Category:INSPECTION REPORT
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:UTILITY
MONTHYEARIR 05000369/19900201990-11-0707 November 1990 Insp Repts 50-369/90-20 & 50-370/90-20 on 901001-05 & 1101. No Violations or Deviations Noted.Major Areas Inspected: Design Changes & Mod & Engineering Support Activities IR 05000369/19900191990-10-0404 October 1990 Insp Repts 50-369/90-19 & 50-370/90-19 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of NDE Procedures, Observations of in-progress NDE Exams & Insp Plan IR 05000369/19900171990-09-11011 September 1990 Insp Repts 50-369/90-17 & 50-370/90-17 on 900726-0828. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities & Facility Mods IR 05000369/19900151990-09-10010 September 1990 Insp Repts 50-369/90-15 & 50-370/90-15 on 900813-17. Violations Noted But Not Cited.Major Areas Inspected:Annual Emergency Exercise ML20056A5861990-07-24024 July 1990 Insp Repts 50-369/90-11 & 50-370/90-11 on 900522-0625. Violations Noted.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities, Facility Mods & Follow Up of Events Repts ML20055H4841990-07-13013 July 1990 Insp Repts 50-369/90-14 & 50-370/90-14 on 900626-0705. Violations Noted.Major Areas inspected:licensee-identified Issues Re Unit 1 Diesel Generator Inoperability for Approx 26 H on 900625-26 IR 05000369/19890301989-09-20020 September 1989 Insp Repts 50-369/89-30 & 50-370/89-30 on 890821-24.Noncited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000369/19890151989-09-0707 September 1989 Insp Repts 50-369/89-15 & 50-370/89-15 on 890605-09,19-23 & 0728.No Violations or Deviations Noted.Major Areas Inspected:Maint Program & Program Implementation IR 05000369/19890291989-08-31031 August 1989 Insp Repts 50-369/89-29 & 50-370/89-29 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected: Portions of Inservice Insp Program,Unit 2 Insp Plan for Outage,Review of NDE Procedures & Exam Verifications IR 05000369/19890261989-08-30030 August 1989 Insp Repts 50-369/89-26 & 50-370/89-26 on 890807-11.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry,Previously Identified Items & Status of Steam Generator Blowdown Recycle Sys IR 05000369/19890221989-08-17017 August 1989 Insp Repts 50-369/89-22 & 50-370/89-22 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Eddy Current Exam of Unit 2 Steam Generator Tubing & Previous Open Item IR 05000369/19890211989-08-16016 August 1989 Insp Repts 50-369/89-21 & 50-370/89-21 on 890707-18. Violations Noted.Major Areas Inspected:Operation of Unit 1 Following Improperly Performed Heat Balance & Concomitant Nonconservative Calibr of Power Range Nuclear Instruments IR 05000369/19890201989-08-16016 August 1989 Insp Repts 50-369/89-20 & 50-370/89-20 on 890717-21.No Violations Noted.Major Areas Inspected:Containment Local Leak Rate Testing & Verification of Containment Integrity IR 05000369/19890181989-08-0909 August 1989 Insp Repts 50-369/89-18 & 50-370/89-18 on 890629-0728.No Violations or Deviations Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities,Followup of LER & Followup on Previous Findings IR 05000369/19890161989-08-0808 August 1989 Insp Repts 50-369/89-16 & 50-370/89-16 on 890622-28.One Violation & One Deviation Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on LER & Previous Insp Findings IR 05000369/19890231989-08-0303 August 1989 Partially Withheld Insp Repts 50-369/89-23 & 50-370/89-23 on 890727 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Security Event Logs IR 05000369/19890191989-07-19019 July 1989 Insp Repts 50-369/89-19 & 50-370/89-19 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Program & Unit 2 Insp Plan for Outage,Nde procedures,in-progress NDE Exams & NDE Equipment Calibr ML20236E6471989-07-13013 July 1989 Insp Repts 50-369/89-14 & 50-370/89-14 on 890422-0601. Violation Noted.Major Areas Inspected:Operation Safety Verification,Surveillance Testing,Maint activities,10CFR21 Reviews,Followup on Previous Insp Findings & LERs IR 05000369/19890171989-07-10010 July 1989 Insp Repts 50-369/89-17 & 50-370/89-17 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected: Responses to Previous Insp Findings,Including Followup on NRC Bulletins 88-001 & 88-003 & on 10CFR21 Rept on Breakers ML20244E5881989-06-0505 June 1989 Insp Repts 50-369/89-11 & 50-370/89-11 on 890330-0421. