Category:Letter type:RBG
MONTHYEARRBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report RBG-48221, 2022 Annual Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Radiological Environmental Operating Report RBG-48142, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-27027 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RBG-48198, Report of Changes and Errors to 10CFR50.462022-09-22022 September 2022 Report of Changes and Errors to 10CFR50.46 RBG-48187, Notification of Spent Fuel Cask Use2022-08-15015 August 2022 Notification of Spent Fuel Cask Use RBG-48184, Notification of Spent Fuel Cask Use2022-07-18018 July 2022 Notification of Spent Fuel Cask Use RBG-48178, Notification of Spent Fuel Cask Use2022-06-29029 June 2022 Notification of Spent Fuel Cask Use RBG-48166, Supplement to Special Report for Tritium Discovered Onsite2022-05-12012 May 2022 Supplement to Special Report for Tritium Discovered Onsite RBG-48149, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report RBG-48148, 2021 Annual Radiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Radiological Environmental Operating Report RBG-48134, Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency2021-11-29029 November 2021 Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency RBG-48136, Additional Information for the 2020 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2020 Annual Radioactive Effluent Release Report RBG-48137, Additional Information for the 2019 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2019 Annual Radioactive Effluent Release Report RBG-48128, Reply to a Notice of Violation; EA-21-017, 030 and 0502021-10-29029 October 2021 Reply to a Notice of Violation; EA-21-017, 030 and 050 RBG-48129, Payment of a Civil Penalty2021-10-21021 October 2021 Payment of a Civil Penalty RBG-48112, Report of Changes and Errors to 10CFR50.462021-09-16016 September 2021 Report of Changes and Errors to 10CFR50.46 RBG-48110, Core Operating Limits Report (COLR) - Cycle 22, Revision 12021-08-19019 August 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 1 RBG-48104, Fitness for Duty Blind Quality Assurance Specimen Testing Error2021-06-30030 June 2021 Fitness for Duty Blind Quality Assurance Specimen Testing Error RBG-48099, Submittal of Owner'S Activity Report Form for Cycle 212021-06-16016 June 2021 Submittal of Owner'S Activity Report Form for Cycle 21 RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials RBG-48093, Corrected 2020 Annual Radiological Environmental Operating Report2021-05-20020 May 2021 Corrected 2020 Annual Radiological Environmental Operating Report RBG-48082, 2020 Annual Radiological Environmental Operating Report2021-04-20020 April 2021 2020 Annual Radiological Environmental Operating Report RBG-48081, 2020 Annual Radioactive Effluent Release Report2021-04-20020 April 2021 2020 Annual Radioactive Effluent Release Report RBG-48078, Core Operating Limits Report (COLR) - Cycle 22, Revision 02021-03-14014 March 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 0 RBG-48075, Notification of Deviation from BWRVIP Guidelines2021-02-24024 February 2021 Notification of Deviation from BWRVIP Guidelines RBG-48074, Spent Fuel Storage Radioactive Effluent Release Report for 20202021-02-22022 February 2021 Spent Fuel Storage Radioactive Effluent Release Report for 2020 RBG-48061, One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-12-0303 December 2020 One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency RBG-48054, Application to Adopt GL 86-10 Standard License Condition for Fire Protection Program2020-11-0202 November 2020 Application to Adopt GL 86-10 Standard License Condition for Fire Protection Program RBG-48049, Reply to a Notice of Violation; EA-20-0582020-10-26026 October 2020 Reply to a Notice of Violation; EA-20-058 RBG-48038, Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to Covid 19 Pandemic2020-10-0606 October 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to Covid 19 Pandemic RBG-48042, Submittal of Rev. 48 to Emergency Plan2020-09-22022 September 2020 Submittal of Rev. 48 to Emergency Plan RBG-48039, Report of Changes and Errors to 10CFR50.462020-09-16016 September 2020 Report of Changes and Errors to 10CFR50.46 RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-0404 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RBG-48023, Submittal of Revs. 46 and 47 to Emergency Plan and Revised Emergency Implementing Procedures2020-06-0909 June 2020 Submittal of Revs. 46 and 47 to Emergency Plan and Revised Emergency Implementing Procedures RBG-48019, 2019 Annual Radioactive Effluent Release Report2020-04-30030 April 2020 2019 Annual Radioactive Effluent Release Report RBG-48020, Annual Radiological Environmental Operating Report2020-04-30030 April 2020 Annual Radiological Environmental Operating Report RBG-48018, Withdrawal of License Amendment Request to Extend the RBS Emergency Plan Implementation Date2020-04-24024 April 2020 Withdrawal of License Amendment Request to Extend the RBS Emergency Plan Implementation Date 2024-01-12
[Table view] Category:Licensee Response to Enforcement Action
[Table view] |
Text
entergy Phil Hansett Site Vice President River Bend Station 225-381-4374 RBG-48247 10 CFR 2.201 August 21, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Reply to Notice of Violation; EA-23-055 River Bend Station, Unit 1 NRG Docket No. 50-458 Renewed Facility Operating License No. NPF-47
Reference:
NRG letter to Entergy, "River Bend Station - Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRG Inspection Report 05000458/2023091,"
(ADAMS Accession No. ML23187A639), dated July 20, 2023.
