Forwards Summary of Fuel Performance,End of Cycle 10,May 1990. No Leakage or Fuel Failure Noted
ML20058P348
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 08/09/1990
From: Bax R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RLB-90-204, NUDOCS 9008160218
Download: ML20058P348 (2)


Text

.

. Commonwealth Edison -

".4 *

~m v

-( g- ouad Cites Nuclear Power Staton'-

22710 206 Avenue North ooroova, Illinois 61242-9740 -

.%-  : Telephone 309/654-2241 RLB-90-204 August 9, 1990-U.S. Nuclear Regulatory Commission L

-ATTN: Document Control' Desk =

Hashington, D.C. .

20555

-1 d

Subject:

-Quad Cities Nuclear Station Unit 2 I Summary Status of Fuel Performance ti NRC Docket Number 50-265 Enclosed is the~Special' Report.:" Quad-Cities Nuclear Power. Station', Unit 2,:

Summary Status of Fuel Performance,-End of Cycle 10, May,fl990.

This report is submitted to_ you..in accordance with the-Special Report j Requirements of Table 6.6-1. Docket Number 50-265', DPR-30.

-: j)

Very truly yours,-

if R.L.-Bax-  : j

.; , Station Manager-i Enclosure ,

c- cc: A.B. Davis, Regional Administrator T. Taylor, Senior Resi. dent Inspector p.' ,

R; Stols, Commonwealth Edison , j, D. Galle, Commonwealth Edison t P -}g[. '

.H. Naughton,. Commonwealth Edison 'W 0\0 j

-g-

, q 'a'

-RLB/jmt Of 9008160218 900809 PDR ADOCK 05000265 ."-

..i<.P PDC

. y m <

d

QUAD-CITIES NUCLEAR POWER STATION.

UNIT THO.

SUMMARY

STATUS OF FUEL PERFORMANCE-END OF CYCLE TEN MAY 1990 At the.end of this reperting period.. Quad-Cities Unit'Two had: completed Ten. '

Reactor cycles of operation. During thatitime, 2347 fuel-assemblies lhad-seen 6 duty in the Unit Two core.

No. sipping was performed on reload fuel assemblies at the. End of Cycle Ten.

~

. This' decision was based-on-chemical and radiochemical data. collected'during Cycle Ten.. which showed no indication--of leakage-or fuel failure.

- For ~ Unit Two Cycle Eleven,168 new LYU-GE9B '(barrier clad) assemblies were 100 percent visually inspected and: loaded.