05000369/LER-1982-038, Forwards LER 82-038/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-038/03L-0
ML20054K112
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/23/1982
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20054K113 List:
References
NUDOCS 8207010091
Download: ML20054K112 (1)


LER-2082-038, Forwards LER 82-038/03L-0
Event date:
Report date:
3692082038R00 - NRC Website

text

%

o DUKE POWER COMPANY Powen Dun.nino 422 Souris Gnuncu Srneer, Giuawriz, N. C asa4a wf LLI AM O. PAR M ER. J R.

June 23, 1982 $ D_

. 77 v.cr PRt5sDtNT Ttttemo m E A 704,* 'd Strau PaooucTeon 3-4097 93 s Mr. James P. O'Reilly, Regional Administrator 'M U. S. Nuclear Regulatory Commission fy'$

Region II .. -

101 Marietta Street, Suite 3100 _,Z

'J g

Atlanta, Georgia 30303 cm -

Re: McGuire Nuclear Station Unit 1 Docket No. 50-369 ,"

Dear Mr. O'Reilly:

Please find attached Reportable Occurrence Report R0-369/82-38. This report concerns T.S.4.5.1.2, "Each Upper Head Injection Accumulator System shall be demonstrated operable:...c. At least once per 18 months by: 1. Verifying that each accumulator isolation valve closes automatically when the water level in the instrument calibration line is 73.3 + 0.25 inches above the bottom inside edge of the water-filled accumulator..."7 This incident was considered to be of no significance with respect to the health and safety of the public.

Very truly yours, William O. Parker, Jr.

PBN/j fw Attachment cc: Director Records Center Office of Management and Program Analysis Institute of Nuclear Power Operations U. S. Nuclear Regulatory Commission 1820 Water Place Washington, D. C. 20555 Atlanta, Georgia 30339 Mr. P. R. Bemis Senior Resident Inspector - NRC McGuire Nuclear Station e$- n

._l- O db l 8207010091 820623 i PDR ADOCK 05000369 S PDR