Thirteenth Partial Response to FOIA Request for Documents Re Plant.Forwards App R Documents.App R & Documents Available in PDR & Lpdr Located in San Luis Obispo,Ca.App T Documents May Be Purchased from ANSI
ML20149D690
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/29/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20149D694 List:
References
FOIA-84-21, RTR-NUREG-0675, RTR-NUREG-0731, RTR-NUREG-675, RTR-NUREG-731, RTR-REGGD-01.008, RTR-REGGD-01.088, RTR-REGGD-1.008, RTR-REGGD-1.088 NUDOCS 8801130089
Download: ML20149D690 (20)


Text

"

I. . u.s. piucLE AR RE LATORY COMMISSCN  %-c sourmis? %.wsis 5

, er% , f F01A-84-21

/ A f

! E N #

RE3PONSE TO FREEDOM bF

" ff

%# l'"

'is>: 5 rm

!XX *' 13th

( e se.. /

INFORMATION ACT (FOIA) REQUEST

DEC 2 91887 OOca(T Nvuota Siis .pparaw se3vtSYta Billie P. Garde 50-275/323 PART 1.-RECORDS RELE A$tO OR NOT LOCATID (See checked bones)

No agency records sobrect to the request have been loc.ited.

No addstorsal agency records subrect to tne roouest have been locatec Agency records subsect to the roouest that are identifed in Appendi E 1717 H Street N W., Washegton, DC $ are already ava4ble for pu%c irspecton and copyeg c tN NRC PdAc Document Room, Agency records subsect to the roovest that are identified in Appeet R _ 4,e bem, made avause fo, pu%c .nspect.on and coom e tne NRC Puwe oocum.nt J 50com.1717 H Street. N W., Wubegton, DC, e a folder unoer f.e 80A numter and recuester na'ne.

The nonpropnetary verson of the preposans) that you agreed to a:cect r* a telephone conversation mth a member of my staff a now being 43e avatable fu pu%c racecton and coying at the NRC Pubbc Document Room, 1717 64 Street. 8 A Washegton. DC, e a folder under this F01 A number and requester nanw Er.Josed e informaton on how you may obts.n access to and the :Parpes for copyeg records placed in the NRC Pu%c Document Room 1717 > S.reet. N W , Wum.ngton. O e

Agency records subv ct to the roouest are enclosed Any applicabe c*rge for copes of the records provided and payment procedures are ectsc e the commeets secton.

Records schrect to the reovest have been re* erred to another Fooral gencytes) for review and direct respoisse to you I

in new of NRC's response to the roovest. no further acton a teeg .esen on apoest letter dated PART 11 A-INFORMATION WITHHELD FROM PUBLIC DISCt05URE Cerun eform .on m the roovested scords is teeg mthbead frcr o.cac descicsu r e pursuant to the FotA esemptons described e and for the manoes ststed an Part it, sec-toes B. C. ano 0. Any released gottons of the documents for est crvv part of the record is beag w<thheed are beg made avadable for ouf*c esfecton and copymg m the NRC PutAc Document Room.1717 H Street. N W., Washeryce, OC. e a fondee under this FOt A number and requester name

" Records that are being placed in the NRC PDR are also being placed in the Local Public Document Room for Diablo Canyon located at the R. E. Xennedy Library, California Polytechnic State University Government Documents and Maps Department, San Luis Obispo, California 93407.

The records identified on the enclosed Appendix T may be purchased frcr the American National Standards Institute. The address is shown on the appendix.

' Additional records have been referred to the Federal Emergency Management Agency for review and direct response to you.