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19890131989-06-0101 June 1989 Partially Withheld Insp Repts 50-369/89-13 & 50-370/89-13 on 890501-05 (Ref 10CFR2.790 & 73.21).Two Noncited Violations Noted Re Failure to Conduct Psychological Exam.Major Areas Inspected:Mgt Support,Record & Repts & Lighting ML20247M5801989-05-15015 May 1989 Insp Repts 50-369/89-10 & 50-370/89-10 on 890404-07.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness Requirements & Practices Implemented During Licensee Response to Steam Generator B Tube Rupture IR 05000369/19890021989-04-25025 April 1989 Operational Safety Team Insp Repts 50-369/89-02 & 50-370/89-02 on 890213-17 & 0227-0322.Violations Noted.Major Areas Inspected:Operations,Maint Support of Operations,Mgt Controls & Emergency Operating Procedures ML20245G9781989-04-20020 April 1989 Insp Repts 50-369/89-05 & 50-370/89-05 on 890228-0329. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19890071989-04-17017 April 1989 Insp Repts 50-369/89-07 & 50-370/89-07 on 890320-24.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of Procedures,Observation of Work Activities & Evaluation of Eddy Current Testing IR 05000369/19890061989-04-10010 April 1989 Insp Repts 50-369/89-06 & 50-370/89-06 on 890308-11.Major Areas Inspected:Events Re 890307 Steam Generator B Tube Failure.Procedures Found to Have Weaknesses Which Could Result in Release of Radioactivity to Environ IR 05000369/19890081989-04-0606 April 1989 Insp Repts 50-369/89-08 & 50-370/89-08 on 890327-31.No Violations Noted.Major Areas Inspected:Steam Generator Tubing Eddy Current Exam & Activities Associated W/Unit 1 Steam Generator B Ruptured Tube IR 05000369/19890091989-03-30030 March 1989 Partially Withheld Insp Repts 50-369/89-09 & 50-370/89-09 on 890220-24 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Security Program Audit,Records & Repts & Compensatory Measures IR 05000369/19890031989-03-30030 March 1989 Insp Repts 50-369/89-03 & 50-370/89-03 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected: Triennial post-fire Safe Shutdown Capability Reverification & Assessment (Module 64150) ML20244A8831989-03-29029 March 1989 Insp Repts 50-369/89-01 & 50-370/89-01 on 890120-0227. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Review of Plant Procedures IR 05000369/19890011989-03-29029 March 1989 Insp Repts 50-369/89-01 & 50-370/89-01 on 890120-0227. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Review of Plant Procedures ML20235P5621989-02-0707 February 1989 Insp Repts 50-369/88-33 & 50-370/88-33 on 881122-890119. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint activities,10CFR21 Insp,Startup from Refueling & Followup on Previous Insp IR 05000369/19880301988-11-0404 November 1988 Insp Repts 50-369/88-30 & 50-370/88-30 on 880924-1020. Violation Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19880271988-10-28028 October 1988 Insp Repts 50-369/88-27 & 50-370/88-27 on 880913-16.No Violations or Deviations Noted.Weakness Noted.Major Areas Inspected:Annual Radiological Emergency Response Exercise IR 05000369/19880281988-10-14014 October 1988 Partially Withheld Insp Repts 50-369/88-28 & 50-370/88-28 on 880912-16 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Maint Barriers,Assessment Aids,Access Controls,Alarm Stations & Training & Contingencies IR 05000369/19880261988-10-12012 October 1988 Insp Repts 50-369/88-26 & 50-370/88-26 on 880820-0923. Violation Noted:Inadequate Fire Barrier Penetrations.