RBG-45994, Submittal of Revisions to Emergency Implementing Procedures

From kanterella
Jump to navigation Jump to search
Submittal of Revisions to Emergency Implementing Procedures
ML022170599
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/30/2002
From: King R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G9.20.6, G9.5, RBF-02-0123, RBG-45994
Download: ML022170599 (32)


Text

Entergy Operations, Inc.

River Bed Statior 5485 US Hijgý,vay 61 s.C Boý 2230 Rick J. King July 30, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

River Bend Station - Unit 1 Docket No. 50-458 License No. NFP-47 Submittal of Revisions to Emergency Implementing Procedures File No.:

G9.5, G9.20.6 RBG-45994 RBFI-02-0123 Ladies and Gentlemen:

Pursuant to I OCFR50 Appendix E,Section V, enclosed is a copy of one emergency implementing procedure that has been revised. The procedure is TQ-110, Revision 1, "Emergency Preparedness Training Program." In accordance with 1 OCFR50.54(q), the changes do not decrease the effectiveness of the Emergency Plan.

If you have any questions or require further information, please contact Barry Allen at (225)-378 3310.

Sincerely, RJK/

enclosures

Submittal of Revision to the RBS Emergency Implementing Procedures RBG-45994 RBF1-02-0123 Page 2 of 2 cc:

U. S. Nuclear Regulatory Commission (2)

Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector P. 0. Box 1050 St. Francisville, LA 70775

TIO Enn~

Pmemodmes ndM=P ReveWsm Cros Discolroe Review.....................

Code R@Vi*

I OCFR5O.59 Review....................

I OCFR5O.54 Review....................

Eniom enA~iO udkonn................

On-Sits Sa"t Review Committe Reviews.....

Rewired NO NO procsg1re Owne Tom TsnkmW iy Imonager. Trainiu ng Devel OrA me ovemd:

6ASign=re)

(Dete) aibsive Odea:

678119 713119 TR12 7M1a NA ANO a"I m"

W3 hes Now Pin ucovicdsionAnclon Bok:Roism n

aI, cc poreftor of TCN at ANO. GGNS end WF3 Added Maftre from deo* guide In pmecdur.

Added Course summarISiest VInt ulbchm Added One ANO cornmN mend Cherged ANO Lesson Pla Codes Changed one RD p ael9 mn tite Dehbtd smen WF3 commnvhusb Deleted refmnc 2.9 DGTQI 10 NF uCLEA Nom.QUA~rTY RELATED TQ-110 REV. No.1I Enter~gy IAAGU MANUAL NO*AmIfSTwml mpocUi pape I

of

-4 INPOMATMOAL USE

In Title Purpose References Definitions Responsibility Details 5.1 Emergency Plan Training for Al Personnel 5.2 Prerequisites for Emergency Response Organization Personnel 5.3 Initial Training for ERO Personnel 5.4 Re-qualification Training for ERO Personrnel 5.5 Exemptions/Waivers Interfaces Records Requirements and Commitment Cross Reference Attachments 9.1 Course Summaries 9.2 ANO Training Matrix 9.3 GGNS Training Matrix 9.4 RB Training Matrix 9.5 WF3 Training Matrix IEnto NUCLEAR NON-QUALnY RELATED TQ-110 REV. No. 1 MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 2

of 38 INFORMATIONAL USE Sectio 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Pase 3

3 4

5 5

5 6

6 7

8 8

8 9

11 11 18 23 27 35

A NUCLEAR NoN-QuAuTY RELATED TQ-110 REV. No. 1 z--Enfrgy MANAGEMENT MANUAL NON-ADmNISTRATIVE PROCIDURa Page 3

of 38 INFORMATIONAL USE 1.0 PURPOSE 1.1 This procedure establishes the appropriate training and qualification requirements for Emergency Response Organization (ERO) personnel in accordance with the site Emergency Plans.

2.0 REFERENCES

2.1 ANO, GGNS, RBS, WF3 Emergency Plans 2.2 NUREG-0654 "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" 2.3 Title 10, Code of Federal Regulations, Part 50(10CFR50) 2.3.1 Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities" 2.3.2 50.47. "Emergency Plans" 2.4 INPO 96-009, "Maintaining Emergency Preparedness Manual" 2.5 Title 10, Code of Federal Regulations, Part 20, "Standards for Protection Against Radiation" 2.6 Entergy Nuclear Management Manual (NMM) Company Procedures 2.6.1 No. PL-140, "Emergency Response Organization Respiratory Protection Guidelines" 2.6.2 No. PL-147, "Personnel Expectations Related to Emergency Response at Entergy Nuclear Sites" 2.6.3 No. TQ-201, "Systematic Approach to Training Process" 2.6.4 No. TQ-1 06, "Instructor Training and Qualification Process" 2.6.5 No. TQ-205, "Training Exemptions" 2.7 Entergy Emergency Preparedness Position Papers 2.7.1 Position Paper No. 9, "Management and Tracking of Emergency Response Organization (ERO) Qualifications" 2.8 Station Procedures 2.8.1 ANO-1000.015, "Station Training Program" 2.8.2 GGNS S-04-36, Handling of Training Documents 2.8.3 WF3 - NTP-003, "Training Records"

A --

NUCLEAR NON-QUALITY RELATED TQ-1 10 REV. No. I MANUAL NON-ADMINISTRATIVE PROCEDURE Page 4

of 38 INFORMATIONAL USE 3.0 DEFINITIONS 3.1 Annual - For the purposes of this procedure, annual is defined as that period between January 1 and December 31stof each year.