i Donnie H. Grimsley SC.AATV*t DietCTOR..c Drwss0% , -

pOF nuttL A%kecc'(( l gF_ _ prpy ena2,

-- GARDEB4-21 PDR

i Re:'FOIA-84-21 l APPENDIX R I RECORDS BEING PLACED IN PDR

1. Undated HPF Training / Doc for Quality Personnel. (1 page)
2. Undated Handwritten - Personnel Training Program. (3 pages)
3. Undated Bent Plates and Weld Joints Book. (4 pages)
4. Undated Portions of typewritten pages starting at page 8. (4 pages)
5. Undated Handwritten dates and numbers. (9 pages)
6. Undated Allegation or Coacern No. 59. (5 pages)
7. Undated Allegation v Concern No. 57. (4 pages)
8. Undated Allegation or Concern No. 57. (5 pages)
9. Undated Al hgation or Concern No. 53. (3 pages)
10. Undated Affidavit of John D. Carlson. (7 pages)
11. Undated Affidavit of Allen D. Johnson. (10pages)
12. Undated Handwritten note to Jane froci BJ. (i page)
13. Undated USA Standard B31.7 Nuclear Pcwer Piping. (2 pages)
14. Undated Power Piping. (4 pages)
15. Undated Chapter 1 - Nuclear Regulatory Comission, Allegation 60.

(2 pages)

16. Undated Part 21 - Statements of Consideration, Allegation 60. (1 l Pd98)
17. Undated Allegation or Concern No. 60. (6 pages)
18. Undated Allegation No. 58. (1 page) l
19. Undated Allegation or Concern No. 58. (1 page)
20. Undated Allegation or Concern No. 62. (5pages)
21. Undated Docket No. 50-275, Weld Symbols. (195 pages)
22. Undated 3.0 Drawings, Fabrication and Erection. (342 pages)

N J

Re: F01A-84-21 (13th Partial)

APPENDIX R (Continue'3)

RECORDS BEING PLACED IN PDR

23. Undated Handwritten note, Attic Box Ties. (237 pages)
24. Undated Foley CA Audits of Doc. Turnover. (237 pages)
25. Undated ANSI N18.1 - 1971 Qualification. (10 pages)
26. Undated Leads for Bostrom-Bergen Investigation Per Discussion with Don Driskill. (3 pages)
27. Undated Inspection at Diablo Canyon. (9 pages)
28. Undated Attachment to HPF/NCR 8802-824 Rev. 1. (3 pages)
29. Undated Picture. (1 page)
30. Undated Allegation or Concern No. 71. (5 pages)
31. Undated Allegation or Concern No. 73. (2 pages)
32. Undated Docket No. 50-275. (11 pages)
33. Undated Docket No. 50-275. (1 page)
34. Undated Allegation or Concern No. 70. (2 pages)
35. Undated Allegation or Concern No. 126. (7 pages)
36. Undated Allegations No. 92 and 93, Problem Statemer.t. (5 pages)
37. Undated Allegation or Concern No. 19. (2 pages)
38. Undated Allegation or Concern No. 9. (1 page)
39. Undated PG&E Audits of Foley. (1 page)
40. Undated Allegation No. 96. (1 page)
41. Undated Allegation or Concern No. 102. (1 page)

A <Jated Allegation or Concern No. 61. (2 pages) 4c u .ed Handwritten note to Randy sing from HK w/ attachments. (8 )

pages)

44. Undated Bisco Production Procedure, "Installation of a Bisco Production Sleeve Extension Utilizing Bisceseal (Purable or Trowelable). (1 page) b - .

Re: FOIA-84-21 (13th Partial)

APPENDIX R

'(Continued)

RECORDS BEING PLACED IN PDR

45. Undated Allegation or Concern No. 126. (7 pages)
46. Undated Allegation or Concern No. 91. (3 pages)
47. Undated Routing Slip to Bail Tegle from Amy Vasquez, w/attachm;nts. (20 pages)
48. Undated Evacuation Time Considerations. (7 pages)
49. Undated General Computation Sheet. (35 pages)
50. Undated Description of Changes. (8 pages)
51. Undated Allegation or Concern No. 102. (4 pages)
52. Undated Allegation or Concern No. 102. (2 pages)
53. Uadated A11ega: ion or Concern No. 102. (2 pages)
54. Undated Typewritten pages #61. (11 pages)
55. Undated Allegation or Concern No.18. (2 pages)
56. Undated Allegation or Concern No. 63. (2 pages)
57. Undated Pictures. (1 page)
58. Undated Allegation or Concern No. 167. (1 page) j
59. Undated Allegation or Concern No. 2. (1 page) l
60. Undated Allegation or Concern No. 1. (1 page)
61. Undated Memo to All Region Y Personnel from John Martin, subject: Performance and Documentation of Technical Reviews.

