencies & NRC Communications W/Util ML20236E6951987-07-20020 July 1987 Forwards Corrected Certificate of Svc of Appeal from Licensing Board Denial of Motion to Reopen Record Filed on 870720.Certificate Filed W/Appeal Mistakenly Read 870620. Correct Date of 870717 Reflected in Encl Certificate of Svc ML20235L7061987-07-0808 July 1987 Opposes Util Application for Amends to Licenses,Allowing New Ownership & Financing Arrangement.Nshc Should Not Be Made W/O Public Hearings on Serious Financial Qualifications Questions ML20215L4871987-06-23023 June 1987 Urges NRC Not to Approve Comm Ed Request for Amend of Any OL Re Braidwood 1 & 2 & Not to Determine No Significant Hazard Exists W/O First Holding Adjudicatory Hearings on Serious Financial Qualifications Issues ML20215L5051987-06-23023 June 1987 Provides Brief Updated Rept on Status of Comm Ed Proposal Before State of Il Commerce Commission to Restructure Ownership & Other Financial Arrangements Re Facilities.Urges NRC Not to Make Finding Prior to Hearing ML20209H4831987-02-0303 February 1987 Forwards Proposed Findings of Fact,Brief of Intervenors, Intervenors Motion for Extension of Page Limit for Brief & Notice of Appearance of Rl Jones ML20212M9351987-01-0505 January 1987 FOIA Request for Listed Documents,Including SECY-86-292/292A & 861107 Orders Approved by Commission Re Plant ML20207C6151986-12-19019 December 1986 Forwards Intervenors Exhibit 98,Comstock 1,215 Weld Insp Checklist & Related Documents.Documents Admitted as Intervenor Exhibits on 860827 ML20214W2841986-12-0404 December 1986 Transmits Intervenors Exhibits Identified or Received During 861203-04 Telcons to Court Reporter for Filing in Proceeding & Transmits Intervenors Exhibit 285 to Board ML20213F6571986-11-0808 November 1986 Advises of Mutual Agreement Between Applicant & Case for Further Extension Until 861122 to File Motions Re Applicant Responses to Case First Through Fifth Sets of Interrogatories Re Credibility.Related Correspondence ML20215K2791986-09-0404 September 1986 FOIA Request for Six Categories of Documents Re 1982 Civil Penalty & Ofcs of Investigations & Inspector & Auditor Investigations of Listed Facilities ML20210L4421986-04-25025 April 1986 Forwards Prefiled Direct Testimony & Prepared Exhibit of Dr Ilgen on Behalf of Intervenors Re QC Inspector Harassment Contention.Related Correspondence ML20155F5781986-04-18018 April 1986 Confirms 860417 Agreement by Parties Re Extension of Time for Intervenors to File Direct Testimony.Intervenors Intend to Present Testimony from Subpoened Witnesses on 860228 Ga List.Related Correspondence ML20203B3591986-04-15015 April 1986 Transmits Stated Documents Not Previously Filed as Noted in 860403 Brief of Intervenors Rorem,Et Al,On Admissibility of Late Filed Amended Contention.W/O Encls.Related Correspondence ML20202G5081986-04-0909 April 1986 Forwards Fully Executed Returns of Svc for Subpoena Previously Issued for Deposition of RM Saklak.Related Correspondence ML20155A6641986-04-0303 April 1986 Forwards Rorem Et Al 860403 Brief Re Admissibility of late-filed Amended QA Contention & Exhibits,Including Documents Submitted in Camera in Sealed Envelopes ML20155A6581986-04-0303 April 1986 Forwards Transmittal Ltr to Commissioners,Rorem Et Al 860403 Brief Re Admissibility of late-filed Amended QA Contention, Exhibits & Certificate of Svc ML20154K9581986-03-0303 March 1986 Forwards Application for Deposition Subpoena for RM Saklak 860326 Appearance & Schedule of Documents to Be Produced, for Approval.Discovery Depositions to Continue Through 860404.Related Correspondence ML20153D8201986-02-18018 February 1986 Forwards Intervenor Rorem Answer Opposing Applicant Motion for Summary Disposition.Several Depositions Taken in Proceeding Being Forwarded to ASLB Under Separate Cover ML20138M5341985-12-18018 December 1985 Forwards Intervenors Response to Commission Questions Re Util 850923 Petition Seeking Exemption from Rules of Practice & Review of ASLB Decision Denying