IR 05000414/1985066

From kanterella
Jump to navigation Jump to search
Insp Rept 50-414/85-66 on 851209-13.No Violation or Deviation Noted.Major Areas Inspected:Fire Protection & Licensee Actions Re Implementation of Plant Safe Shutdown Guidance.Details Withheld (Ref 10CFR2.790)
ML20210H524
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 01/22/1986
From: Conlon T, Mcelhinney T, Miller W, Riff A, Ruff A, Wiseman G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19277J417 List:
References
50-414-85-66, NUDOCS 8604030087
Download: ML20210H524 (1)


Text

MATEntAL7RANSMITTED HEREWITH

' =

A IE4

[ i j CONTAINs 2.790 lNTosMAT10N UNITE 3 STATES pN

,

8 t

^q v' NUCLEAR REGULATORY COMMISSION 'V J

,e [ o REGION ll g

,, j 101 MARIETTA STREET, 't ATLANTA, GEORGI A 30323

\, ...../

Report No.: 50-414/85-66 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket No.: 50-414 License No.: CPPR-117 Facility Name: Catawba Unit 2 Inspection Conducted: December 9-13, 1985 Inspectors: [.R. Idh.cus W. H. Miller, J ///5/" 86 Ddte Signed iE \b a , ~

G. R. Wiseman ihsh Date Signed b ] $. $1 / l- D - 75 A. B. Ruff ~/ Date Signed erdnma .c T. F. McElhinney fY->4

,

lllflTi, Date Signed Approved by: Ahhnt e1( Y T. E. Conlon, Section Chief l-- 2 2 - C6 Date Signed Engineering Branch Division of Reactor Safety SUMMARY Scope: This special announced inspection involved 125 inspector-hours on site in the areas of fire protection and the licensee's actions regarding the implementation of the plant safe shutdown pidance provided in Standard Review Plan 9.5.1, positions C.5.b and C. Results: No violations or deviations were identifie K 4 NO

MATERIAL TR ANSM4iTED HEREWITri LONT AtM 2 790 INFORM ATioN

. _ .