(35 pages)

62. Undated DWG No. 103071. (2 pages) )
63. Undated Allegation or Concern No. 51. (7 pages) )
64. Undated National Cooperative Highway Research Program Report 95.

(8 pages)

65. Undated Ltr to Pacific Gas and Electric from T. W. Bishop, l subject: NRC Inspection of Diablo Canyon Units Nos. 1 and 2.

(48 pages)

_. ,,..-..___y,, ,.c _

  • y.,_ .g. , -

-.-y

N. .

Re: F01A-84-21 (13th Partial)

APPENDIX _R (Continued)

RECORDS BEING PLACED IN PDR

66. Undated Ltr to Dennis Xirsch from Richard Loff, subject: Task Order 56. (21 pages)
67. Undated Allegation or Concern No. 68. (48 pages)
68. Undated QCP-9, Rev. 6. (3 pages)
69. Undated Allegation or Concern No. 61. (13 pales)
70. Undated Copy of Quality Assurance Records. (2 pages)
71. Undated Criterion IX, Fir. ding No. 3. (20 pages)
72. Undated Allegation Data Form. (1 page)
73. Undated Concrete Expansion, Anchors for Static and Seismic Leading. (4 pages)
74. Undated Typewritten page starting at 14. (1 pge)
75. Undated Allegation No. 89. (1 page)
76. Undated Allegation No. 53. (1 page)
77. Undated Allegation No. 33. (1 page)
78. Undated Allegation No. 23. (1 page)
79. Undated Allegation No. 28. (1 page)
80. Undated Allegation No. 19. (1 page)
81. Undated Allegation No. 18. (1 page)
82. Undated Allegation No. 9. (1 page)
83. Undated Allegation No. 5. (1 page) l
84. Undated Allegation No. 2. (1 page)
85. Undated Allegation No. 1. (1 page)  !
86. Undated Allegation No. 56. (1 page)
87. Undated DCN/DCR Control Sheets. (208 pages).

\ l

Re: FOIA-84-21 (13th Partial)

APPENDIX R (Continued)

RECORDS BEING PLACED IN PDR

88. 8/69 Effect of Rain on Freeway Capacity, Research Report Number 24-23. (36 pages)
89. 7/16/74 Ltr to Foley Co., from C. K. Maxfield, re: Diablo Canyon Project. (67 pages)
90. 9/75 Regulatory Guide, Personnel Selection and Training. (2 pages)
91. 12/10/76 Procedure for Establishing Acceptance Criteria for Concreto Anchor Installations Diablo Canyon Project.

(26 pages)

92. 1/21/77 Procedure for Inspection of Existing Concrete Expansion Anchors in Hanger Installations. (14 pages)
93. 2/28/77 Sheet il of Anchors. (50 pages)
94. 3/2/77 Discrepancy Report. (2 pages)
95. 4/19/77 Discrepancy Report. (45 pages) 96, 10/24/77 Ltr to Edward F. Gerwin from Jack Weber, subject: Audit Report of Diablo Canyon Effort. (47 pages)
97. 2/23/76 Concrete Expansion Anchors for Static and Seismic Loading. (4 pages)
98. 5/14/78 Activity Audit of PG&E Quality Assurance Department. (4 pages)
99. 9/15/78 Pullman Power Products, to be used only on job #7177. (2 ,

pages)

)

100. 9/28/78 Procedure for Inspecting in the Grid. (13 pages) 101. 10/2/78 Acceptance Criteria for Concrete Expansion Anchors Diablo Canyon Project. (4 pages) 102. 2/6/79 Specification / Instruction Change Notice from Pullman Power Products to PG&E. (2 pages) j 103. 3/13/79 Installation and Inspection of Pipe Supports. (99 pages) 104,9/80 NUREG-0731 "Guidelines for Utility Management etructure and Technical Resources." (34 pages)

\ )

4 t . .

l l

1 Re: FOIA-84-21 (13th Partial) l APPENDIX R {

(Continued) l RECORDS BEING PLACED IN PDR 105. 10/23/80 Blank form for Anchor Bolt Instruction Inspection Report. (1 page) 106. 1/22/81 Ltr to Robert Tedesco from Philip A. Crane, re: Diablo  ;

