Interim Deficiency Rept,Item S-11 Re High Strength Bolting of Structural Steel Connections.Initially Reported on 830513.Formal Submittal of Quality Confirmation Program Will Be Made by 831101
ML20080H157
Person / Time
Site: Zimmer
Issue date: 09/15/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOL-83-152, LOZ-83-0152, LOZ-83-152, NUDOCS 8309210163
Download: ML20080H157 (2)


Text

_ _ _ _ _ _ _ _ .

l THE CINCINNATI GAS & ELECTRIC COM PANY cTI=

CINCINN ATI. OHIO 45201 September 15, 1983 LOZ-83-0152 J. WILLI AM S, J R stNeon vict parSioENT huCLE AN OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J.G. Keppler Regional Administrator Gentlemen:

RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50. 55 (e) ITEM S-ll, STRUCTURAL STEEL BOLTING W.O. 57300, JOB E-5590, FILE NO. 956C, S-ll This letter consititues an interim report concerning the subject condition initially reported to the Commission on May 13, 1983 as a potentially reportable deficiency under the requirements of 10CFR50.55 (e) and provides the status of the actions being taken to resolve the deficiency. Based on a telephone conversation between E.R. Schweibinz (NRC) and G.C.

Ficke (CG&E), it was agreed that an extension would be granted for the submittal of this report f rom September 12, 1983 to September 15, 1983.

Our previous interim report, LOZ-83-0046, dated June 10, 1983, identified the potential deficiencies related to high strength bolting of structural steel connections and stated that the Quality Confirmation Program (QCP) had been expanded to resolve these concerns. The program for reinspection and rework of structural steel high strength bolting was presented during an August 11, 1983 meeting between CG&E and the NRC.

Formal submittal of the above program, including a request for relaxation of the NRC November 12, 1982 " Order to Show Cause and Order Immediately Suspending Construction" (CLI-82-33) per Section IV.B (3) , will be made by November 1, 1983.

TED']

8309210163 830915 I O $83 PDR ADOCK 05000358

Mr. J.G. Keppler Regional Administrator September 15, 1983 l

LOZ-83-0152 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55 (e) .

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY

. Rd ENIOR VICE PRESIDENT DJS/sfr cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Senior Resident Inspector ATTN: "P.

. Gwynn NRC Zimmer Project Inspector, Region III ATTN: E. R. Schweibinz

\