3.2 Credit by Examination (CBE) - Training credit given to ERO personnel for successfully completing Emergency Plan training courses by passing the examination only. CBE is only allowed under certain circumstances for experienced ERO members in accordance with station training procedures.

3.3 Computer Based Training (CBT) - Training provided to ERO personnel through the use of computer interaction. CBT courses may be provided to students either remotely or in a classroom setting.

3.4 Drill - Performance enhancing experiences that reasonably simulate the interactions between appropriate centers and/or individuals that would be expected to occur during emergencies. Drils are an ERO training activity and may be used for initial and/or re qualification training purposes.

3.5 Emergency Response Organization (ERO) - Personnel who are assigned and trained to respond to emergency events and perform duties as outlined in site emergency plans.

3.6 ExemptionsiWaivers - Emergency Preparedness Training/Qualification credit given to students/instructors implemented in accordance with NMM TQ-205, 'Training Exemptions'.

3.7 Exercise - An activity aimed at testing the integrated capability and a major portion of the basic elements of the Emergency Planning and Response Organizations. An exercise involves a major portion of the Emergency Response Organization and is evaluated by the NRC.

O E

yNNUCLEAR NoN-QUALITY RELATED TQ-1 10 REV. No. I nterg MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 5

of 38 INFORMATIONAL USE 3.8 Tabletop - A specialized training session conducted for an emergency response facility or group. Tabletops are seminar style meetings in a facility to discuss objectives and expectations of ERO personnel. These sessions are designed to emphasize team building and correct previously identified weaknesses.

3.9 Walkthrough - A training activity designed to develop and maintain an individual's knowledge of their assigned ERO duties. The walkthrough is normally conducted in an emergency response facility and includes discussion or demonstration of the appropriate facility activation, staffing, and organizational responsibilities for the individual's assigned ERO position.

4.0 RESPONSIBILITIES 4.1 Manager, Training and Development - Is responsible for providing and implementing an Emergency Preparedness Training Program and for overall performance of this program.

4.2 Manager, Emergency Preparedness - Is responsible for ensuring a comprehensive Emergency Preparedness Training Program is maintained for all offsite and onsite response personnel.

4.3 Supervisor, Technical Training - or designee is responsible for the administration of the day-to-day performance of the EP Training Program.

4.4 EP Training Instructor - Responsible for the development, scheduling, administering, and documenting of EP Training.

4.5 Emergency Response Personnel in accordance with NMM, Company Procedure, No. PL 147 will:

4.5.1 Maintain emergency response qualifications for their position including EP Training and additional specific training such as licenses, respirator qualifications, PAT, RWT, and FFD training.

4.5.2 Attend scheduled training and if unable to attend, provide prior notification to their supervisor and to the instructor.

5.0 DETAILS 5.1 Emergency Plan Training for ALL Personnel Information on the Emergency Plan is administered as part of Plant Access Training (PAT) to all personnel (excluding visitors) coming onsite for the first time and to all personnel participating in the annual PAT retraining program. This portion of PAT meets the following objectives:

5.1.1 Trains personnel with respect to their responsibilities during an emergency situation.

5.1.2 Keeps personnel informed of any applicable changes to the Emergency Plan

NUCLEAR NON-QUALITY RELATED TQ-1 10 REV. No. I MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 6

of 38 INFORMATIONAL USE 5.1.3 Instructions concerning the following will be given to all personnel participating in Plant Access Training:

5.1.3.1 Signals and alarms 5.1.3.2 Evacuation routes and procedures 5.1.3.3 Response during an emergency 5.1.3.4 Response on observing an unusual occurrence 5.1.3.5 Emergency classifications 5.1.3.6 Public relations 5.2 Prerequisites for Emergency Response Organization Personnel 5.2.1 Plant Access Training including Fitness for Duty is required for all ERO personnel.

5.2.2 Radiation Worker Training is required for all ERO personnel, excluding News Center personnel.

5.2.3 Respiratory Protection Training, physical and fit test as required per NMM, Company Procedure, No.PL-140.

5.3 Initial Training for Emergency Response Organization Personnel 5.3.1 Individuals designated as Emergency Response Organization (ERO) personnel must be qualified in accordance with this procedure.

5.3.2 Requirements for each position are found in the site training matrices, Attachment 9.0.

5.3.3 Initial Emergency Response Organization (ERO)Training Requirements-Initial ERO training is designed to provide the necessary instruction to personnel that are assigned to the ERO, as it relates to their designated ERO position, and may include all or portions of the following course areas:

Essential Training (Basics of Emergency Response Organization and Facilities)

Facility Training Position Specific Training Drill, Tabletop, or Walkthrough Operations Event Training These course areas should be taught in accordance with the applicable matrix in 9.0.

5.3.4 Scheduling for initial training is normally coordinated between the individual and the EP Training instructor and/or through the use of "OnTrack for Training".

5.3.5 Evaluations are normally given to ensure adequate understanding and retention of material covered in the classroom, and/or other specific qualifying activities.

Written exams require a passing score of 80% or greater. Evaluations are Administered in acrordance with reference 2.6.3.

NUCLEAR NoN-QuAuTY RELATED TQ-1 10 REV. No. 1

-Entergy' MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 7

of 38 INFORMATIONAL USE 5.3.5.1 Individuals who fail to pass Initial Training must be remediated which may include remedial training and/or re-examination.

5.3.6 Initial ERO training supplements the training received by personnel through their departmental training.

5.4 Re-qualification Training for ERO Personnel 5.4.1 ERO Re-qualification Training is given to reinforce Initial Training in accordance with the applicable matrix in 9.0.

