MONTHYEARML20236B7361987-10-20020 October 1987 Advises That LER 369/87-20 Re RHR Pump Being Inoperable for Greater than 72 H Will Be Submitted on 871027,due to Unresolved Concerns 05000369/LER-1984-030, Suppl to LER 84-030:review Revealed Installation Error That Would Result in Failure of Upper Head Injection Accumulator Discharge Valves to Isolate on Low Level.Analysis of Safety Significance & Encl1984-12-19019 December 1984 Suppl to LER 84-030:review Revealed Installation Error That Would Result in Failure of Upper Head Injection Accumulator Discharge Valves to Isolate on Low Level.Analysis of Safety Significance & Encl 05000369/LER-1984-024, Revised Page 6 to LER 84-024-01,providing Corrective Actions.Relay House Emergency Lighting Improved,Operating & Maint Activities Reviewed for Potential Impact on Offsite Power & Switchyard Computer Will Be Replaced by Mar 19881984-11-0909 November 1984 Revised Page 6 to LER 84-024-01,providing Corrective Actions.Relay House Emergency Lighting Improved,Operating & Maint Activities Reviewed for Potential Impact on Offsite Power & Switchyard Computer Will Be Replaced by Mar 1988 ML20081M7531983-11-0707 November 1983 Ler 83-064/99T-0:on 831024,Westinghouse Notified Util of Potentially Defective Relays SA1.Relay Used in Class IE Switchgear for Diesel Generator Protection & May Cause False Trip Output to Diesel Generator.Caused by Mfg Deficiency 05000369/LER-1982-0451982-06-30030 June 1982 LER 82-045/03L-0:on 820527,HEPA & Carbon Adsorber Filters Periodic Test Revealed That Carbon Adsorber Filters on Auxiliary Bldg Ventilation Sys Failed to Pass Freon Penetration Test.Caused by Carbon Settlement 05000369/LER-1982-0441982-06-30030 June 1982 LER 82-044/03L-0:on 820526,HEPA & Carbon Adsorber Filters Periodic Test Revealed That Auxiliary Bldg Ventilation Sys Filters Failed to Pass Total DOP Penetration Test.Caused by Vibration 05000369/LER-1982-0431982-06-30030 June 1982 LER 82-043/03L-0:on 820520,HEPA & Carbon Absorber Filters Periodic Test Indicated Carbon Absorber Filter on Fuel Pool Ventilation Sys Failed to Pass Freon Penetration Test. Caused by High Humidity.Filters Replaced 05000369/LER-1982-0421982-06-30030 June 1982 LER 82-042/03L-0:on 820519,HEPA & Carbon Filters Periodic Test Revealed That HEPA after-filters on Train B of Annulus Ventilation Sys Failed to Pass Dioctyl Phthalate Penetration Test.Caused by Dirt in Filter 05000369/LER-1982-0411982-06-30030 June 1982 LER 82-041/03L-0:on 820513,HEPA & Carbon Absorber Filters Periodic Test Revealed That Carbon Absorber Filter on Train a of Annulus Ventilation Sys Failed to Pass Halogenated Hydrocarbon Penetration Test.Caused by Dirt in Filter 05000369/LER-1982-0371982-06-30030 June 1982 LER 82-037/03L-0:on 820513,while in Mode 1,performance of Nuclear Air Cleaning Sys Air Flow Measurement Periodic Test Revealed That Train a of Annulus Ventilation Sys Failed to Meet Flow Acceptance Criteria.Caused by Component Failure 05000369/LER-1982-0191982-03-30030 March 1982 LER 82-019/03L-0:on 820228,during Mode 4,performance of RCS Pressure Isolation Valve Leak Rate Test Determined That 3 Valves Failed Test.Caused by Failure of Valves to Seat Properly.Valves Disassembled & Repaired 1987-10-20
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B4131998-09-22022 September 1998 Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage ML20151W3521998-09-0808 September 1998 Special Rept 98-01:on 980819,maint Could Not Be Performed on FPS Due to Isolation Boundary Leakage.Caused by Inadequate Info Provided in Fire Impairment Plan.Isolated Portion of FPS Was Returned to Svc ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236U1601998-07-31031 July 1998 Non-proprietary DPC-NE-2009, DPC W Fuel Transition Rept ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236P0451998-07-0808 July 1998 Part 21 Rept Re non-conformance & Potential Defect in Component of Nordberg Model FS1316HSC Standby Dg.Caused by Outer Spring Valves Mfg from Matl That Did Not Meet Specifications.Will Furnish Written Rept within 60 Days 1999-09-30
[Table view] |
LER-2082-044, |
Event date: |
|
---|
Report date: |
|
---|
3692082044R00 - NRC Website |
|
text
- __ ___
enc POR.4 3 5 '
U. s. NUCLEAR R.cutATORY Coh.asissaced a.m LICENSEE EVENT REPORT EXHIBIT A conTnot. stoex: l l l 1 i l l .l@ (Pt. EASE PRINT OR TYPE ALL REcuiRED INFORMATIQW I a i l l
. I N .luc.ms..