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Findings IR 05000369/19880241988-10-0606 October 1988 Insp Repts 50-369/88-24 & 50-370/88-24 on 880801-0916. Violations & Unresolved Item Noted.Major Areas Inspected: Past & Current Operability of Hydrogen Skimmer Sys IR 05000369/19880291988-09-23023 September 1988 Insp Repts 50-369/88-29 & 50-370/88-29 on 880829-0909. Violations Noted.Major Areas Inspected:Inoperability of Safety Sys Due to Inadequate post-mod Testing ML20205S0711988-09-13013 September 1988 Insp Repts 50-369/88-25 & 50-370/88-25 on 880816-18.No Violations or Deviations Identified.Major Areas Inspected: Resolution of Findings from NRC Diagnostic Evaluation Team Rept & Status of Licensee Written Response to Rept ML20154F9911988-09-0606 September 1988 Insp Repts 50-369/88-23 & 50-370/88-23 on 880723-0819.One Violation Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings ML20151Z8821988-08-19019 August 1988 Insp Repts 50-369/88-20 & 50-370/88-20 on 880625-0722. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19880221988-08-11011 August 1988 Partially Withheld Insp Repts 50-369/88-22 & 50-370/88-22 on 880718-22 (Ref 10CFR2.790 & 73.21).No Violations Noted. Major Areas Inspected:Procedures & Operations of SNM IR 05000369/19880161988-07-26026 July 1988 Insp Repts 50-369/88-16 & 50-370/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected: Occupational Exposure During Extended Outages IR 05000369/19880191988-07-21021 July 1988 Insp Repts 50-369/88-19 & 50-370/88-19 on 880627-0701.No Violations or Deviations Noted.Major Areas Inspected:Nde Activities Re Resistance Temp Detector Sys Mods & Inservice Insp & Preservice Insp Being Accomplished During Outage IR 05000369/19880171988-07-15015 July 1988 Insp Repts 50-369/88-17 & 50-370/88-17 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluents IR 05000369/19880181988-07-12012 July 1988 Partially Withheld Insp Repts 50-369/88-18 & 50-370/88-18 on 880620-24 (Ref 10CFR2.790 & 73.21).One Licensee Identified Violation Noted.Major Areas Inspected:Mgt Effectiveness - Security Program & Records & Repts ML20151E6081988-07-0808 July 1988 Insp Repts 50-369/88-14 & 50-370/88-14 on 880521-0624. Violations Noted:Continued Weakness in Procedural Compliance.Major Areas Inspected:Safety Verification, Surveillance Testing & Refueling Outage Activities IR 05000369/19880151988-06-30030 June 1988 Insp Repts 50-369/88-15 & 50-370/88-15 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nde Procedures Review,Observation & Review of in-process NDE Exam & Review of Inservice Insp Exam Data ML20195C8611988-06-0707 June 1988 Insp Repts 50-369/88-13 & 50-370/88-13 on 880502-06.One Violation & Two Unresolved Items Noted.Major Areas Inspected:Nrc Diagnostic Evaluation Team Rept Findings & Action on Previous Insp Findings ML20155J3411988-05-31031 May 1988 Insp Repts 50-369/88-12 & 50-370/88-12 on 880423-0520. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings 1990-09-11
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19993011999-03-18018 March 1999 NRC Operator Licensing Exam Repts 50-369/99-301 & 50-370/99-301 (Including Completed & Graded Tests) for Tests Administered on 990125-0205.Five SRO & Six RO Candidates Received Written Exams & Operating Tests IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20154C4131998-09-21021 September 1998 Notice of Violation from Insp on 980712-0822.Violation Noted:On or Before 971217,operations Personnel Failed to Designate Appropriate Vent Valves for Venting to Properly Return Sys to Svc as Required by Omp 7-1 IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20237B1561998-08-0707 August 1998 Notice of Violation from Insp on 980531-0711.Violation Noted:Licensee Failed to Establish Procedural Guidance for Abnormal Vent Path Used for Degassing Unit 1 Volume Control Tank to Environ IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-030, on 980603,loss of Offsite Power Occurred,Due to Loss of 1B Bus.Caused by Faulted 230 Kv Switchyard Current Transformer.Resident Inspectors Onsite & Responded to Event & Will Continue to Evaluate Activities W/Event1998-06-0404 June 1998 PNO-II-98-030:on 980603,loss of Offsite Power Occurred,Due to Loss of 1B Bus.Caused by Faulted 230 Kv Switchyard Current Transformer.Resident Inspectors Onsite & Responded to Event & Will Continue to Evaluate Activities W/Event ML20249A2451998-06-0404 June 1998 Notice of Violation from Insp on 980413-24.Violation Noted: Procedure