5.4.2 You must attend training annually (or as indicated in the applicable matrix in 9.0) to remain qualified in your assigned position.

5.4.3 Prior to taking ERO Re-qualification Training, you must be current in Initial Training.

5.4.4 ERO Re-qualification Training Requirements - Course material provided during re qualification training is determined from previous drlltraining evaluations and ERO personnel needs. Re-qualification training course material may include information from all or portions of the following :

Essential Training (Basics of Emergency Response Organization and Facilities)

Facility Training Position Specific Training Drill, Exercise, or Tabletop Operations Event Training These courses should be taught in accordance with the matrices in 9.0.

5.4.5 Scheduling for re-qualification training is normally coordinated between the individual and the EP Training instructor and/or through the use of "OnTrack for Training".

5.4.6 Evaluations are normally given to ensure adequate understanding and retention of material covered In the classroom, and/or other specific qualifying activities.

Written exams require a passing score of 80% or greater. Evaluations are administered in accordance with reference 2.6.3.

Credit by Exam (CBE) may be given in lieu of classroom, CBT, etc. at the discretion of the instructor. Failure of CBE requires completing an initial class.

5.4.6.1 Individuals who fail to pass Re-qualification Training should be remediated the same working day. Remediation may include remedial training and/or re-examination. If rernediation is not accomplished within the same working day, the failure must be reported to Emergency Preparedness as soon as possible.

5.4.6.2 AN failures after attempting 5.4.6.1, must complete Initial Training Requirements.

NUCLEAR NON-QUAlITY RELATED TQ-110 REV. No. 1

=-En rg MANAGEMENT_

MANUAL NON-ADMW4mTRATI PROCEDURE Page 8

of 38 INFORMATIONAL USE 5.4.7 ERO Re-qualification Training supplements the training received by personnel through their continuing departmental training.

5.4.8 Consequences - If an individual fails to remain qualified in accordance with this procedure, the individual shall be disqualified from participating in the ERO.

5.4.9 Conditions of Disqualification - Individuals that are removed from the ERO shall not perform during emergencies and exercises in assigned ERO positions until the required qualifications are completed. They may perform in assigned ERO positions during drills or other practical training activities.

5.4.10 Reinstatement of disqualified ERO Members -When deficient course work/qualifications are completed LAW this procedure the member will be reinstated in their former ERO position.

5.5 Exemptions/Waivers may be granted per reference 2.6.5.

6.0 INTERFACES None 7.0 RECORDS 7.1 AN records shall be documented and recorded in accordance with applicable site procedures.

A NUCLEAR Noi-QuAuTY RELATED TQ-110 REV. No.I MANUAL NON-ADIwNUTRATIE PROCEDURE Page 9

of 38 INFORMATIONAL USE 8.0 CON IT C

Plant Commitment Requirement Nne" Paragraph Number Corp. Proc explanation Number GGNS P-22986-88 UFSAR 18.1.22.S3-5 5.3.1, 5.3.2, 5.4.8 Tmg. for Mitigating Core Damage GGNS P-22989 UFSAR 18.1.22.S7 5.3.1, 5.3.2. 5.4.8 Tmg. for Mitigating Core Damae S F-2w8 AECM-5.4.6.1, 5.5 Escalation of Deviations 89/0202.AT.1,IV.S7 from Emer. Training GGNS P-26675 ANSI N2.3.4.5.1.S1 5.1.3.1 Evacuation Signal Testing GGNS P-26676 ANSI N2.3.4.5.2.Si 5.1.3.1 Evacuation Signal Testing GGNS P-26677 ANSI N2.3.4.5.3.92 5.1.3.1 Evacuation Signal Testing GGNS P-28891 E-PLAN 6.5.1.A.5 5.1 Dedared Emergency Situations GGNS P-28945 E-PLAN 8.2.S1 Whole procedure Emergency Plan Training I

_Program GGNS P-28946 E-PLAN 8.2.$2 Whole procedure Emergency Plan Training GG

-NSP-2848 E-PLAN 8.2.1.S 5.1 GET GGNS P-28949 Ef-PAN 8-.2.1.$2 5.1 GET 9GG P-2895 E-PLAN 8.2.1.S3 5.1 GET GGNS P-28951 E-PLAN 8.2.$.51 5.3.1, 5.3.29 5.4.8 Emergency Plan Training GGfNS P-28952 8.2.2.S2 Whole procedure Emergency Response Training GGNS P-28953 E-PLAN 8.2.2.S3 Whole procedure Emergency Preparedness Specialized Training GGNS P-29532 TRM 7.6.3.1I, 5.3.1, 5.3.2, 5.4.8 Emergency Preparedness Tmg. Program GGNS P-32776 FSAR 18.1.22.S6 5.3.1, 5.3.2, 5.4.8 Training for Operations Mgmt. personnel G-GN PX-11I4 Tech Spec 5.5.3a 5.3.1, 5.3.2, 5.4.8 Chemistry Training Program GGN P-32820 FSAR 7.7-1.11.4.3.S3 5.3.1, 5.3.2, 5.4.8 Classroom Training will be provided on PASS system operation and proper handling of highly radioactive samples GGNS P-33053 GNRO-97/00080.97-5.3.1, 5.3.2, 5A.8 Ensure persons that perform OGNRI 9/0111997 on-shift radiological assessment will periodically train with operations personnel in a Control Room/Simulator setting ANO P-4175 0CAN128305 5.2.1,5.3.3,5.4.2 GET, ERO Assignment, I_

_ERO Requal.Training ANO P-10866 0CAN058203 5.2.1,5.4.2 Z",

ERO Reual T ANO P-4822 0CAN098106 5.3.3 & 5.4.4 ERO Real Training RBS 1-15735 RBFI-98-0070 5.2.1, 5.2.2, 5.4.2 PAT, RWT W3 P-574 E-PLAN 3.4.4 5.3 Ensure Comprehensive Training Program is maintained for al on-site and Off-site response personnel.