Canyon Units 1 and 2. (2 pages) 107. 1/22/81 Ltr to Robert Tedesco from Philip A. Crane, re: Diablo Canyon Units 1 and 2. (34 pages) 108, 2/17/81 Audit Paln. (4 pages) 109. 3/81 NUREG-0675, "Safety Evaluation Report" related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2. (30 pages) 110, 6/29/81 Ltr to A. E. Moses from J. Thompson, re: PG&E Contract 22C-8802-2. (35 pages) 111, 7/14/81 Ltr to Darrell Eisenhut from Philip A. Crane, subject:

Qualification of Inspection Examination and Testing and Audit Personnel. (4 pages) 112. 7/29/81 Audit Finding Report Howard P. Foley Co. (1 page) 113. 12/18/81 Computer print out. (1 page) 114. 12/18/81 Computer print out. (1 page) l 115. 12/18/81 Computer print out. (1 page) 1 116. 1/22/82 Ltr to A. E. Moses from J. Thompson, re: PG&E Contract 22C-8802-2. (1 page) 117. 2/9/82 Nonconformance Report. (92 pages) 118, 2/22/82 Inter-office Comunication to V. Tennyson from P. W. l French. (53 pages) '

119. 5/7/82 Pacific Gas and Electric, "Procedure for Operating Neelear Plant Modification." (154 pages) 120. 5/13/82 Procedure for Installation and Documentation of Fire Alarms, Cardox System, Deluge System and Smoke Detectors.

(5 pages) 121. 6/16/82 General Computation Sheet. (1 page) 122. 9/10/82 "As Built", G-140-1-noteg 5-102, Mounted from Ceiling.

(51pages)

( o

Re: F0!A-84-21 (13th Partial)

APPENDIX R (Continued)

RECORDS BEING PLACED ~N POR 123. 9/10/82 Memo to Mike Yen from Etzler, subject: Anchor Bolt Verification. (9 pages) 124. 10/8/82 Circuit Installation Record. (3 pages) 126. 1/7/83 Allegation or Concern No. 7. (3 pages) 127. 1/7/83 Allegation or Con:ern No. 3. (7 rages) 128. 1/7/83 Allegation No. 3. (1 page) 129. 1/7/83 Allegation No. 4. (1 page) 130. 1/7/83 Allegation No. 7. (1 page) 131. 1/7/83 Allegation No. 8. (1 page) l 132. 1/11/83 Sumary of Special Insp - Related Information. (1 page) 133. 2/3/83 Interview with Stokes and Devine. (8 pages) 134. 2/7/83 Allegation No. 6. (1 page) i 135, 3/1/83 Design Criteria memorandum. (37 pages) l 136, 4/4/83 Allegation No. 10. (1 page) 137. 4/4/83 Allegation No. 12. (1 page) 138. 4/4/83 Allegation No. 11. (1 page) 139. 4/4/83 Allegation No. 17. (1 page) 140, 4/4/83 Allegation No. 16. (1 page) 141. 4/4/83 Allegation No. 15. (1 page) l 142, 4/4/83 Allegation No. 14. (1 page) 143. 4/4/83 Allegation or Concern No. 13. (1 page) 144, 4/4/83 Allegation No. 13. (1 page) 145. 6/83 Allegation Update Sheet. (1 page) i

Re: FOIA-84-21 l (13th Partial)

APPENDIX R l (Continued) l RECORDS BEING PLACED IN PDR 146. 6/83 Allegation Update Sheet. (1 page) l 147, 6/83 Allegation Update Sheet. (1 page) 148,8/10/83 Quality Assurance decords. (134 pages) 149. 8/11/83 Practical Chemistry Skill Rew irements for Chemical and j Radiation Protection Technicians. (26 pages) 150. 8/11/83 Allegation Data Form. (1 page) 151. 8/11/83 Pipe Support Design Tolerance Clarification Form. (20 pages) 152, 8/11/83 Allegation Data Form. (I page) I l

153. 8/29/83 Allegation Data Form. (1 page) 154. 9/7/83 Allegation Data Form. (1 page)

I 155. 9/20/83 Memo to Jacobson from McCall, subject: Questions Relative I to Audit #83317A. (1 page) I I

