RBG-48258, Notification of Readiness for Supplemental Inspection

From kanterella
Jump to navigation Jump to search
Notification of Readiness for Supplemental Inspection
ML23278A239
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/05/2023
From: Hansett P
Entergy Operations
To:
Office of Nuclear Reactor Regulation, NRC Region 4, Document Control Desk
References
RBG-48258
Download: ML23278A239 (1)


Text

entergy Philip Hansett Site Vice President River Bend Station 225-381-4374 RBG-48258 October 5, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Notification of Readiness for Supplemental Inspection River Bend Station - Unit 1 NRC Docket Nos. 50-458 Renewed Facility Operating License No. NPF-47

Reference:

NRC letter to Entergy, "EA-23-055: River Bend Station - Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091," (ADAMS Accession No ML23187A639) dated July 20, 2023 By letter dated July 20, 2023, the Nuclear Regulatory Commission (NRC) determined the performance at River Bend Station (RBS) to be within the Regulatory Response Column of the NRC's Action Matrix.

In the referenced letter, the NRC announced its intent to conduct a supplemental inspection in accordance with Inspection Procedure 95001 following a notification of readiness from RBS.

This letter serves as the notification of readiness for the NRC to perform the supplemental inspection at RBS.

This document contains no commitments. Should you have any questions, please contact Mr.

Randy Crawford, Regulatory Assurance Manager, at 225-381-4177.

Respectfully, Philip Hansett PH/twf cc: NRC Region IV Regional Administrator - Region IV

  • NRC Senior Resident Inspector - River Bend Station Entergy Operations, Inc., 5485 Li.s. Highway 61 N. st. Francisville,