W3 P-12T75 IR 85-25 5.4 NRC Notification W3 P-5121 E-PLAN 5.1.2 5.3 Training and Qual. Of members of On-shift Emerg.

Organization W3 P-13297 FSAR 5.1.3.U 5.3 Training for Rad. Emerg.

Teams

is NUCLEAR NoN-QuAuTY RELATED TQ-110 REV. No. 1 Entergy MANAGEMENT MANUAL NON-ADMINISTRATIE PROCEDURE Page 10 of 38 INFORMATIONAL USE

9.0 ATTACHMENTS 9.1 Course Summaries Arkansas Nuclear One (ANO)

ASLP-EP-AOOI1 ASLP-EP-A0012 ASLP-EP-A0013 ASLP-EP-A0014 ASLP-EP-AO015 ASLP-EP-A0016 ASLP-EP-AO017 ASLP-EP-A0021 ASLP-EP-A0022 ASLP-EP-A0024 ASLP-EP-A0025 ASLP-EP-A0026 ASLP-EP-A0031 ASLP-EP-A0032 ASLP-EP-A0041 Emergency Response/Support Organization Emergency Response Facilities Overview Emergency Plan and EPIP's Role of the NRC Emergency Interface Agreement Scenario/Exercise Rules and Guidelines Turnover of Responsibilities Medical Emergencies Dealing with the Media - offered upon recommendation by EP Manager, Provided by Entergy Corporate Communications Evacuation Reentry for Recovery EP Training for Engineers Communications Emergency Systems Review - offered upon recommendation; Operations Training Controller/Evaluator Training NUCLEAR NON-QUAUTY RELATED TQ-110 REV. No. 1 Ent,,m, MANAGEMENT MANUAL NoN-ADmINISTRATE PROCEDURE Page 11 of 38 INFORMATIONAL USE

ASDRL-EP-A0044 ASLP-EP-A0045 ASLP-EP-A0060 ASLP-EP-A0062 ASLP-EP-A0063 ASLP-EP-A0071 ASLP-EP-A0072 ASLP-EP-A0073 ASLP-EP-A0081 ASLP-EP-A0082 ASCBT-EP-A0083 ANO-1/2-SAMG (OPS)

ASLP-EP-A0091 ASRR-EP-A0093 ASOTH-EP-A0094 ASWBK-EP-ERORQ ASLEC-EP-ERORQ ASCBT-EP-ERORQ ASDRL-EP-SIMPI ASLP-EP-A0064 ASLP-EP-OPSRQ ERO Drill ERF Walkthrough Duty Emergency Planner Offsite Dose Consequences Dose As sessment Training Onsite Radiation Monitoring Team Non-routine Equipment Radiological Field Monitoring EAL Class - Operations Training Emergency Response/Notification Severe Accident Management (Overview)

Severe Accident Management (In-Depth) - Operations SAMG Course Update Training Emergency Plan Required Reading Misc. Emergency Plan Training ERO Requalification Training (Workbook)

ERO Requalilication Training (Lecture)

ERO Requalification Training (Computer Based Training)

Simulator PI Drill ENC Staff Training Emergency Plan SRO/SE Requal Training NUCLEAR No.*QuAuTy RELATED TQ-110 REV. No. 1

~EnterWj' MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 12 of 38 INFORMATIONAL USE

NUCLEAR Nom-QumT RELATED TQ-110 REV. No. 1

-E,,ntprov MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 13 of 38 INFORMATIONAL USE Grand Guif Nuclear Station IGGNS)

Essential Training Facility Training Position Specific EPTS 1 - Security Training EPTS 2 - Mitigation and/or Recognition of Core Damage EPTS 3-Radiological Assessment EPTS 5-Radiological Monitoring EPTS 6-Emergency Assessment EPTS 7 - Post-Accident Sampling EPTS 9 - Standard First Aid (American Red Cross lAW their policies and procedures)

EPTS 11 - Response Teams CPR/CPRP - Adult CPRICPR Professional (LAmerican Red Cross lAW their policies and procedures)

EPTS 14 - EIC Staff Specific Training EPTS 16 - OSC Coordinator and OSC HP Coordinator Training EPTS 17 - Security Coordinator Training EPTS 19 - Severe Accident Procedures Training EPTS 23 - ENMCIEIC Specific Training EPTS 24-EOF Specific Training EPTS 25 - Communicator Training

NUCLEAR NON-.QuAuTY RELATED TQ-110 REV. No. 1

  • EnterW MANAGEMENT MANUAL NON-ADUHISTRATIVE PROCEDURE Page 14 of 38 INFORMATIONAL USE Facility Walkthrough (FW) - Discussion and/or demonstration of individual's assigned ERO position.

Drill Participation - Participate in a qualifying EP Activity in the ERO position assigned.

