Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEARML20236B7361987-10-20020 October 1987 Advises That LER 369/87-20 Re RHR Pump Being Inoperable for Greater than 72 H Will Be Submitted on 871027,due to Unresolved Concerns 05000369/LER-1984-030, Suppl to LER 84-030:review Revealed Installation Error That Would Result in Failure of Upper Head Injection Accumulator Discharge Valves to Isolate on Low Level.Analysis of Safety Significance & Encl1984-12-19019 December 1984 Suppl to LER 84-030:review Revealed Installation Error That Would Result in Failure of Upper Head Injection Accumulator Discharge Valves to Isolate on Low Level.Analysis of Safety Significance & Encl 05000369/LER-1984-024, Revised Page 6 to LER 84-024-01,providing Corrective Actions.Relay House Emergency Lighting Improved,Operating & Maint Activities Reviewed for Potential Impact on Offsite Power & Switchyard Computer Will Be Replaced by Mar 19881984-11-0909 November 1984 Revised Page 6 to LER 84-024-01,providing Corrective Actions.Relay House Emergency Lighting Improved,Operating & Maint Activities Reviewed for Potential Impact on Offsite Power & Switchyard Computer Will Be Replaced by Mar 1988 ML20081M7531983-11-0707 November 1983 Ler 83-064/99T-0:on 831024,Westinghouse Notified Util of Potentially Defective Relays SA1.Relay Used in Class IE Switchgear for Diesel Generator Protection & May Cause False Trip Output to Diesel Generator.Caused by Mfg Deficiency 05000369/LER-1982-0451982-06-30030 June 1982 LER 82-045/03L-0:on 820527,HEPA & Carbon Adsorber Filters Periodic Test Revealed That Carbon Adsorber Filters on Auxiliary Bldg Ventilation Sys Failed to Pass Freon Penetration Test.Caused by Carbon Settlement 05000369/LER-1982-0441982-06-30030 June 1982 LER 82-044/03L-0:on 820526,HEPA & Carbon Adsorber Filters Periodic Test Revealed That Auxiliary Bldg Ventilation Sys Filters Failed to Pass Total DOP Penetration Test.Caused by Vibration 05000369/LER-1982-0431982-06-30030 June 1982 LER 82-043/03L-0:on 820520,HEPA & Carbon Absorber Filters Periodic Test Indicated Carbon Absorber Filter on Fuel Pool Ventilation Sys Failed to Pass Freon Penetration Test. Caused by High Humidity.Filters Replaced 05000369/LER-1982-0421982-06-30030 June 1982 LER 82-042/03L-0:on 820519,HEPA & Carbon Filters Periodic Test Revealed That HEPA after-filters on Train B of Annulus Ventilation Sys Failed to Pass Dioctyl Phthalate Penetration Test.Caused by Dirt in Filter 05000369/LER-1982-0411982-06-30030 June 1982 LER 82-041/03L-0:on 820513,HEPA & Carbon Absorber Filters Periodic Test Revealed That Carbon Absorber Filter on Train a of Annulus Ventilation Sys Failed to Pass Halogenated Hydrocarbon Penetration Test.Caused by Dirt in Filter 05000369/LER-1982-0371982-06-30030 June 1982 LER 82-037/03L-0:on 820513,while in Mode 1,performance of Nuclear Air Cleaning Sys Air Flow Measurement Periodic Test Revealed That Train a of Annulus Ventilation Sys Failed to Meet Flow Acceptance Criteria.Caused by Component Failure 05000369/LER-1982-0191982-03-30030 March 1982 LER 82-019/03L-0:on 820228,during Mode 4,performance of RCS Pressure Isolation Valve Leak Rate Test Determined That 3 Valves Failed Test.Caused by Failure of Valves to Seat Properly.Valves Disassembled & Repaired 1987-10-20
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B4131998-09-22022 September 1998 Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage ML20151W3521998-09-0808 September 1998 Special Rept 98-01:on 980819,maint Could Not Be Performed on FPS Due to Isolation Boundary Leakage.Caused by Inadequate Info Provided in Fire Impairment Plan.Isolated Portion of FPS Was Returned to Svc ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236U1601998-07-31031 July 1998 Non-proprietary DPC-NE-2009, DPC W Fuel Transition Rept ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236P0451998-07-0808 July 1998 Part 21 Rept Re non-conformance & Potential Defect in Component of Nordberg Model FS1316HSC Standby Dg.Caused by Outer Spring Valves Mfg from Matl That Did Not Meet Specifications.Will Furnish Written Rept within 60 Days 1999-09-30
[Table view] |
LER-2082-045, |
Event date: |
|
---|
Report date: |
|
---|
3692082045R00 - NRC Website |
|
text
__ _ _ _ _ _ _ _ _ - _ _ _ _ ____ _ _ - _ _ _ _ _
r .' . ".