Request for Directed Certification ML20199F2491985-11-21021 November 1985 FOIA Request for Documents Re Insp Repts 50-456/85-21 & 50-457/85-22 on Investigation of Harassment & Intimidation Allegations by Comstock QC Inspectors ML20136F7591985-10-10010 October 1985 FOIA Request for All Records & Info Re Insp Repts 50-456/80-04 & 50-457/80-04 Issued on 800610 ML20133G9751985-10-0808 October 1985 Requests That Applicant Motion to Restrict Meaning of Contention 1(a) Be Denied.Language of Contention Should Be Evaluated on Basis of 10CFR50.47(a)(1) ML20133F7661985-10-0707 October 1985 Forwards Intervenors Answer Opposing Petitions by Comm Ed for Waiver of NRC Regulation & for Review of ASLAP Decision, Consisting of 10-page Brief W/One Attachment ML20126K9591985-07-24024 July 1985 Forwards Executed Joint Stipulation Re Agreement to Admit QC Inspector Harassment Contention for Litigation & Revised Contention as Admitted by ASLB at 850723 Prehearing Conference ML20128F5091985-07-0202 July 1985 Requests Reconsideration of Decision Not to Supply Specifics Re Claims of Intimidation & Harassment of Lk Comstock QC Inspectors.Certificate of Svc Encl.Related Correspondence ML20136G5801985-06-19019 June 1985 FOIA Request for Documents Re Facility IE Rept 83-09 ML20128N6731985-05-29029 May 1985 Forwards Exhibits to Intervenor Motion to File Amended QA Contention ML20102A7731985-02-0404 February 1985 Requests Svc of 850110 Order & Instruction to Appropriate Clerical or Docketing Personnel Indicating That Svc of All Papers in Case Should Be Directed to D Cassel & Tw Wright ML20093M7721984-10-17017 October 1984 Requests Telcon W/Parties to Establish Hearing Schedule. W/Notice of Appearance,Notice of Withdrawal of Jm Wicher as Counsel & Svc List ML20092P2471984-07-0202 July 1984 Requests That Util 840627 Pleading Be Held in Abeyance Until More Info Known About Author Participation in Hearings. Related Correspondence ML20087C4191984-03-0707 March 1984 Comments on Des (NUREG-1026) for Facility.Des Does Not Completely Describe Fuel Cycle Impact & Should Contain Statement Re Range of Nonfatal Cancer Injuries & Birth Defects Induced by Fuel Cycle Rn-222 ML20010B2601981-08-0707 August 1981 Opposes Applicant 810729 Motion for Protective Order Re Controversial Interrogatories Remaining in Sixth Set of Interrogatories ML20150F2741979-08-19019 August 1979 Urges NRC to Deny Util License to Build two-unit Power Plant in Braidwood,Il ML19242D4711979-07-0505 July 1979 Expresses Concern Re Cement Pouring Problems at Facility. Suggests Complete Investigation ML19263E2651979-04-0606 April 1979 Requests Clarification of Procedures Necessary to Be Accepted as Petitioner at Prehearing Conference ML19276F2051979-03-0707 March 1979 Requests Copy of Proposed Operating License ML19282B5931979-02-0303 February 1979 Forwards Proof of Svc for Intervention Petition,& Affidavit of Membership & Authorization.Certificate of Svc Encl ML19282B1181979-01-30030 January 1979 Ack Receipt of Petitions to Intervene in Operating License Proceeding & Notice of ASLB Establishment of Rule on Petitions to Intervene.Requests Response to Petitions ML19263B9641979-01-10010 January 1979 Seeks to File Petition to Intervene.Objects to Const of Facility,Alleging That an Accident Could Result in Release of Radioactive Matls ML19263B6481979-01-0303 January 1979 Requests Denial of OL for Facility Which Is Being Built on Author'S Land,Since Water Supply Is Threatened,Land Is Raped & Facility Product Is Poisonous Pu ML19269C6791979-01-0303 January 1979 Requests Operating License for Facility Be Denied ML19261B1551979-01-0202 January 1979 Protests Licensing & Resultant Land & Wildlife Disturbances. Expresses Concern Re Impact on Local Well Water & Potential Hazards of Cooling Pool ML19263B5181979-01-0202 January 1979 Protests Licensing of Generating Station.Objects to Seepage Shallow Wells & Sandpoints,Destruction of Trees & Wildlife, Storage of Spent Fuel Rods on Site & Fog 1988-08-08 |
Text
..