Riverbend Station (RBS)

Essential Training LEC-EP-100 Facility Training LEC-EP-101 Position Specific LEC-EP-022 LEC-EP-023 LEC-EP-024 LEC-EP-031 LEC-EP,432 LEC-EP-041 LEC-EP-042 LEC-EP-O51 LEC-EP-052 LEC-EP-053 LEC-EP-061 LEC-EP-071 LEC-EP-083 LEC-EP-491 Emergency Preparedness; Organization and Facilities Facility Training Notifications (NEOs)

Notifications (SROs)

Notifications (TSCIEOF Comm)

Emergency Identification and Classifications (Ops Coord/Adv)

Emergency Identification and Classifications (SROs)

Radiological Assessment and Protective Action Recommendations (RPA/RPC)

Radiological Assessment and Protective Action Recommendations (SROs)

Offsite Dose Calculation Methodology (Chem Techs)

Offeite Dose Assessment (OSS, CRS, CCDAC)

Offsite Dose Calculations and Protective Action Recommendations (RAC, ARAC, CCDAC)

Radiological Monitoring NCOINEO Emergency Response Duties Management Control of Emergencies (RMIED/Mgrs)

Emergency Response Training for Security Personnel

ERO Tabletop Training First Responders-Emergency Organization and Facilities Overview of Severe Accident Guidelines Severn Accident PhenomenalTechnical Support Guideline Training Waterford 3 (WF3)

PAT Plant Access Training RWT Radworker Training Essential Personnel (1)

WLP-EP-ESS Facility Training (2)

WLP-EP-TSC WLP-EP-OSC WLP-EP-EOF Position Specific (3)

WLP-EP-EC WLP-EP-TSPV WLP-EP-SS WLP-NAO-EP01 WLP-EP-THPC Essential Personnel Technical Support Center Operational Support Center Emergency Operations Facility Emergency Coordinator TSC Supervisor/TSC Supervisor Communicator SM/CRS/NPO/Operations CoordinatorlOperations Communicator/STA Nuclear Auxiliary Operator TSC Health Physics/HPC/HPC Assistant/DAC/DAC Assistant Dose Assessment Communicator NUCLEAR NoN-QuAuiTY RELATED TQ-1 10 REV. No. 1

  • Entergy MANAGEMENT MANUAL NON-ADMNIISTRATIVE PROCEDURE Page 15 of 38 INFORMATIONAL USE LEC-EP-415 LEC-EP-118 LEC-EP.122 LEC-EP-124 WLP-EP-DACM

WLP-EP-TCOM WLP-EP-TENS WLP-EP-SECS WLP-EP-SEC WLP-EP-TENG WLP-EP-TNUC WLP-EP-TCHM WLP-EP-CHEM WLP-EP-OSPV WLP-EP-OCOM WLP-EP-EMHP WLP-EP-RDW WLP-EP-OAAS WLP-EP-TSBK WLP-EP-TLOG WLP-EP-OITR WLP-EP-OMAN WLP-EP-EDIR WLP-EP-EENG WLP-EP-ENUC TSC Communicator #land #2/TSC Lead Communicator ENS Communicator Security Superintendent E-Plan Security TSC Engineer/TSC Lead Engineer/TSC Electrical Engineer/TSC Mechanical Engineer TSC Nuclear Engineer TSC Chemistry Engineer Emergency Chemistry OSC Supervisor/OSC Supervisor Assistant/OSC Electrical Lead/OSC I&C Lead/OSC Mechanical Lead OSC Supervisor Communicator Emergency HP Monitoring Team/RCC Emergency Radwaste Assembly Area Supervisor TSC Status Board Keeper TSC Logkeeper OSC IT Representative OSC Manpower/Electrical Maintenance/l&C Maintenance/ Mechanical Maintenance/lOSC Miscellaneous Support EOF Director/Deputy EOF Director EOF Engineer/EOF Electrical Engineer/EOF I&C Engineer/EOF Mechanical Engineer/Operations Engineering Coordinator/Operations Engineering Coordinator EOF Nuclear Engineer NUCLEAR NoN-QUAuTY RELATED TQ-110 REV. No. 1

  • Enterov MANAGEMENT MANUAL NON-ADUIsTRATiE PROCEDURE Page 16 of 38 INFORMATIONAL USE

WLP-EP-ESBK WLP-EP-ERAC WLP-EP-FTCM WLP-EP-EOTA WLP-EP-TSPK WLP-EP-TREP WLP-EP-OTAT WLP-EP-ECOM WLP-EP-EENT WLP-EP-ELIC WLP-EP-EADM WLP-EP-ELOG EOF Status Board Keeper EOF Health Physics/RAC/RAC Assistant/Field Team Controller/Dose Projection Coordinator EOF Field Team Communicator Offsite Technical Advisor Technical Spokesperson Technical Representative/St. Charles Parish Technical Representative/St. John Parish Technical Representative/State Technical Representative Offsite Technical Advisor Assistant EOF Communicator #1, #2, #3/Communications Coordinator Entergy System Liaison Licensing Coordinator Administration/Logistics Coordinator EOF Logkeeper/Administrative Assistant - Training/Administrative Assistant General/ EOF Procurement Representative Severe Accident Management Overview (4)

NUCLEAR NoN-QuALUT RELATED TQ-110 REV. No.1

- Entergy MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 17 of 38 INFORMATIONAL USE

9.2 - ANO Training Matrix Emergency Operations Facility Emergency Response Organization (ERO)

Position/TUOI Training Matrix ANO ERO Position/TUOI Training Matrix - Initial Training EP-A.._ (S.. TUOI Listing)

(EOF)

NUCLEAR NON-QUALITY RELATED f TQ-110 REV. No. 1 MANUAL NoN-ADmiNISTRATIVE PROCEDURE Page 18 of 38 INFORMATIONAL USE 11 12 13 14 15 16 17 21 22 24 25 26 31 32"4445 60 62 63 71 72 73 81 82 83 SAM G*

Acc. Assrnt.

x x

x iX X

X X

X X

X X

Manager Comm. Manager X

X X

X X

X X

_X C_

Liaison X

x x

x x

X X

_X Dose Assessment X

X X

X X

X

-X Tm.

