RBG-46479, Supplement to Amendment Request Corrections to Loss of Power Instrumentation Requirements

From kanterella
Jump to navigation Jump to search

Supplement to Amendment Request Corrections to Loss of Power Instrumentation Requirements
ML052790099
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/13/2005
From: King R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-46479
Download: ML052790099 (4)


Text

Entergy Operations, Inc.

River Bend Station 5485 U. S. Highway 61 N

- Entergy St. Francisville, LA 70775 Tel 225 336 6225 Fax 225 635 5068 rking~entergy.com Rick J. King Director, Nuclear Safety Assurance RBG-46479 September 13, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Supplement to Amendment Request Corrections to Loss of Power Instrumentation Requirements River Bend Station, Unit 1 Docket No. 50-458 License No. NPF-47

REFERENCES:

Letter RBG-46474, from Paul D. Hinnenkamp to USNRC, "License Amendment Request - Corrections to Loss of Power Instrumentation Requirements," dated August 31, 2005

Dear Sir or Madam:

By the letter referenced above, Entergy Operations, Inc. (Entergy) proposed a change to the River Bend Station, Unit I (RBS) Technical Specifications (TSs) to revise certain requirements for the Loss of Power (LOP) instrumentation listed in TS Table 3.3.8.1-1.

On September 13, Entergy and members of your staff held a call to discuss the proposed changes. As a result of the call, it was determined that additional information was needed to complete the review and that the review could not be completed as requested on an exigent basis. However, it was also concluded that sufficient information was available in the original request to review the proposed changes for a limited application to the remaining operating cycle. Entergy is therefore revising the proposed changes to TS Table 3.3.8.1-1 to provide a one-time relaxation of the Loss of Power (LOP) instrumentation requirements rather than a permanent relaxation as previously proposed. River Bend's next refueling outage is scheduled for spring 2006. The TS changes would be applicable through June 1, 2006. A mark-up of the revised TS changes are provided in Attachment 1 of this submittal.

The original no significant hazards consideration included in Reference I is not affected by any information contained in the supplemental letter. The scope of the proposed changes has not been altered. The proposed revision only affects the period of time for which the changes will be in effect. There are no new commitments contained in this letter.

If you have any questions or require additional information, please contact Ron Byrd at 601-368-5792.

PA D l

RBG-46479 Page 2 of 2 I declare under penalty of perJury that the foregoing is true and correct. Executed on September 13, 2005.

Sincerely, RJK/RWB/rwb Attachments:

1. Proposed Technical Specification Changes (mark-up) cc: Dr. Bruce S. Mallett U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector P. 0. Box 1050 St. Francisville, LA 70775 U.S. Nuclear Regulatory Commission Attn: Mr. Michael K. Webb MS O-7D1 Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam MS 0-7D1 Washington, DC 20555-0001 Louisiana Department of Environmental Quality Office of Environmental Compliance

.Attn: Mr. Ronnie Wascom Surveillance Division P. 0. Box 4312 Baton Rouge, LA 70821-4312

I . . I Attachment I To RBG-46479 Proposed Technical Specification Changes (mark-up)

4 . £ ,

Attachment 1 to RBG-46479 Page 1 of I LOP Instrumentation 3.3.8.1

&MtSu AWLXc PIIOWABLE FU¢C104

_ Oed RSQI1UMS VALUE

1. bIali2 4.wiZW~s.

LdVdbp.41OIbvis S SR 32j.1 22MOVand'2WY SR SR &3.l4 US3I4 SR 33r.

3 23 2

SR 3.3.13tis 1 3.3 SR 3.35.L4 C zMd*0*4I5dWbam. 3 SR aZI.1.1 12U3iVxv S3M32 V SR 13..1.2 SR 311.3 SR 132.1.4

[Sg; da.T uavo 3 teio4 g &1 a4-sad 54 130 Cmasawdg SR 13381,4

a. tzdVo*d -TvDhy. SR 338.1 2S.7 SR 31BA3 57acmsew SR 33.1.14 2 Dwwn 3 -4.15 IV Exw;- qcb a LumdVp.tk18W~b 2 SR ISAIAt 31tV"n SV SR 3111.3 SR 33.1 A
h. sdW * .liOw 2 SW13.11 227~ itN SR 3.U.1.14 S .1 esotMdft L DOra~dVtag.-4.1hVW&o 2 SR 331.1.1 !3S4.CVwWM212V SR 33.21I SR 333t11 SR 32S14
d. fdVabC.TmDuO f.M, 2 SaR +/--U Z51p4 i SR 31113 SST SR 2I.31.4 L 2 SR&3a&12 .Z4im arWd SR 3.1112 15.7wands SR 2.3 LI4

' On a one-time basis, the Required Channcls Pcr Division Is changed from to -1" for Funcions L.b. t.d, and I e. Also on a one-time basis, the requirerents of SR 3.3.8.1.2 are not appLicable to Functions I.b, l.d, I.e. and 2.d. lbesc one-timc chances expire on Junc 1, 2006.

RWERi3END 3.3-74 3menamerA No. 8e-i.5. 128