8 NaC ronne ses u.s.Muctran neCUt ATORY CCAmhetSSION 0 119 LICENSEE EVENT REPORT EXHIBIT A CcNTaot eLOCx: l l l 1 I l l tet.rAss en:Nr on tvrt ALL atousato iNeonaaarios i e@
l l
@ l eN. l C. ucansas l Ml G caosl S l 1 l@to0 l0 l -lucansa
- i. 0 l 0l 0l 0 l O I- l010 aw=ena a al@4ucama l1l1l1l1l@l rues e ir car is @
con-r o i s e M Q.l 0l 5l0 l0 l0l 3l6 l9 e .. occ.1.u, .n @l0 15e l 2 avaar as I 7 lo4r8 l 2@l016l a. 73 3l0r oar aerca l 8a l 2 sel@
EVENT DESCnimCN ANO ence ASLE CON 3ECUENCES h o 2 I Performance of th: "in-place test of HFPA and carbon adsorber filters" periodici ITTT1 1 t e st revealed that the carbon adsorber filter on the auxiliary building ventil-l I'5T 1lation (VA) system failed to pass the freon penetration test. The VA system was!
I o t s i i dec1, red inonerable per T.S. 3.7.7 which is reportable per T.S. 6.9.1.13(b) and t o Isinflar to previona En164/82-43 and 82-41. Since no credit is taken in safety l u 7 lan,1vsis calculations for the VA filter systems, and the effectiveness of the l t o in t I filters was oniv slight 1v dimin isp d, health and safety of the public were un-l
' ' a f f e e t ed . nsreis cause c ca my, cces caos suause coos ca nomercooe suacaos suecoos o e l A I Al@ y@ l Xl@ l FlI l Ll TlE lR l@ lZ l@ W
. i. i, i2 is i i. =
_ uov..m.i. occua. ca a visio .
svaarviaa aeraar aa. caos ne,0,.,r o.
O ."un,
& T.o; I 912 l l 0 14 15 l I of 3 I I LI 2 a L--J n 2 2.
l/l 21 m a 2.
b l0l u
= '= =, ===- ou.
l 0 1 O! O @l y 0 I@, Terrn' ,a::t.. ~,c,w si
.= .w le,,
Ql u 71@ l7l@ W@
- 2. 2n a 2, .i lN l@ y@ ,,
l Z l 91919 l@
CAuse oe:Cnimon ANOConneenve Ac icNs @
li lo g l As a result of run time on the ventilation system, the adsorber filter's carbon i (TTT'1 t had se t t l eil , allowine hvpass flow throuch the void left above the settled car-r m thon. After addine carbon, the filter passed it's freon penetration test, and !
