RBG-45911, January 2002 Monthly Operating Report for River Bend Station

From kanterella
Jump to navigation Jump to search
January 2002 Monthly Operating Report for River Bend Station
ML020720038
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/15/2002
From: King R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBF1-02-0026, RBG-45911
Download: ML020720038 (4)


Text

OEntergy Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 P. 0. Box 220 St. Francisville, LA 70775 Tel 225 336 6225 Fax 225 635 5068 Rick J. King Directcr Nuclear Safety Assurance February 15, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

Subject:

Monthly Operating Report River Bend Station Docket No. 50-458 License No. NPF-47 File No.:

G9.5, G4.25 RBG-45911 RBFI-02-0026 Ladies and Gentlemen:

In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for January 2002.

Sincerely, 4-t RJK/dhw enclosure

Monthly Operating Report February 15, 2002 RBG-45911 RBF1-02-0026 Page 2 of 2 cc:

U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector P. 0. Box 1050 St. Francisville, LA 70775 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hartford, CT 06107

DOCKET NO. 501458 RIVER BEND STATION DATE February 15, 2002 COMPLETED BY Danny H. Williamson TITLE Sr. Licensing Specialist TELEPHONE 225-381-4279 PAGE 1

OF 2

OPERATING STATUS

1. REPORTING PERIOD:

January 2002

2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net):

966

3. DESIGN ELECTRICAL RATING (MWe-Net):

966 MONTH YEAR TO CUMULATIVE DATE

4. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 112119.5
5. HOURS GENERATOR ON LINE 744.0 744.0 108508.5
6. UNIT RESERVE SHUTDOWN HOURS 0

0 0

7. NET ELECTRICAL ENERGY GENERATED (MWH) 748,263 748,263 96,341,210

PAGE 2

OF 2

UNIT SHUTDOWNS LEGEND:

SHUTDOWN METHOD:

I - Manual 2 - Manual trip I scram 3 - Automatic trip I scram 4 - Continuation 5 - Other (explain)

REASON:

A - Equipment failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator training I License Exam F - Administrative G - Operational error (explain)

H - Other (explain)

1. Please note that a power uprate modification has been installed at River Bend Station, resulting in higher electrical output. Effective January 1, 2002, the station's maximum dependable capacity has been changed to 966 net megawatts electric.
2. There were no challenges to the reactor safety relief valves in January.

Danny H. Williamson TYPE:

F - Forced S - Scheduled NOTES: