05000369/LER-1982-056, Forwards LER 82-056/01T-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-056/01T-0
ML20071K333
Person / Time
Site: McGuire Duke energy icon.png
Issue date: 07/20/1982
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20071K336 List:
References
NUDOCS 8208020075
Download: ML20071K333 (2)


LER-2082-056, Forwards LER 82-056/01T-0
Event date:
Report date:
3692082056R00 - NRC Website

text

, _ - -

- =

Duxe POWER COMPANY Powza Bmtorno 422 Sourn Cnuncu Srazzr, Crunwriz, N. C. asa4a WI W A84 O. PAR M E R, J R. _ July 20, 1982 Vice ParstDENT TELCPMONt:Anta 704 Svgaae PnocuctioN 373-4083 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: McGuire Nuclear Station Unit 1

Docket No. 50-369

Dear Mr. O'Reilly:

1

Please find attached Reportable Occurrence Report R0-369/82-56. This report

_ concerns T.S.6.9.1.12(i), " Performance of structures, systems, or components that requires remedial action _or corrective _ measures to prevent operation in a manner-less conservative than-assumed in the accident analyses in the safety.

! analysis report or technical specifications bases; or discovery during unit-i life of conditions not specifically considered in the safety analysis report or_ technical specifications that require remedial action or corrective measures

{

to prevent the existence or_ development of an unsafe condition".' This~ incident-4 was considered to be of no significance with respect to the health and safety of the public.

I l . Note that while the enclosed LER form indicates that an attachment to the form i is_being submitted (Item No. 23), no attachment is enclosed. Instead, Mr. W. O.

! -Parker,-Jr.'s (DPC) letters to Mr.'H. R. Denton (NRC/0NRR)-of July 13 and 14, 1982 are to be considered'the attached detailed report for this LER. The July 13 letter details the examinations and evaluations performed by Duke Power Company

, and Westinghouse Electric Corporation with regards.to this event, and provides I

the conclusions. The July 14 letter details interim actions to continue uatil the affected thermal sleeves are removed which Duke Power Company agreed to during discussions with the NRC staff on July 14, 1982.

Ve truly yours, I m

tu s c.-

- - - O, .

k,-  :-::

William 0.- Parker, Jr g-PBN/j fw _3 _ 1(

Attachment cc i, g

.. c~

y 2 cx e

. gyFICIAL COPY 8208020075 820720 b 4

PDR ADOCK 05000369 S PDR l

James P. O'Reilly July 20, 1982 Page 2 cc: Director Records Center Office of Management and Program Analysis Institute of Nuclear Power Operations U. S. Nuclear Regulatory Commission 1820 Water Place Washington, D. C. 20555 Atlanta, Georgia' 30339 Mr. P. R. Bemis Senior Resident Inspector Mc Guire Nuclear Station i