g Ithe system was declared operable on May 28, 1982. Past experience has shown l tii.iIthat only one addition of carbon is necessarv after the carbon settles. l a e .,
IT rus %FOwGR or 4 a frar1JS oi R oiscovtRv 383cnnerio.s iTTilog W@ l 017 l s t@l N/A l~ l B j@l Ireon Penetration Test l t
g is i . . ,,
aet Asso on asuAss tocation o, metaAss @
N/A ountor crivery @ l N/A ITTe' l'1. 7J @ Bl@[ l l
,. o 'a ...oau - a =
aumeen tres occaverion @
IIIII I 0 1 010 @ (3,,,J @ l N/A l
. o .'6'I uu'? o
'* =
u .. ooc.,,rio @
L'_Ls. .] I O I o f olhi N/A i 1 ,, i
' S vv . ce avion N/A h
{Z.jh,! o
, l rueucTv
issuto cascairrion NaC USE ONLY l1jhl NA r . i.
l llllllllll lll Naue Ca rneranen Phillip B. Nardoci ,,icN s. ( 704 ) 373-7432 8207090159 820630 PDR ADOCK 05000369 S pop
|
---|
|
|
| | Reporting criterion |
---|
05000369/LER-1982-007, Forwards LER 82-007/03L-0.Detailed Event Analysis Encl | Forwards LER 82-007/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-009, Forwards LER 82-009/03L-0 | Forwards LER 82-009/03L-0 | | 05000369/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Encl | Forwards LER 82-010/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-011, Forwards LER 82-011/03L-0 | Forwards LER 82-011/03L-0 | | 05000369/LER-1982-019 | LER 82-019/03L-0:on 820228,during Mode 4,performance of RCS Pressure Isolation Valve Leak Rate Test Determined That 3 Valves Failed Test.Caused by Failure of Valves to Seat Properly.Valves Disassembled & Repaired | | 05000369/LER-1982-020, Forwards LER 82-020/03L-0 | Forwards LER 82-020/03L-0 | | 05000369/LER-1982-021, Forwards LER 82-021/03L-0 | Forwards LER 82-021/03L-0 | | 05000369/LER-1982-033, Forwards LER 82-033/03L-0 | Forwards LER 82-033/03L-0 | | 05000369/LER-1982-034, Forwards LER 82-034/03L-0 | Forwards LER 82-034/03L-0 | | 05000369/LER-1982-035, Forwards LER 82-035/03L-0 | Forwards LER 82-035/03L-0 | | 05000369/LER-1982-036, Forwards LER 82-036/03L-0 | Forwards LER 82-036/03L-0 | | 05000369/LER-1982-037 | LER 82-037/03L-0:on 820513,while in Mode 1,performance of Nuclear Air Cleaning Sys Air Flow Measurement Periodic Test Revealed That Train a of Annulus Ventilation Sys Failed to Meet Flow Acceptance Criteria.Caused by Component Failure | | 05000369/LER-1982-038, Forwards LER 82-038/03L-0 | Forwards LER 82-038/03L-0 | | 05000369/LER-1982-039, Forwards LER 82-039/01T-0.Detailed Event Analysis Encl | Forwards LER 82-039/01T-0.Detailed Event Analysis Encl | | 05000369/LER-1982-040, Forwards LER 82-040/03L-0 | Forwards LER 82-040/03L-0 | | 05000369/LER-1982-041 | LER 82-041/03L-0:on 820513,HEPA & Carbon Absorber Filters Periodic Test Revealed That Carbon Absorber Filter on Train a of Annulus Ventilation Sys Failed to Pass Halogenated Hydrocarbon Penetration Test.Caused by Dirt in Filter | | 05000369/LER-1982-042 | LER 82-042/03L-0:on 820519,HEPA & Carbon Filters Periodic Test Revealed That HEPA after-filters on Train B of Annulus Ventilation Sys Failed to Pass Dioctyl Phthalate Penetration Test.Caused by Dirt in Filter | | 05000369/LER-1982-043 | LER 82-043/03L-0:on 820520,HEPA & Carbon Absorber Filters Periodic Test Indicated Carbon Absorber Filter on Fuel Pool Ventilation Sys Failed to Pass Freon Penetration Test. Caused by High Humidity.Filters Replaced | | 05000369/LER-1982-044 | LER 82-044/03L-0:on 820526,HEPA & Carbon Adsorber Filters Periodic Test Revealed That Auxiliary Bldg Ventilation Sys Filters Failed to Pass Total DOP Penetration Test.Caused by Vibration | | 05000369/LER-1982-045 | LER 82-045/03L-0:on 820527,HEPA & Carbon Adsorber Filters Periodic Test Revealed That Carbon Adsorber Filters on Auxiliary Bldg Ventilation Sys Failed to Pass Freon Penetration Test.Caused by Carbon Settlement | | 05000369/LER-1982-047, Forwards LER 82-047/03L-0 | Forwards LER 82-047/03L-0 | | 05000369/LER-1982-048, Forwards LER 82-048/03L-0 | Forwards LER 82-048/03L-0 | | 05000369/LER-1982-049, Forwards LER 82-049/03L-0 | Forwards LER 82-049/03L-0 | | 05000369/LER-1982-050, Forwards LER 82-050/03L-0 | Forwards LER 82-050/03L-0 | | 05000369/LER-1982-051, Forwards LER 82-051/03L-0.Detailed Event Analysis Encl | Forwards LER 82-051/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-052, Forwards LER 82-052/03L-0.Detailed Event Analysis Encl | Forwards LER 82-052/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-053, Forwards LER 82-053/03L-0.Detailed Event Analysis Encl | Forwards LER 82-053/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-054, Forwards LER 82-054/03L-0 | Forwards LER 82-054/03L-0 | | 05000369/LER-1982-055, Forwards LER 82-055/03L-0 | Forwards LER 82-055/03L-0 | | 05000369/LER-1982-056, Forwards LER 82-056/01T-0 | Forwards LER 82-056/01T-0 | | 05000369/LER-1982-057, Forwards LER 82-057/03L-0 | Forwards LER 82-057/03L-0 | | 05000369/LER-1982-058, Forwards LER 82-058/03L-0.Detailed Event Analysis Encl | Forwards LER 82-058/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-059, Forwards LER 82-059/03L-0 | Forwards LER 82-059/03L-0 | | 05000369/LER-1982-060, Forwards LER 82-060/03L-0 | Forwards LER 82-060/03L-0 | | 05000369/LER-1982-061, Forwards LER 82-061/03L-0.Detailed Event Analysis Encl | Forwards LER 82-061/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-062, Forwards LER 82-062/03L-0 | Forwards LER 82-062/03L-0 | | 05000369/LER-1982-063, Forwards LER 82-063/03L-0 | Forwards LER 82-063/03L-0 | | 05000369/LER-1982-065, Forwards LER 82-065/03L-0.Detailed Event Analysis Encl | Forwards LER 82-065/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-066, Forwards LER 82-066/03L-0.Detailed Event Analysis Encl | Forwards LER 82-066/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-068, Forwards LER 82-068/03L-0 | Forwards LER 82-068/03L-0 | | 05000369/LER-1982-069, Forwards LER 82-069/03L-0.Detailed Event Analysis Encl | Forwards LER 82-069/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-070, Forwards LER 82-070/03L-0 | Forwards LER 82-070/03L-0 | | 05000369/LER-1982-072, Forwards LER 82-072/03L-0 | Forwards LER 82-072/03L-0 | | 05000369/LER-1982-074, Forwards LER 82-074/03L-0.Detailed Event Analysis Encl | Forwards LER 82-074/03L-0.Detailed Event Analysis Encl | | 05000369/LER-1982-075, Forwards LER 82-075/03L-0 | Forwards LER 82-075/03L-0 | | 05000369/LER-1982-076, Forwards LER 82-076/03L-0 | Forwards LER 82-076/03L-0 | | 05000369/LER-1982-077, Forwards LER 82-077/03L-0 | Forwards LER 82-077/03L-0 | | 05000369/LER-1982-078, Forwards LER 82-078/03L-0 | Forwards LER 82-078/03L-0 | | 05000369/LER-1982-079, Forwards LER 82-079/03L-0 | Forwards LER 82-079/03L-0 | |
|