DoesAssmt.

XX X

X--

X X

X XX XX S&pv.

Engineering X

X X

x x

x x

EOF Director X

X X

X X

X X XXX XX X

X X

X X

X EOF HP Supv.

X X

x X

X X

X-X EOF MainL X

X X

X X

X x

x Coord.

EOFSupport X

X X

X X X X

X X

Supt.

Emrg. Rad.

X X

X X

X X

X x

x x

x TeamI EP Duty X

X X

Notif.

XX X

X XX X

X XX XX Commwunicator Offsite Monit.

X XX X

XX XX XX X

X XX REAM XX X

X XiX X

X X

XXI-X X

_x Status Board XX X

XX X

X X

Conm.

Support Manager X

X X

X X

X X

X-X

Operational Support Center (OSC) 11 12 13 14 15 16 17 21 22 24 25 26 31 32 4445 60 62 63 71 72 73 81 82 83 SAM Elect. Maint.

X X

X X

X X-

-X Supv.

Emerg. Medical x

x x

x x

x x

Team Sx x

x x

x x

x x

x x

x x

xx x

x x

x x

Mch.EMaint.

XXX X

X

-x-xX Sumv NCHEM Manager X

X X

x x

x x

x x

x x

OSC Director X

X X

XIXI X

X X

X x

x XX

_xX OSC HP Supv.

X XX X

X X

X X

X X-X Status Board XXI X

XX X

X

-X Comm.

Technical Support Center (TSC) 11 12 13 14 15 16 17 21 22 24 25 26 31 32 44 45 60 62 63 71 72 73 81 82 83 SAM Engineering X

XX X

X X

X X

X-X Manager Eng. Support TSC X

X X-X

-X XX X

Maint.Manager X

XX X

X X

X XX X

Notif.

X X

X X

-X

-X X

X X

Communicator Operations Mgr.

X X

X X

X XX X

X X

X X

RP&RW Manager X

X X

X X

X X

X X

X X

X X

X TSC Director Xxx XX XXX XXXX X

X XX X

X X

_X X

TSC Support X

IXXIX X

X X

X X--

X Status Board X

X X

X X

X X

Comm.

NUCLEAR NoN4-QUAUTY RELATED TQ-1 10 REV. No. 1 EnteW MANAGEMENT 1

f3 MANUAL NON-ADMNISTRATIVE PROCEDURE Page 19 of 38 INFORMATIONAL USE

Control Room 11 12 13 14 15 16 17121122 24 25 26 31 32 SIMPI 45 60 62 63 71 72 7381 82 83 SAM Shift Manager X

X X

X X

X X

X X

X XX x

x x

x x

Shift Engineer X

X X

X X

X X

X X

X-X X

SRO X

X xX X

X X

XX X

X X-X X

X X

RO Xxx X

X X

X X-X Status Board X

X X

X X

X X

X Comm.I_

Courms provided by Operallons Training ANO ERO Position/TUOI Training Matrix - Annual Repualification Training (Se. TUOI Uting)

Emergency Operations Facility (EOF)

ASCBTILEC-EP-ERORQ ASDRL-EP-A0044 ASCBT-EP-A0083*

Aoc. Assmt. Manager X

X X

Comm. Manager X

X X

Comm.Liaison X

x X

Dose Assesament Tm.

X X

Dose Asral Supv.

X X

X Engirnering X

x EOF Director X

X X

EOF HP Supv.

X X

X EOF Maint Coord.

X X

X EOF Support SupL X

X X

Emneg. Rad. Team x

x EP Duty x

X Notif. Communicator X

X X

Offaits MoniL Sum.

X X

X REAM X

X X

Status Board Comm.

X X

X Support Manager X

X X

  • Rquired eewry thme years NUCLEAR NoN-QUALITY RELATED TQ-110 REV. No. 1

- EnterWMANAGEMENT MANUAL NON-ADMNISTRAMVE PROCEDURE Page 20 of 38 INFORMATIONAL USE

Operational Support Center (OSC)

ASCBTILEC-EP-ERORQ ASORL-EP-AO044 ASLP-EP-AO025 ASCBT-EP.A0063*

Elect. Maint.

X X

X Enwg. Medical X

X X

MOWn. Supt.

X X

X Mach. MainL X

X X

NCHEM Manager X

X

______x OSC Director X

X X

OSC HP Supy.

X X

______x Status Board X

X X

Commn.

________ASCBTILEC-EP-ERORQ ABDRL-EP-A0044 ASCBT-EP-AOOS?

Engineerin X

X X

En.SpotTCx x

x Maint. Manager X

X X

Notif.

X X

X Commnunictr Operations Mar.

X X

X RP&RW Manage X

X X

TSC Dirctor X

X X

TSC Support X

X X

Supt__

Status Board X

X X

Commn.