156. 9/25/83 Report, "Pullout Capacities of Phillips Red Head Concrete Anchors as Affected by Spacing." (1 page) 157. 9/28/83 Ltr to Eisenhut from Strumtsser. (11 pages) 158. 9/29/83 Regional Action. (1 page) 159. 10/4/83 Allegation Data Form. (7 pages)

I 160. 10/5/83 Memo to Etzler from Cranston, subject: Clarification of Pipe Support Weld Symbols. (114 pages) 161. 10/7/83 Pacific Gas and Electric Company, Discrepancy Report. (2 pages) 162. 10/12/83 Memo for Eisenhut from Bishop, subject: Allegations of Errors in Design / Documentation of Safety Related Structures, Systems and Conporsents, Diablo Canyon Unit 1 Docket No. 50-275. Transfer of Lead Responsibility. (3 pages)

Re: F0; A-84-21 (13ti Fartial)

APPENDIX R (Continued)

RECORDS 8EING PLACED IN PDR 163. 8/23/83 Sufflix Audit Finding Report. (2 pages) 164, 10/18/83 A11egatien No. 29. (1 page) 165. 10/18/83 Allegation No. 32. (1 page) 166. 10/20/83 Allegation No. 37. (1 page) 167. 10/25/83 Allegation Data Form. (9 pages) 168. 10/26/83 Memo for Eisenhut from Bishop, subject: Allegations concerning the Residual Heat Removal System - Ciablo Canyon Ur.its 1 and 2, Docket Nos. 50-275 and SC-323, Allegation No. RV-83A-0047. (2 pages) 169. 10/27/83 A11egaticn or Concern No. 36. (1 page) 170. 10/27/83 Business Card and attached Allegation Data Fora (55 pages) 171. 10/27/83 Allegation No. 55. (1 page) 172. 10/27/83 Allegation No. 35. (1 page) l 173. 10/27/83 Allegation No. 55. (1 ptge) 174. 10/27/83 Allegation or Conc.ern No. 54. (3 pages) 175. 10/27/83 Allegation No. 35. (1 page) 176. 10/27/83 Allegation No. 35. (1 page) 177. 10/83 Affidavit of Charles Stokes. (34 pages) 178. 11/7/83 Diablo Canyon Nuclear Power Plant Quality Control Procedure for Installation and Inspection of St:ud and Shell Concrete Expansion Anchors. (13 pages) 179. 11/83 Handwritten note to Stu from SDR. (1 page) 180. 11/83 Exhibit A, Affidavit of Charles Stokes. (10 pages) 181. 11/4/83 Allegation Data Form. (4 pages) 182. 11/16/83 Stokes Affidavit. (3 pages) 183. 11/17/83 Sumary of Special Insp. Related Information. (3 pages) 184. 11/30/83 Design Change. (65 pages)

Re: F01A-84-21 (13th Partial)

APPENDIX R (Continued)

RECORDS BEING PLACED IN PDR 185. 11/19/83 Allegation Data Form. (1 page) 186. 11/25/83 Allegation No. 50. (1 page) 187. 11/28/83 Inspection and Enforcement Facsimile Transmissicn. (10 pages) 188. 11/29/83 Memo to Ebnetter, subject: PG8E and Contractor Contract / Interface Persons for NRC Team. (1 page) 189. 11/29/83 Misc. Materials. (4 pages) 190. 11/30/83 Ltr to Palladino and Coswissioners from Devine. (41 pages) 191. 11/30/83 Newspaper article. (1 page) 192. 11/30/'3 Allegation No. 49. (1 pege) 193. 12/1/83 Allegation No. 51. (1 page) 194. 12/1/83 Allegation No. 52. (1page) 195. 12/2/83 Diablo Allegations. (1 page) 196. 12/2/83 Ltr to Kranzdorf from Martin. (18 pages) 197. 12/2/83 Allegation Data Form. (3 pages) 198. 12/5/83 Response to allegations. (107 pages) 199. 12/8/83 Memo to Bishop Information. (from Rockwell, subject: NRC Request for 2 pages) 200. 12/8/83 Memo to Nuclear Plant Operations from Etzler, subject:

Design Changes. (42 pages) 201. 12/9/83 Allegation No. 58. (2 pages) 202, 12/9/83 Diablo Canyon Allegations. (222 pages) 203. 12/9/83 Memo to File from McQueen, subject: Conference Call Regarding Kranzdorf Letter. (27 pages) 204. 12/9/83 Support NRR. (1 page)

l l

l l

Re: F0!A-84-21 (13th Partial) .