. c l Mcoo. l G I S l 1 l@1.l0 l0 ucam..
- i. l - 10um..a IO l0 l 010 l a-IOal 0 ucam.a l@l4 I1l1Illll@l n,. a ucara@
con T E
- . "o'u%. Q.l0! 51 010 s
.i ooca.1 10l ll 614 @l o f 51216 um..a .v.ar car.l 812 @l0rsI 61310
- 1. l 8 l 2.=l@
a., car onr.
svewr cascaimom Ano PRoeAsta coussouancas @
o 2 lPerformance of the "in-place test of HEPA and carbon adsorber filters"'periodict ITTTIltest revealed that the auxiliary buildinn ventilation (VA) system filters failed o Ito pass their total DOP penetration test. The VA system was declared inoperab1p TTITI l uer T.S. 3.7.7 which is reportable per T.S. 6.9.1.13(b). No credit is taken in; ITT.1 I ca fety analysis calculations for tho VA filter systems. Even so, the filterc g o 7 Iwould have' functioned had it been necessarv since the effectiveness of the l Lo_L. ] I fi l t e rs wa s onl y slichriv dominished. Health and safety of the public were un-f
..aH cted.,;m , w c ,, ,,, c ;g.
loist l A I A l@ l Ej@ l X l@ l XIX l X l XI Xl Xl@ &[,Zj @ l Z j @
, . . .. i. ,, i. , .._ . ,
_ occu.. , ..
- n. rv ..o.u.rr., i.
coo. c. n
@ ,,"u ,,,.o 18 12 l 3 _2i 22 i-l 23 10 f4l 4l
- 2. 28 l/l 27 I 013 l 3 3 W
J.
[--j 21 l0 l 22
= =: oft s == u l 0 l Of Oqf t l T. v .:' ,or.:t
~,c,:s r =:, = ..
Ml_Z.j@ mlZl@
23 2.
lZ a
j@ ]@ l N j@ [Ll@ lZl9l9I9l@
22 .o .. . . ,
cAuse oescaimon AssoecRReenve Actions @
ITT71 IThe bypass dampers were not sealing properly when closed. In addition, an t m lonening or crack was discovered where the filter housing unit connects to the i L'_L13 Iconcrete. Both of these are helieved to be the result of vibration during the1 L' L ! lunit's onerntion. After 1diustine the dampers and sealine the openine with RTVI iii.i[ sealant, the test was performed satisfactorily and the system declared operablq
.,gg,,May 26, 1982. _,
svana s ,o-.a or ...ravu. @ o.co ... ei. cow.- ooc,,,,vio,. @
ii#sIl.Lj @ l01 71 si@l N/A l~ lBl@l DOP Penetration Test l
. j.ny,,, ,gg,,,,, is is
..uA... e. ..u . u N/A ,o, .onv,1v @ l mr, .. ..u .@
Lu.a.J N/A
,. c '.t u,o.O "
u ... n,. ooc,.,,rio,. @
ITTT1 In I n I nl@Ld@l N/A l
.mo .'a,uu'.?.o
u ...
l t i. l l 0 l 0 l 0l@l ooc.,,rio N @/A l
.. n $2
'nT. # " ."$nMo', ''"" @
M l3,j@l N/A l
issu. .SCR',vle MAC USE ONLY r
2 o
. Nj@l
[
i.