  • Roqulred everythree year NUCLEAR NoII-QuAuTY RELATED TQ-110 REV. No.1I 0 Entervgj' MANAGEMENTI_

MANUAL NON-ADuMISTRATIV PROCEDURE Page 21 of 38 INFORMATIONAL USE

Control Room ASLP-EP-OPSRQ ASDRL-EP-SIMPI ASLP-EP-A0025 ASDRL-EP-A0044 Shift Manager X

X Shift Enineer X

X SRO X

RO X

Status Board X

Comm._I NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. 1 0 Entprpv MANAGEMENT MANUAL NON-ADmISTRATIVE PROCEDURE Page 22 of 38 INFORMATIONAL USE

9.3 - GGNS Training Matrix CONTROL ROOM Emergency PAT RWT*

RRT ESSENTIAL EP EPTS EPTS EPTS EPTS EPTS 7 EPTS OTHER Positions FFD FIT TRNG*

DRILL 2

3 25 6

19 FFDS PHYS*

OPS**

Fire Brigade X

x x

x Fire Brigade Tmg*

Operations x

x X

X X

X X

CoordinatorIII NLO/RWO X

x X

X X

RO x

x X

X X

X X

Onshift x

x X

X X

X X

ChemistsI SRO/STA x

x X

X X

X X

Shift x

x X

X X

.X X

X Manager ENMCIEIC Emergency PATIFFDIFFDS*

ESSENTIAL TRNG" FACILITY TRNG EPDRILL EPTS 23 EPTS 14 OTHER Positions Company x

x X

X X

EIC Coordinator X

X X

X X

EIC Staff x

x X

X X

ENMC Clerical x

x X

X FW" Coordinator ENMC Clerical X

x X

X FW" StaffI ENMC Manager x

x X

X X

ENMC Support X

X X

X FW**

Staff Media Monibor X

x X

X FW" Technical x

x X

X X

SpokespersonI NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. 1

- Entetrv MANAGEMENT MANUAL NO.ADFMINISTRATIVE PROCEDURE Page 23 of 38 INFORMATIONAL USE

EMERGENCY OPERATIONS FACILITY Emergency Posltions PAT RWT*

ESSENTIAL FACILITY EP EPTS ? see EPTS 6 EPTS 19 OTHER FFD TRNG**

TRAINING DRILL below FFDS*

Accident Assessment x

x x

X X

X Engineer Emergency Support x

X X

X EPTS Manager 24 EOF Engineer Mechanical X

X X

X X

EOF Engineer Support x

x X

X X

EOF Engineer Electrical x

x X

X X

EOF Engineer Civil x

x X

X X

EOF Admin Director x

X X

X X

EPTS 24 EPTS 25 EOF Communicator x

x X

X X

EPTS 25 EOF Facility Coordinator x

x X

X X

EPTS 24 EOF Habitability Specialist X

x x

x X

EPTS 5 Rad Monitor/

CAA Qualified or HP Qualified Food & Lodging x

x x

x EPTS 24 Background check Coordinator and MMPI', and Breatholizer Training Licensing Coordinator x

x Ofaite Emergency x

x X

X X

X X

Coordinator OEC Technical Assistant x

x X

X X

X X

Offsite Monitoring Team X

x X

X X

RRT, FIT, PHYS*

Driver FW**

Offsite Monitoring Team X

x X

X X

EPTS 5 RRT, FIT, PHYS Monitor Offsite Technical Advisors X

x Plume Tracking Specialist x

x X

X X

EPTS 5 Radiation Emergency x

X X

X X

EPTS 3 X

Manager Radiological Assessment x

x X

X X

EPTS 3 Coordinator TeduVEng. Support X

x X

X X

EPTS 24 X

Manager Radiological Assessment X

x X

X X

EPTS 3 Dose Calculator NUCLEAR NO,-QUAUTY RELATED TQ-110 REV. No. 1 n t MANAGEMENT MANUAL NON-ADMNISTRATVE PROCEDURE Page 24 of 38 INFORMATM.AL USE

OPERATIONS SUPPORT CENTER Emergency PAT RWT RRT ESSENTIAL FACILITY EP EPTS ?

EPTS EPTS 11 CPR*

OTHER Positions FFD FIT TRNG*

TRAINING DRILL See Below 9**

FFDS*

PHYS*

Chemistry Teams/On-X X

X X

X On-call EPTS 7 call Chenist cherrist orgy First Aid Team X

x X

X X

X X

(Eec., I&C)_

I First Aid Team X

X X

X X

X or X or (HP)

EMT CPRP Health Physics x

x X

X X

X EPTS 16 EPTS 2" Coordinator Search and Rescue x

x X

X X

X EPTS 2" Team (Mae, Elec, FOR I&C I&c)

Darnage Control.

X X

X X

X X

Repar, Re-entry and Recovery (Mach, Elec, I&C)

On-cal Health X

x X

X X

X EPTS 5 EPTS 2**

Physicist On-shift HPs X

X X

X X

EPTS 5 EPTS 2" On-ate Monitor x

x X

X X

X EPTS 5 OSCCommunicator x

x X

X FW" OSC Coordinator X

x x

X X

X EPTS16 OSCPlanner x

x X

X FW" SECURITY Emergency Poestions PAT/FFDIFFDS*

RWT*

RRTIFIT/PHYS*

EPTS ? See Below Securty Contract Personnel x

x EPTS I or 17 Security Coordinator x

x EPTS 17 NUCLEAR NoN-QUALUTY RELATED TQ-110 REV. No. 1 e-Enter.w MANAGEMENT MANUAL ONADMwisTm mVE PROCEDURE Page 25 of 38 INFORMATIONAL USE

TECHNICAL SUPPORT CENTER Emergency PAT RWT*

RRT ESSENTIAL FACIUTY EP EPTS 2 EPTS-?