APPENDIX R l (Continued) I RECORDS BEING PLACED IN PDR  !

i I

205. 12/9/83 Allegation No. 20. (1 page) 206. 12/9/83 -Allegation No. 21. (1 page) 207. 12/9/83 Allegation No. 22. (1 page) 208. 12/22/83 Facsimile Transmittal. (13 pages) 209. 12/23/83 Facsimile Transmittal. (2 pages) 210. 12/28/83 Hese to (unreadable) from Arnolds, subject: Oversize Walis. (2 pages) 211, 12/30/83 Ltr to Kranzdorf from Martin. (18 pages) 212. 1/5/84 Follow-up information to Allegation 191. (SS pages) 213. 1/6/84 Handwritten page with numbers. (1 page) 214. 1/7/84 Sumary of Special Insp. Related Information. (1 page) 215. 1/7/84 Review of 64 Audits conducted by PG&E Q. C. Department.

(267 pages) 216. 1/9/84 Ltr to Martin from Dr. Richard Kranzdorf. (6pages) 217. 1/10/84 Sununary of Special Insp. Related Information. (1 page) l 218. 1/10/84 Susumary of Special Insp. Related Information. (1 page) )

219. 1/10/84 Susanary of Special Insp. Related Information. (1 page) 220. 1/10/84 Summary of Special Insp. Related Information. (1 page) 221, 1/10/84 Sussnary of Special Insp. Related Information. (1 page) 222. 1/10/84 Susanary of Special Insp. Related Information. (1 page) 223. 1/10/84 Summary of Special Insp. Related Information. (1 page) 224. 1/10/84 Susuary of Special Insp. Related Information. (1 page) 225. 1/10/84 Suussary of Special Insp. Related Information. (1 page) 226. 1/10/84 PG&E Discrepancy Report. (4 pages) l l

l

fs: F01A-84-21 (13th Partial)

APPENDIX R (Continued)

RECORDS BEING PLACED IN POR 227. 1/10/84 Interoffice memo to A. Reardon from D. Pailino, subject:

Biscing for 480V Load Centers - DCIEC1376. (86 pages) 228. 1/11/84 Handwritten note "From Ebeneter Sumury". (2 pages) 229. 1/11/84 Memo to Russell from Morsey, subject: Requested OPEG/ CIVIL response to document fMYR C-1338 Unit 1. (13 pges) 230. 1/11/84 Sumary of Special Insp. Related Information. (1page) 231. 1/11/84 Sumary of Special Insp. Related Information. (1 page) 232. 1/11/84 Sumary of Special Insp Related Information. (1 page) 233 '/11/84 Sumary of Special Insp. Related Information. (2 pages) 234. 1/11/84 Facsimile Cover Letter to D. A. Rockwell from W.

Vahlstrom. (4 pages) 235. 1/11/84 Facsimile Cover Letter to D. A. Rockwell from W.

Vahlstrom. (4 pages) 236. 1/11/84 Facsimile Cover Letter to D. A. Rockwell from W.

Vahlstrom. (4 pages) 237. 1/12/84 Meme to Region V from Hoch, subject: SSER 21. (18 pages) 238. 1/17/84 Howard P. Foley Procurement Quality Notes. (2 pages) l 239. 1/17/84 Approved Manufacturer's Historical List. (10 pages) 240. 1/17/84 Minor Variation Report. (1 page) 241, 1/17/84 Summary of Special Insp. Related Information. (1 page) j 242. 1/17/84 Sumary of Special Insp. Related Information. (1 page) I 243. 1/17/84 Min (r Variation Report. (13 pages)  !

