AECM-82-304, Responds to NRC Re Violations Noted in IE Insp Rept 50-416/82-40.Corrective Actions:Craft Personnel Trained on Intent & Mechanics of Procedure 01-5-06-3.All Control Cabinets & Controlling Access Locked by Shift Supervisor

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-416/82-40.Corrective Actions:Craft Personnel Trained on Intent & Mechanics of Procedure 01-5-06-3.All Control Cabinets & Controlling Access Locked by Shift Supervisor
ML20058C024
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/06/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20058C004 List:
References
AECM-82-304, NUDOCS 8207260231
Download: ML20058C024 (2)


Text