ML20210H515
| ML20210H515 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/28/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML19277J417 | List: |
| References | |
| NUDOCS 8604030083 | |
| Download: ML20210H515 (2) | |
See also: IR 05000414/1985066
Text
fN
[ETER;p,L Tgry3;,,3fTfD htRCyaTH
'
f[
(f
cot lTtJW,2290 gNfoR'd%TIQN
y-
,
j
/g
8g tr g %
(
/
UNITED STATES
(
/
v'
NUCLEAR REGULATORY COMMISSION
v'
/.y#
.,$--
3
REGloN 11
f
o
101 MARIETTA STREET, N.W.
7',
f
ATLANTA, GEORGI A 3o323
o
a
JM A^W
So&M/g5-f g
.,,,<
Duke Power Company
D - --
ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
g
-
422 South Church Street
1+
a,gouv og
Charlotte, NC 28242
% pg
f g
Gentlemen:
SUBJECT:
REPORT NO. 50-414/85-66 4
On December 9-13, 1985, NRC inspected activities authorized by NRC Construction
Permit No. CPPR-117 for your Catawba facility. At the conclusion of the inspec-
tion, the findings were discussed with those members of your staff identif.ied in
the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with 10 CFR 2.790 of NRC regulations, a copy of this letter, its
enclosures, and your reply will be placed in NRC's Public Document Room upon
completion of our evaluatior, of the reply. If the report contains any informa-
tion that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is
necessary that you: (a) notify this office by telephone within ten days from the~
date of this letter of your intention to file a rea;est for withholding; and
(b) in your reply to this letter, include a written applicction to withhold such
information.
Consistent with section 2.790(b)(1), such application must be-
accompanied by an affidavit executed by the owner of the information which
identifies the document or part thereof sought to be withheld, and a full state-
ment of the reasons on the basis of which it is claimed that the information
should be withhe.ld from public disclosure.
This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far
as possible into a separate part of the affidavit. If we do not hear fr,m you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
Should you have any questions ~concerning this letter, piease contact us.
Sincerel ,
k
'g,
Y' 'h '
Y
.
O
Virg
L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
(See page 2)
MATEPfAL TAAN9.:liTF.O ls e:0,Wt
CGNTMNs 2,7% n,rr n;cN
N\\
11 a
\\
F
UoEEsE$M"N,'o'!0Mij7'TH
'
- *
,
e
. .
Duke Power Company
2
'#
Enclosure:
Inspection Report Nos. 50-414/85-66
cc w/ encl:
R. L. Dick, Vice President - Ccnstruction
J. W. Hampton, Station Manager
(
l
.
MATERIAL TRANSMITTED HEREWITH
CoNTAINS 2.793 IN: ORMATION
N
.
,