05000369/LER-1982-078, Forwards LER 82-078/03L-0

From kanterella
(Redirected from 05000369/LER-1982-078)
Jump to navigation Jump to search
Forwards LER 82-078/03L-0
ML20070F430
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 12/08/1982
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20070F432 List:
References
NUDOCS 8212210145
Download: ML20070F430 (1)


LER-2082-078, Forwards LER 82-078/03L-0
Event date:
Report date:
3692082078R00 - NRC Website

text

. .

p.- Y.

. DUKE POWER GOMPANY P.O. HOX 33180 CHARI.OTTE, N.C. 28242 HALH. TUCKER Teternown VICE PRESIDENT (704)373-4531 ans. Ram emoDorrios December 8, 1982 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission a Region II .

101 Marietta Street, Suite 3100 ', . -;

Atlanta, Georgia 30303 3 0

5. 1 Re: McGuire Nuclear Station Unit 1 Docket No. 50-369 3

Dear Mr. O'Reilly:

cc Please find attached Reportable Occurrence Report R0-369/82-78. This report concerns T.S. 3.1.2.1, "As a minimum, one of the following boron injection flow paths shall be operable:...", and T.S. 3.1.2.3, "One charging pump in the boron injection flow path required by Specification' 3.1.2.1 shall be operable...". This incident was considered to be of no significance with respect to the health and safety of the public.

Very truly yours, C g.d Ah-s b-Hal B. Tucker PBN:jfw Attachment cc: Document Control Desk INFO Records Center U. S. Nuclear Regulatory Commission Suite 1500 Washington, D. C. 20555 1100 circle 75 Parkway Atlanta, Georgia 30339 Senior Resident Inspector McGuire Nuclear Station W$CIALCOPjM, 8212210145 821208

_ @ 42; PDR ADOCK 05000369 0 PDR

_ _ - - - - _ _-