Investigation Processes 2-M96-1440 & 0-M97-1933 Were Not Initiated within 24 H After Realization That Procedure Investigation Process Should Have Been Written IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6051998-04-0606 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:Licensee Failed to Adequately Establish or Adhere to Procedural Guidance for Repair of Two safety-related Containment Isolation Valves as Evidenced ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security ML20203F5921998-02-23023 February 1998 Notice of Violation from Insp on 980105-08.Violations Noted: Licensee Failed to Follow Procedures for Security Badge & Access Control IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys IR 07100102/20120131998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Inadequate Measures Were Provided for Verification or Checking Adequacy of Design Documents ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1571998-01-0505 January 1998 Notice of Violation from Insp on 971205-06.Violation Noted: an Event Occurred on 971202 in Which Person or Persons Made Credible Threat to Commit or Cause Significant Physical Damage to Power Reactor & Not Reported within One Hour ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg ML20203M4471998-01-0505 January 1998 Errata to Notice of Violation for Insp Repts 50-369/97-19 & 50-370/97-19.Statement in Nov,Page 2, Under Authority of Section 182 of Act.42USC 2232,this Response Shall Be Submitted Under Oath or Affirmation, Was Incorrect IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198N4701997-10-20020 October 1997 Notice of Violation from Insp on 970810-0920.Violation Noted:On 960420,ET Guidelines,Apps C & E Were Not Implemented as Evidenced By;Resolution Analyst Revised & Overruled Reexam Request for SG 2A Tube R7C60 ML20212A0361997-10-0808 October 1997 Notice of Violation from Insp on 970712-0827.Violation Noted:As of 970717,10 of 48 Ice Condenser Inlet Doors on Unit 2 Required Initial Opening Torque in Ixcess of 675 inch-pound Operability Limit ML20211K9431997-09-26026 September 1997 Notice of Violation from Insp on 970721-26.Violation Noted: Licensee Failed to Follow Procedures for Security Badges & Access Control of Facility IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19973001997-08-29029 August 1997 NRC Operator Licensing Exam Repts 50-369/97-300 & 50-370/97-300 (Including Completed & Graded Tests) for Test Administered on 970728-31.Exam Results:Five SRO & One RO Passed Exam & One SRO Failed Exam IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20217R1161997-08-18018 August 1997 EN-97-076:on 970818,order Prohibiting Involvement in NRC- Licensed Activities for a Period of One Year Will Be Issued. Action Based on Investigation Conducted by Oi,Which Determined Falsification of QA Document PNO-II-97-051, on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened1997-08-0909 August 1997 PNO-II-97-051:on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149L5701997-07-28028 July 1997 Notice of Violation from Insp on 970518-0628.Violation Noted:Procedure IP/0/A/3250/12B Inadequate to Provide Sufficient Guidance to Properly Test Emergency Diesel Generator Sequencer Logic Circuitry ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149G6771997-06-16016 June 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:Procedure PT/1/A/4600/014D Was Inadequate in Providing Sufficient Guidance to Bypass Properly RPS Functions of an Inoperable N-41 Channel to Permit Testing of Channel N-42 IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148B9621997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Prior to 961130,activities Affecting Quality,Not Accomplished in Accordance W/Instructions,Procedures or Drawings IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support 1999-08-26
[Table view] |
See also: IR 05000369/1986016
Text
_ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ . _ _ - _ _ - _ - _ _ _ . _ - _ _ _ __ __ ___ _
. _ _ _ ,
n UNITE 3 CT ATES
g e REIoq'o
'
NUCLEAR REGULATORY COMMISSION
[ , REGION il
g j 101 MARIETTA STREET.N.W.