In accordance with 10 CFR 2.201, Entergy Operations, Inc. (Entergy) hereby submits the Reply to Notice of Violation, EA-23-055, for River Bend Station, Unit 1 (River Bend). As requested, the Enclosure contains the following: (1) the reason for the violation; (2) the corrective steps that have been taken and the results achieved; (3) the corrective steps that will be taken; and (4) the date when full compliance will be achieved.
This letter contains no new commitments.
Should you have any questions concerning this issue, please contact Randy Crawford, Manager, Regulatory Assurance, at 225-381-4177.
Respectfully, Phil Hansett PH/ hpk Entergy Operations, Inc., 5485 U.S. Highway 61 N. St. Francisville, LA 70775
RBG-48247 Page 2 of 2
Enclosure:
Reply to Notice of Violation; EA-23-055 cc: NRC Regional Administrator - Region IV NRC Senior Resident Inspector - River Bend Station NRC Document Control Desk R4Enforcement@nrc.gov
Enclosure RBG-48247 Reply to Notice of Violation; EA-23-055
RBG-48247 Enclosure Page 1 of 2 Reply to Notice of Violation EA-23-055 In the U.S. Nuclear Regulatory Commission (NRC) letter to Entergy Operations, Inc. (Entergy),
"River Bend Station - Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091," (ADAMS Accession No. ML23187A639), dated July 20, 2023, the NRC issued Notice of Violation EA 055 to Entergy's River Bend Station (River Bend) as restated below:
Technical Specification 5.4.1 .a, requires, in part, that written procedures shall be established, implemented, and maintained covering the activities recommended in Regulatory Guide 1.33, "Quality Assurance Program Requirements (Operational)" revision 2, Appendix A. Regulatory Guide 1.33, revision 2, Appendix A, section 9.a, requires, in part, that maintenance that can affect the performance of safety-related equipment should be properly preplanned and performed in accordance with written procedures, or documented instructions appropriate to the circumstances.
The licensee established Work Order 53003640 to clean, inspect, and test high pressure core spray transformer E22-S003. Work Order 53003640 step 4.1.1O requires, in part, to inspect all wiring for signs of degradation, cracked insulation and overheating, and step 4.1.13 requires, in part, to inspect for loose nuts, bolts, set screws or other fasteners.
Contrary to the above, on June 21, 2022, the licensee failed to implement procedures recommended by Regulatory Guide 1.33, revision 2, Appendix A. Specifically, when performing a cleaning and inspection of high pressure core spray Transformer E22-S003, the licensee failed to adequately perform Work Order 53003640 step 4.1.1 O to inspect all wiring for signs of degradation, cracked insulation and overheating, and step 4.1 .13 to inspect for loose nuts, bolts, set screws, or other fasteners. As a result, the transformer failed, causing the high pressure core spray system and standby service water pump SWP-P2C to be inoperable.
Pursuant to the provisions of 10 CFR 2.201, this Enclosure provides Entergy's Reply to Notice of Violation, EA-23-055.
- 1) Reason for the Violation On September 19, 2022, while performing STP-309-0203, Division (DIV) Ill Diesel Generator Operability Test, the DIV Ill Diesel Generator was started and approximately 5 seconds later the Main Control Room received multiple alarms on DIV Ill components. Field operators reported that E22-S003, High Pressure Core Spray (HPCS) Transformer Feeder showed signs of overheating.
A Root Cause Evaluation (RCE) and an Equipment Failure Evaluation was conducted, which determined that the direct cause for the E22-S003 HPCS Transformer fault was caused by a spare conductor of cable 1 CSHCOK300 landing on top of the low voltage windings creating a fault, requiring replacement of the transformer.
The RCE determined the root cause for the HPCS Transformer Failure is "Maintenance Electrical work processes (procedure and training) did not require use of intrusive methods to
RBG-48247 Enclosure Page 2 of 2 identify degradation in wiring and / or connections in E22-S003 HPCS transformer, resulting in failure of E22-S003 HPCS transformer."
- 2) Corrective Steps That Have Been Taken and the Results Achieved Entergy took appropriate actions by installing a replacement transformer per Temporary Modification (TMOD) EC 93841 under Work Order (WO) 586001, which also verified no loose wires were present in an "as-left" condition.
- 3) Corrective Steps That Will Be Taken
- Corrective actions are in place to determine a permanent solution to the E22-S003 transformer.
- Corrective Actions to Prevent Reoccurrence (CAPR) are as follows:
o Revise the Preventative Maintenance (PM) Model WO 50348709 / PMRQ 50037101-01 to include the use of intrusive methods to identify degradation in wiring and I or connections in E22-S003 HPCS transformer.
o Revise Training Qualification Card FQC-EMT1-CURRENTXTXFRMR to include more specifics on performing inspections on all wiring connections of dry transformers and to include CR-RBS-2023-00412 as referenced Operating Experience (OE).
- 4) Date When Full Compliance Will Be Achieved The station achieved full compliance on September 30, 2022, when the E22-S003 HPCS Transformer was installed, returned to service, and the station exited the 14-day LCO Action Statement.