N/A l l[fIill!ll[l[
Naus cs PREPARER Phillip B. Nardoci ,,,cu,. ( 7 0 4 ) 373-7432 8207090147 820630 PDR ADOCK 05000369 S PDR
____
|
---|
|
|
| | Reporting criterion |
---|
05000369/LER-1982-007, Forwards LER 82-007/03L-0.Detailed Event Analysis Encl | Forwards LER 82-007/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-009, Forwards LER 82-009/03L-0 | Forwards LER 82-009/03L-0 | | 05000369/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Encl | Forwards LER 82-010/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-011, Forwards LER 82-011/03L-0 | Forwards LER 82-011/03L-0 | | 05000369/LER-1982-019 | LER 82-019/03L-0:on 820228,during Mode 4,performance of RCS Pressure Isolation Valve Leak Rate Test Determined That 3 Valves Failed Test.Caused by Failure of Valves to Seat Properly.Valves Disassembled & Repaired | | 05000369/LER-1982-020, Forwards LER 82-020/03L-0 | Forwards LER 82-020/03L-0 | | 05000369/LER-1982-021, Forwards LER 82-021/03L-0 | Forwards LER 82-021/03L-0 | | 05000369/LER-1982-033, Forwards LER 82-033/03L-0 | Forwards LER 82-033/03L-0 | | 05000369/LER-1982-034, Forwards LER 82-034/03L-0 | Forwards LER 82-034/03L-0 | | 05000369/LER-1982-035, Forwards LER 82-035/03L-0 | Forwards LER 82-035/03L-0 | | 05000369/LER-1982-036, Forwards LER 82-036/03L-0 | Forwards LER 82-036/03L-0 | | 05000369/LER-1982-037 | LER 82-037/03L-0:on 820513,while in Mode 1,performance of Nuclear Air Cleaning Sys Air Flow Measurement Periodic Test Revealed That Train a of Annulus Ventilation Sys Failed to Meet Flow Acceptance Criteria.Caused by Component Failure | | 05000369/LER-1982-038, Forwards LER 82-038/03L-0 | Forwards LER 82-038/03L-0 | | 05000369/LER-1982-039, Forwards LER 82-039/01T-0.Detailed Event Analysis Encl | Forwards LER 82-039/01T-0.Detailed Event Analysis Encl | | 05000369/LER-1982-040, Forwards LER 82-040/03L-0 | Forwards LER 82-040/03L-0 | | 05000369/LER-1982-041 | LER 82-041/03L-0:on 820513,HEPA & Carbon Absorber Filters Periodic Test Revealed That Carbon Absorber Filter on Train a of Annulus Ventilation Sys Failed to Pass Halogenated Hydrocarbon Penetration Test.Caused by Dirt in Filter | | 05000369/LER-1982-042 | LER 82-042/03L-0:on 820519,HEPA & Carbon Filters Periodic Test Revealed That HEPA after-filters on Train B of Annulus Ventilation Sys Failed to Pass Dioctyl Phthalate Penetration Test.Caused by Dirt in Filter | | 05000369/LER-1982-043 | LER 82-043/03L-0:on 820520,HEPA & Carbon Absorber Filters Periodic Test Indicated Carbon Absorber Filter on Fuel Pool Ventilation Sys Failed to Pass Freon Penetration Test. Caused by High Humidity.Filters Replaced | | 05000369/LER-1982-044 | LER 82-044/03L-0:on 820526,HEPA & Carbon Adsorber Filters Periodic Test Revealed That Auxiliary Bldg Ventilation Sys Filters Failed to Pass Total DOP Penetration Test.Caused by Vibration | | 05000369/LER-1982-045 | LER 82-045/03L-0:on 820527,HEPA & Carbon Adsorber Filters Periodic Test Revealed That Carbon Adsorber