- c ATLANTA. GEORGI A 30323
%, ,&
Report Nos.: 50-369/86-16 and 50-370/86-16
.
Licensee: Duke Power Company
422 South Church Street
Charlotte, NC 28242
Docket Nos.: 50-369 and 50-370 License Nos.: NPF-9 and NPF-17
Facility Name: McGuire 1 and 2
Inspection Conducted: June 9-13, 1986
Inspector: N I. /Md e 7 ' #/ ' f6
H.' L. Whitener Date Signed
Approved by:
F. Jape, STction Chief
(/
V /
7/3 //b
Date Signed
Engineering Branch
Division of Reactor Safety
SUMMARY
Scope: This routine, unannounced inspection was conducted in the areas of
primary containment integrated and local leak rate testing.
Results: One violation was identified - Failure to determine the as-found leak
rate for the Unit 2 primary containment, paragraph 7.
8608110385 860805
PDR ADOCK 05000369
G PDR
.. ..
_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ .
.
.
REPORT DETAILS
.
1. Persons Contacted
Licensee Employees
- T. McConnell, Station Manager
- W. Suslick, Performance, General Office
P. Roberson, Performance Engineer
- D. Smith, Performance Engineer
- N. McCraw, Compliance Engineer
.
NRC Resident Inspector
W. Orders, Senior Resident Operator
'
'
2. Exit Interview
The inspection scope and findings were summarized on June 13, 1986, with
those persons indicated in paragraph 1 above. The inspector described the
areas inspected and discussed in detail the inspection findings. The
licensee requested an opportunity to discuss the issues with Region II
management subsequent to the Region review of the inspection findings.
This discussion was held via telephone on July 29, 1986.
New items identified during the inspection include:
Violation 370/86-16-01: Failure to obtain the as-found leak rate for
the Unit 2 primary containment, paragraph 7.
Inspector Followup Item 370/86-16-02: Review the results of the
licensee's examination of isolation valve maintenance to determine the
" pass" or " fail" status of the Unit 2 as-found containment leakage,
- paragraph 7.a.
Inspector Followup Item 369/86-16-01: Review the procedures
established to track and control determination of the as-found leak
rate, paragraph 7.b.
The licensee did not identify as proprietary any of the materials provided
j
to or reviewed by the inspectors during this inspection.
3. Licensee Action on Previous Enforcement Matters
i This subject was not addressed in the inspection.
l
,
t
. _ . _ . , , _ _ _ , - , , _ _ _ _ .- __- , , . - _ , _ . _ . , - - - _ . , - - - -. _ _ . _ _ _
_ _
2
.
.
4. Unresolved Items
Unresolved items were not identified during the inspection.
5. Containment Integrated Leak Rate - Unit 2
A 24-hour containment' integrated (Type A) leak rate test and a four hour
supplemental leak rate test were performed on the Unit 2 primary containment
in the period May 25-26, 1986. Mass point-linear regression analysis was
used by the licensee to determine the leak rate (Lam) and upper confidence
limit (UCL) at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The test met the acceptance criteria for both mass
point and total time analysie. as shown below; the values are expressed as
'
weight percent per day.
Mass Point Total Time
wt%/ day wt%/ day
La 0.3 0.3 (allowable leakage)
0.75 La 0.225 0.225 (test acceptance limit)
- Lam at 24 hrs. 0.0785 0.0758
UCL at 24 hrs. 0.0833 0.095
A four hour supplemental test was performed -in accordance with the
recommendations of Appendix C of ANSI N45.4-1972. The measured composite
leak rate was within the upper and lower acceptance limits specified by the
equation:
4
Lam + Lo - 0.25 La < Lc < Lam + Lo + 0.25 La for the mass point analysis.
The values for the equation by mass point analysis in terms of weight
percent per day are as follows:
'wt%/
- day
Composite leak rate, Lc 0.385
Type A test leak rate, Lam 0.0785
- Imposed leak rate, Lo 0.241
Error limit, 0.25 La 0.075
Substitution of these values into the acceptance equation demonstrate that
the specified inequalities are satisfied as follows:
0.2445 < 0.385 < 0.3945
Based on this review of the computer printout of test data, the inspector
concluded that the Type A and supplemental tests demonstrate that the
primary containment leakage rate is within the specified acceptance limits.
l
l
l
.
