RBG-46399, Fitness-For-Duty Program, Six Month Performance Data Report

From kanterella
Jump to navigation Jump to search
Fitness-For-Duty Program, Six Month Performance Data Report
ML050540409
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/15/2005
From: Lorfing D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBF1-05-0022, RBG-46399
Download: ML050540409 (4)


Text

'tEntergy Entergy Operations, Inc.

River Bend Station 5485 U. S. Highway 61 N St. Francisville. LA 70775 Fax 225 635 5068 February 15, 2005 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 River Bend Station Fitness-For-Duty Program Six-Month Performance Data Report File No.:

G9.5, G1.51 RBG-46399 RBF1 0022 Gentlemen:

Pursuant to 10CFR26.71 (d) "Recordkeeping requirements," enclosed is River Bend Station's Fitness-for-Duty (FFD) Six-Month Program Performance Data Report for the report period July 1, 2004, through December 31, 2004. This report contains statistical data and trend analysis compiled by the Fitness-for-Duty Department.

Should you have any questions regarding the attached, please contact Ms. Dee Childress at (225) 381-3655 or Mr. Bill Fountain of my staff at (225) 381-4625.

Sincerely, David N. Lorfing Manager - Licensing Acting)

DNLIWJF enclosure ACC9

River Bend Station Fitness-For-Duty Program Six-Month Performance Data Report RBG-46399 Page 2 of 2 cc:

U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Resident Inspector (w/o)

P. 0. Box 1050 St. Francisville, LA 70775 Mr. Michael K. Webb, NRR Project Manager U.S. Nuclear Regulatory Commission M/S OWFN / 7D-1 Washington, DC 20555

Enclosure to RBG-46399 Fitness For Duty Program Semi-Annual Performance Data Report - Personnel Subject to 1 OCFR26 Section I - Company Data Company: Entergy - River Bend Station Six-Month Period: 07/01/2004 to 12/31/2004 Location:

Entergy - River Bend Station Drugs Tested Fo Screen/Confirmation (ng/mi) 5485 US Hwy 61 St. Francisville, LA 70775 Marijuana 100/15 Marijuana 50/15

Contact:

Dee Childress Cocaine 300/150 Supervisor of Investigations & Fitness for Duty Opiates 300/300 Amphetamines 1000/500 Phencyclidine 25/25 Phone:

(225) 381-3655 Alcohol (%BAC) 0.04% BAC Random Testing Rate: NLT 50% per annum.

Section II - Testing Results Licensee Employee Long-Term Contractor Short-Term Contractor Total Avg. Workforce 729.01

-l 120.00 346.88 1195.90 Category Tested Positive Refused Tested Positive Refused Tested Positive Refused Tested *Positive Refused Follow-Up 11 0

0 0

0 0

3 0

0 14 0

0 Observed Behavior 0

0 0

0 0

0 3

3 0

3 3

0 Other 2

0 0

0 0

0 3

2 0

5 2

0 Post Accident 0

0 0

0 0

0 0

0 0

0 0

0 Pre-Access 29 0

0 0

0 0

760 6

0 789 6

0 Random 218 0

0 0

0 0

105 1

0 323 1

0 Total 260 0

0 0

0 0

874 12 0

1134 12 0

Section III - Breakdown of Confirmed Positive Tests for Specific Substances Alcohol Ampheta-Cocaine Marijuana Marijuana Opiates Phenycli-FFD Refused Total mines 50 100 dine Violation Licensee Employee 0

0 0

0 0

0 0

0 0

0 Long-Term Contractor 0

0 0

0 0

0 0

0 0

0 Short-Term Contractor 3

0 1

0 6

0 0

0 2

12 Unknown 0

0 0

0 0

0 0

0 0

0 Total 3

0 1

0 6

0 0

0 2

12 Note: Discrepancies in the totals in this section versusSection II indicate that one or more tests detected multiple drugs. Refer to Section IV for the declaration of these tests and their corresponding drugs.

Generated on 01/12/2005 Page I of 2

Enclosure to RBG-46399 Section IV - Breakdown of Tests With Multiple Detected Drugs Alcohol Ampheta-Cocaine Marijuana Marijuana Opiates Phenycli-FFD Refused mines 50 100 dine Violation Unknown 0

0 0

0 0

0 0

0 0

Section V - Blind Testing Results 03 10.00 %

04 10.00 %

Period 20.00 %

Section VI - Random Testing Results For Period 26.59 %

For Year 53.13 %

Generated on 0111212005 Page 2 of 2