Filters on Auxiliary Bldg Ventilation Sys Failed to Pass Freon Penetration Test.Caused by Carbon Settlement | | 05000369/LER-1982-047, Forwards LER 82-047/03L-0 | Forwards LER 82-047/03L-0 | | 05000369/LER-1982-048, Forwards LER 82-048/03L-0 | Forwards LER 82-048/03L-0 | | 05000369/LER-1982-049, Forwards LER 82-049/03L-0 | Forwards LER 82-049/03L-0 | | 05000369/LER-1982-050, Forwards LER 82-050/03L-0 | Forwards LER 82-050/03L-0 | | 05000369/LER-1982-051, Forwards LER 82-051/03L-0.Detailed Event Analysis Encl | Forwards LER 82-051/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-052, Forwards LER 82-052/03L-0.Detailed Event Analysis Encl | Forwards LER 82-052/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-053, Forwards LER 82-053/03L-0.Detailed Event Analysis Encl | Forwards LER 82-053/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-054, Forwards LER 82-054/03L-0 | Forwards LER 82-054/03L-0 | | 05000369/LER-1982-055, Forwards LER 82-055/03L-0 | Forwards LER 82-055/03L-0 | | 05000369/LER-1982-056, Forwards LER 82-056/01T-0 | Forwards LER 82-056/01T-0 | | 05000369/LER-1982-057, Forwards LER 82-057/03L-0 | Forwards LER 82-057/03L-0 | | 05000369/LER-1982-058, Forwards LER 82-058/03L-0.Detailed Event Analysis Encl | Forwards LER 82-058/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-059, Forwards LER 82-059/03L-0 | Forwards LER 82-059/03L-0 | | 05000369/LER-1982-060, Forwards LER 82-060/03L-0 | Forwards LER 82-060/03L-0 | | 05000369/LER-1982-061, Forwards LER 82-061/03L-0.Detailed Event Analysis Encl | Forwards LER 82-061/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-062, Forwards LER 82-062/03L-0 | Forwards LER 82-062/03L-0 | | 05000369/LER-1982-063, Forwards LER 82-063/03L-0 | Forwards LER 82-063/03L-0 | | 05000369/LER-1982-065, Forwards LER 82-065/03L-0.Detailed Event Analysis Encl | Forwards LER 82-065/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-066, Forwards LER 82-066/03L-0.Detailed Event Analysis Encl | Forwards LER 82-066/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-068, Forwards LER 82-068/03L-0 | Forwards LER 82-068/03L-0 | | 05000369/LER-1982-069, Forwards LER 82-069/03L-0.Detailed Event Analysis Encl | Forwards LER 82-069/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-070, Forwards LER 82-070/03L-0 | Forwards LER 82-070/03L-0 | | 05000369/LER-1982-072, Forwards LER 82-072/03L-0 | Forwards LER 82-072/03L-0 | | 05000369/LER-1982-074, Forwards LER 82-074/03L-0.Detailed Event Analysis Encl | Forwards LER 82-074/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-075, Forwards LER 82-075/03L-0 | Forwards LER 82-075/03L-0 | | 05000369/LER-1982-076, Forwards LER 82-076/03L-0 | Forwards LER 82-076/03L-0 | | 05000369/LER-1982-077, Forwards LER 82-077/03L-0 | Forwards LER 82-077/03L-0 | | 05000369/LER-1982-078, Forwards LER 82-078/03L-0 | Forwards LER 82-078/03L-0 | | 05000369/LER-1982-079, Forwards LER 82-079/03L-0 | Forwards LER 82-079/03L-0 | |
|