- - - ._-
_
_ _.
__
- -. - .- . . . -.
- - - _ ._. ._.
3
.
.
6. Leak Rate Test Program
Plant Procedures
The ~ inspector reviewed the overall leakage rate program for McGuire to
verify that procedures have been developed and implemented consistent with
the regulatory requirements. Documents reviewed either totally, or in part,
j included:
a. PT/2/A/4200/01A - Containment Integrated Leak Rate Test and Structural
Integrity Test
b. PT/2/A/4200/018 - Electrical Penetration Leak Rate Test
c. PT/2/A/4200/01C - Isolation Valve Leak Rate Test
d. PT/2/A/4200/01D - Fuel Transfer Tube Leak Rate Test
e. PT/2/A/4200/01E - Upper Containment Personnel Lock Leak Rate Test
f. PT/2/A/4200/01F - Lower Containment Personnel Lock Leak Rate Test
g. PT/2/A/4200/01G - Mechanical Penetration Leak Rate Test (Bellows Test)
h. PT/2/A/4200/01H - Equipment Hatch Leak Rate Test
1. PT/2/A/4200/01J - Unit 2 Containment Leakage (Controlling procedure to
ensure that the required leakage summations are completed)
J. PT/2/A/4200/01N - VP (Purge and Ventilation) Valve Leak Rate Test
k. PT/2/A/4200/010 - Air Lock Isolation Valve Leak Rate Test
1. PT/2/A/4200/01P - Penetration (Ice Condenser) Leak Rate Test
m. PT/2/A/4200/01Q - Penetration Leak Rate Test (Special Conditions)
n. PT/0/A/4200/22 - New Penetration Leak Rate Test (Special Test)
o. TT/2/A/9100/147 - 2NI1208 Local Leak Rate Test (Special Retest)
Although every procedure listed above was not reviewed for total valve
alignment in step by step detail, the inspector concluded that program-
matically the licensee has developed and implemented a containment leak rate
measurement program. The program is consistent with the regulatory
requirements of the Technical Specification, Section 3/4.6; 10 CFR 50,
Appendix J; and, ANSI N45.4 with the one exception of determining the
as-found primary containment leakage rate. The as-found leakage rate is
discussed further in paragraph 7.
,
,- -
, , , , , ,----r--------- -----------,v.. , - . , , - - . - - , . . . - - - - - ,
-_ .
4
.
.
-
A detailed walk-through was performed for the local leak rate (Type C)
testing of three penetrations in procedure TP/A/4200/01C. These
penetrations were M373, Glycol System; M353, Fire Protection System; and
M280, Sample System. Partial review of other penetrations was also
performed and no problems were identified relative to venting, draining,
valve identification, valve alignment and system restoration. The inspector
further verified that all penetrations requiring Type C testing in Technical
~
Specification Table 3.6-1 are included in the test procedures.
As left leak rate results are tracked and summarized in procedure
TP/A/4200/01J. Enclosures 13.1,13.2, and 13.3 specify the results of the
Type A test, Type C bypass leakage and the Total Type B and C leakage based
on maximum leak paths, respectively. Appropriate acceptance criteria were
specified in this procedure and compared with measured leakage as follows:
Limits Measured Total
Bypass leakage 0.07La (9514 SCCM) 2811 SCCM
Total Type B & C leakage 0.6La (81,552 SCCM) 4192 SCCM
The inspector concluded that the as left local leakage rates are well below
the acceptable limits.
l 7. As-Found Leak Rate
Paragraph III.A.3(a) of Appendix J to 10 CFR 50 incorporates the require-
ments of ANSI N45.4 - 1972 into the regulations. Relative to the Type A
leak rate test, paragraph 4.2 of ANSI N45.4 states, in part, "for retesting,
an initial record proof test shall be conducted at time periods and
pressures established by the responsible organization before any preparatory
repairs are made. This will disclose the normal state of repair of the
containment structure and a record of the results shall be retained."