< o Wilmington, Ill.
~ ~ ' i' W p
~
3',h ,. fg2 4ffg4/f7 .-$ .[. . fl E. R-2 Box IIT
, . . /,ac% k 6048I ~
9g )@ .4
.6 . -
, o
. ?i T A$
secre tary of the Conmiss'icn '
O 5 '
Docketing & Service Branchq { , YI ,
N Washington, D. C.
$1 5
v e l[ D 00
~
~
J
Dear Sirs:
C3e t h J $O Uh t l-
- . -- M - C '-; . _ .:7-- r'- Q L4 . .$;.tW; ' h+. T. l % - '-' * &L P
~
_,1
- .I am vriting 'to request that the.: Operating License for the _ _~ _ .
Braidwood Commonwealthb
' J .home is. located. 3dison.Juclear Power Plant .be . denied. Our
, .. .... ; ed0 : borders the wholeDacki.o.f sour ifarm.' mne:fromjthesplantiand the lake (when
- t; - r iWe-feer fori.our lives 9 g_ W M more .everyfday.3ha-t fttMEiw6gkW6^6re'sse'sMCommr i ealtf Edison JhasW%
. taken by ~ Condemna(ion ,so.pnuch.30f cur. property, they -have Taped Ahe t.;,.2
~ it beautMulbarren.
3rees '.'and;soi'1hhi'5h cprotected so much . wildlife and left
<0ur' vater'. su'pbly.is .; threatened. by seepage from the dike, which they_ admit will'ileak, .in their environmental. statement.
Commonwealth Edison has already starting checking the Dairy Herd near us.
ous leaks, I they am certain they will never tell us if they have danger-have lied about so many they have had at.Dresden Plant, stating they were.not dangerous, m;y amount of radiation is ' dangerous (statement from International conmission on Radiolo-gical Pro'tection)"there is no holly safe dose of radiation".
~ .
~.
s <When-I walk on my farm, I am confronted with a 6' high, chain link fence they have erected.
For so many years, every day my far;ily and I walked the beautiful hills and watched the wildlife everywhere. ~I raised three sons and taught the= not to hunt or till, or -to do anything to destroy the things god has given us.
F.y husband'has never hunted these grounds, only loving and respect-
'_' ing all the living things. They are all gone now, nothing but
' barren soil, no deer tfacks , nothing. The frustratir; is causing my health'to deteriorate.
farm. Our children were born < M raised on bur -
We are sick that-something like this could happen.
The . product which such a plant can produce (Pluteinm) is so deadly, and no one knows what to do with it. The impact of this can made element on society is unreal. The Nuclear Energy Oc=mision e
knows it causes cancer and lukemia'. I also do not feel I should be forced to pay to guard pomething so deadly which is now stored
~
by
' dollars.the tons so near us and. the surronding towns.., 3'isinpour-Sta= .. , .
to add more is unthinkable.;This area has
- 5,~G,.all the. ') pdumping0 gro
- p. Someone;.somewhere,some, time has got to startuth1 m ng-about pre se r.ve .
savingwhatGodhasgigen,uswdwhatwehaveworkedg{oha
.? lease le Tt Se' {cu. -- ,
.e , 2 .q.g
- , {ij--.' .'y
~
~ '
-Y * .g p -
-~.6. -
~ Sincerely'Yourr, ,4
-.yfi.eNm.' F, h . ik E/
Ik' - + -
. H ,x J 7 9 0 212Q Q fa / p M /*-