ML20058C032

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-416/82-40 on 820419-0514 & Notice of Violation
ML20058C032
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/04/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20058C004 List:
References
NUDOCS 8207260235
Download: ML20058C032 (2)


See also: IR 05000416/1982040

Text

.

_ ._

_

.-

.

,

,

,

,

l[l{La~~

t

.

JUN 041982

Mississippi Power and Light Company

ATTN: Mr. N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

Subject:

Report No. 50-416/82-40

This refers to the routine safety inspection conducted by Mr. A. G. Wagner of

this office on April 19 - May 14, 1982, of activities authorized by NRC

Construction Permit No. CPPR-118 for the Grand Gulf facility. Our preliminary

findings were discussed with Mr. C. L. Stuart, Assistant Plant Manager, at the

I

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

4

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of. Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved . items.

The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Roan unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

,

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

8207260235 820714

PDR ADOCK 05000416

G

PDR

.. - .

- - . - -

.

.

Missis'sippi Power & Light Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C

R. C. Lewis, Director

Division of Project and

Resident Programs

Enclosures:

1.

Appendix A. Notice of Violation

2.

Inspection Report No. 50-416/82-40

cc w/encls:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bcc w/encls:

NRC Resident Inspector

Document Management Branch

State of Mississippi

RII

RII

RII

RI

h

h

Y

e

i

ftAWagner:dt

RButpher

FCantrell

ng

(

5/lV182

5/18/82

$/ Ll82

// /82