EPTS 6 EPTS 19 OTHER Poshitons FFD FIT TRNG'*

TRAINING DRILL "OPS See FFDS*

PHYS*

_Below Computer Engineer X

X X

X X

EmergencyDirector X

X X

X X

X X

X In*rmation x

x X

X X

X X

Spedalist Radiation Proteclion X

x X

X X

EPTS 3 X

EPTS 2*

Manager Records Document X

X X

X X

FW**

Tednical Manager x

x X

X X

X X

X TSC Cornmunicator x

X X

X X

EPTS 25 TSC Coordinator x

X X

X X

X X

X TSC Coordinator X

x X

X X

X X

X Assistant Engineer(Ekec, x

x x

x x

Meah)

Radiologicax x

X X

X EPTS 3 Assessment Dose ENS Comn unicator X

x X

X X

EPTS 1_

25**

KEY Required every 13 months Required one time only

      • Required every 3 years NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. 1 IORTOeUSMANAGEMENT MANUAL NON-AMi~mmwAT PIOCEDURE Page 26 of 3._8 INFORMATIONAL USE
  • Entergy NUCLEAR MANAGEMENT MANUAL U

-U NON-QU*AuTY RELATED NON-ADmINISTATwE PROCEDURE INFORMATIONAL USE U

TQ-110 REV. No. 1 Page 35 of 38 9.5 - WF3 Training Matrix CONTROL ROOM ESSENTIAL PAT RWT PERSONNEL FACILITY TRAINING POSITION SPECIFIC SAMG Operations Coordinator/Shift Manager Control Room Supervisor Nuclear Plant Operator Operations Communicator Shift Technical Advisor Nuclear Auxiliary Operator OPERATIONS SUPPORT CENTER (OSC)

ESSENTIAL FACILITY POSITION PAT RWT PERSONNEL TRAINING SPECIFIC SAMG OSC Supervisor a________

OSC Supervisor Assistant 0__

OSC Electrical Lead0 0

0 OSC I & C Lead.____

OSC Mechanical Lead Security Superintendent 0

OSC Supervisor Communicator 0

OSC I.T. Representative 0_

Radiological Controls Coordinator 0_

H.P. Monitoring Team Radwaste Assembly Area Supervisor Electrical Maintenance I & C Maintenance Mechanical Maintenance OSC Miscellaneous Support Chemistry

  • Enteigy NUCLEAR MANAGEMENT MANUAL U

NoN-QuArry RELATED NOI-ADWmISTRATwE PROCEDURE INFORMATIONAL USE TQ-110 REV. No. I Page 36 of 38 m

m.

TECHNICAL SUPPORT CENTER (TSC)

ESSENTIAL FACILITY PAT RWT PERSONNEL TRAINING POSITION SPECIFIC SAMG Emergency Coordinator 0_____*____

TSC Logkeeper TSC Supervisor TSC Supervisor Communicator

°

°

°__

Health Physics Coordinator Health Physics Coordinator Assistant

_°_*

Dose Assessment Coordinator Dose Assessment Coordinator Assistant

°

° Dose Assessment Communicator TSC Lead Communicator TSC Communicator (#1 & #2)

ENS Communicator TSC Lead Engineer

  • _°_

TSC Electrical Engineer

° TSC Mechanical Engineer TSC Nuclear Engineer TSC Chemistry Engineer

  • _°_

TSC Status Board Keeper Offsite Technical Advisor

  • EnteWg NUCLEAR MANAGEMENT MANUAL V

NON-QUALITY RELATED NON-ADMINISTRATIVE PROCEDURE INFORMATIONAL USE TQ-110 REV. No. 1 Page 37 of 38 U

EMERGENCY OPERATIONS FACIUTY (EOFI ESSENTIAL PAT RWT PERSONNEL FACILITY TRAINING POSITION SPECIFIC SAMG EOF Director Deputy EOF Director Operations/Engineedng Coordinator OperationsiEngineedng Coordinator*0 Assistant EOF Electrical Engineer

.0 EOF I & C Engineer

__°_*

EOF Mechanical Engineer 0

EOF Nuclear Engineer 0

EOF Status Board Keeper Radiological Assessment Coordinator Radiological Assessment Coordinator Assistant Field Team Controller Dose Projection Coordinator Field Team Communicator Offsite Technical Advisor Offslte Technical Advisor Assistant 0_*______

Communications Coordinator

  • 0 EOF Communicator (#1,#2,#3) 0 Entergy System Liaison 0_

Ucensing Coordinator

  • 0 Administrative/Logistics Coordinator 0

EOF Logkeeper Administrative Assistant - Training Administrative Assistant - General EOF Procurement Representative

  • Enteigy NUCLEAR MANAGEMENT MANUAL p

-U NoN-QuATY RELATED NoN-ADmIsTRATIVE PROCEDURE INFORMATIONAL USE TQ-110 REV. No. 1 Page 38 of 38 1

0 O2FEITE EPS.

ESSENTIAL PAT RWT PERSONNEL FACILITY POSITION TRAINING SPECIFIC St. Charles Parish Technical Representative I

I St. John Parish Technical Representative I.

State Technical Representative EMERGENCY NEWS CENTER (ENC)

ESSENTIAL FACILITY POSITION PAT RWT PERSONNEL TRAINING SPECIFIC SAMG ENC Director Office Manager

° Logistics & Production Coordinator Logistics & Production Assistant Rumor Control Supervisor

°_*

ENC Technical Spokesperson ENC Technical Spokesperson Assistant 0_*_

Media Montoring/Response Supervisor 0

Media Monitoring Assistant 0_*

° Media Response Assistant 0

_° Govemment Affairs Coordinator ENC Secretary Audio Visual Operator Offsite Agency Coordinator St. Chades PR Representative a

St. John PR Representative Corporate Emergency Center Manager

° Secur SAMG I

I I