By a memorandum, dated January 11, 1982, NRR provided a staff position to
clarify the statement, " normal state of repair." This memorandum states
that if repairs or adjustments are made to the containment isolation
boundary prior to the Type A test, the leakage reduction effected by these
repairs or adjustments must be quantified and the Type A test result
adjusted in order to determine the containment " normal state of repair" or
specifically the as-found containment leak rate. In that there appeared to
be a misunderstanding by some licensee's as to what the regulations require,
IE Notice 85-71, August 22, 1985, was promulgated to clarify the intent and
'
the requirements of this regulation. The inspection findings in this area
are discussed below for Units 1 and 2.
a. Unit 2
Review of local leak rate testing performed on McGuire Unit 2 during
the current refueling outage indicates that the as-found leakage was
not obtained for the Type C tests in all cases before repairs or
adjustments were made. From the test records, nine penetrations were
_ _ _ -
5
.
.
characterized as having excessive leak rates. In some cases, the
leakage exceeded the capability of the flow meter (>2000 SCCM) and in
one case, the penetration could not be pressurized. However, the test
data sheets, work requests, and a computer printout of maintenance job
descriptions showed that after repair of only one valve in each of
these nine penetrations the leak rate for the penetration was reduced
to an acceptable low value. Thus the minimum path leakage through the
penetration is available for these nine penetrations. The leakage from
these penetrations was in the range of 0.001 wt% per day and will not
significantly effect the Type A test result. However, it was found
that preventive maintenance was intentionally performed on a number of
the isolation valves before an as-found leak rate was obtained.
Although precise data was not readily available, the licensee estimated
that as many as 50% of the isolation valves were exposed to this
main +.enance which has the potential of affecting the leak rate.
At the exit interview, the inspector identified this matter as an
apparent violation as follows: Violation 370/86-16-01: Contrary to
the requirements of the Technical Specification, Section 4.6.1.2 and
10 CFR 50, Appendix J, paragraph III.A.3(a) which incorporate the
requirements of ANSI N45.4-1972, paragraph 4.2 into the regulations;
the licensee failed to determine the Unit 2 as-found containment leak
rate prior to performing repairs or adjustments which can effect the
measurement of the as-found leakage.
The matter of whether the Type A test performed on Unit 2 in May 1986
is a passed or failed test was also discussed with the licensee. The
licensee believes that the maintenance records contain enough detail to
determine if the type of maintenance performed could effect valve leak
rates.
These records will be examined to see if the as-found leak rate can be
quantified.
At the exit interview, the inspector identified the status of the
Type A as-found leak rate as an inspector followup item: IFI
370/86-16-02: Review the results of the licensee's examination of
l isolation valve maintenance to determine the as-found leak rate status
of Unit 2.
b. Unit 1
The inspector also reviewed the licensee's action to determine the
l
as-found leakage on Unit 1 which is scheduled for a Type A test in July
l 1986. From discussions with management and personnel involved in
- performing the local leak rate testing, the inspector determined that
the licensee has implemented controls to obtain the as-found leak rate
for Unit 1.
I
I
l _ __ _ _ _. , _ _ - - - . .. - __
..- . - - - . - _ _ _. --. . .~ - . - - - . -.
.
i
- 6
'
-
. .
For the current outage, the Planning group has the responsibility of
routing all work . requests involving maintenance on containment
isolation valves .to the Performance group prior to the maintenance.
The Performance group evaluates the work requests to determine if a
'
, leak rate test must be performed prior to maintenance and/or post :
maintenance. Through coordination of the Planning, Performance, and
Maintenance groups control of as-found leakage measurements has been
established.
In addition to the current outage maintenance, the Performance group
has reviewed all pre-outage scheduled maintenance to identify any
required as-found leak rate tests.
,
While the controls established by the licensee appear adequate, these
. controls have not yet been formalized into procedures.
At the exit interview, the inspector identified this matter as an inspector
followup item:
'
IFI 369/86-16-01: Review the procedures established to track and
control determination of the containment as-found leak rate.
.