244. 1/18/84 Sumary of Special Insp. Related Information. (1page) 245. 1/20/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (2 pages) 246. 1/20/84 1.tr to Martin froe Schuyler, re: Docket No. 50-275, OL-DPR-76. (33 pages)

Re: FOIA-84-21 (13th Partial)

APPENDIX R (Continued)

RECORDS BEING PLACED IN PDR 247. 1/20/84 Allegation or Concern No. 99. (15pages) 248. 1/20/84 Ltr to Martin from Schuyler, re: Decket No. 50-275, OL-DPR-76. (2 pages) 249. 1/27/84 Ltr to Martin from Schuyler, re: Decket No. 50-275, OL-DPR-76. (19 pages) 250, 1/27/84 Ltr to Martin from Schuyler, re: Docket No.30-275, OL-DPR-76. (19 pages) 251, 1/27/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (19 pages) 252. 1/30/84 Ltr to Temple from Urbanik. (1 page) 253, 2/1/84 Ltr to Temple from Urbanik. (2 pages) 254, 2/3/84 Memo for Kirsch thru Ebneter and Durr from Reynolds, subject: Diablo Canyon Special Inspection - 11/30 thru 12/9/83. (2 pages) 255, 2/6/B4 Ltr to Etzler from Mosses, re: Record Storage. (43 pages) 256. 2/6/84 Memo for Hoch from Kirsch, re: SSER-21. (2 pages) 257, 2/7/84 Ltr to Martin from Schuyler, re: Cocket No. 50-275, OL-DPR-76. (1 page) 258.'2/7/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, i OL-DPR-76. (18 pages) j i

259. 2/7/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (5 pages) 260. 2/7/84 Allegation or Concern No. 102. (3 pages) 261. 2/7/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (170 pages) 262, 2/7/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (1 page) ,

l 263. 2/14/84 Motion to Reopen. (3 pages) I 264. 2/15/84 AL Draft. Allegation or Concern No. 57. (13 pages) l

Re: F01 A-84-21 (13th Partial)

APPENDIX R (Continued)

RECORDS BEING PLACED IN PDR 265. 2/16/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (29 pages) 266,2/17/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (6 pages) 267. 2/17/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (5 pages) 268. 2/17/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (1 page) 269. 2/17/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (6 pages) 270. 2/17/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (6 pages) 271. 2/17/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (6 pages) 272. 2/23/84 Allegations Investigation. (12 pages)

P.73. 2/24/84 Ltr to Martin from Hoch, re: Docket No. 50-275, OL-DPR-M. (7 pages) 274. 2/27/84 Conversation Record. (2 pages) 275. 2/27/84 Ltr to Scarano from Kranzdorf. (2 pages) 276. 2/29/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76.- (45 pages) 277. 2/29/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (14 pages) 278. 2/29/84 Ltr to Martin from Schuyler, re: Cocket No. 50-275, OL-DPR-76, t'12 pages) 279. 2/29/84 Ltr to Sr.huyler from Bishop, subject: NRC Ins Diablo Canyen Units Nos. 1 and 2. (4 pages) pectica of

, , ,-, -r.---,---..--,c- -,-

Re: FOIA-84-21 (13th Partial)

APPENDIX R (Continued)

RECORDS BEING PLACED IN PDR 280. 3/1/84 Memo for Commissioners from Dircks,. subject:

Documentation of a Staff Inspection of a Nuclear Services Corporation Audit at Diablo Canyon. (2 pages) 281. 3/5/84 Problem Statement, Allegations Nos. 65 and 167. (14 pages) 282. 3/5/84 Allegation or Concern No. 98. (3 pages) 283, 3/5/84 Problem Statement, Allegation No. 98. (5 pages) 284. 3/6/84 Problem Statement, Allegation No. 60. (1 page) 285. 3/6/84 Problem Staterent, Allegation No. 96. (1 page) 286. 3/6/84 Problem Statement, Allegation Nos. 61 and 102. (1 page) i 287. 3/6/84 Ltr to Martin from Schuyler, re: Docket No. 50-275, OL-DPR-76. (3 pages) 288. 3/7/84 Allegation No. 96. (3 pages) 289. 3/7/84 Problem Statement, Allegations Mos. 54, 59 and 62. (4 1 pages) '

290. 3/8/84 Allegation No. 80. (7 pages)  !

291. 3/8/84 Allegation or Concern No. 127. (3 pages) 292. 3/8/84 Allegation or Concern No. 127. (3 pages) 293. 3/10/84 Allegation or Concern No. 101. '6 pages) 294. 3/12/84 Allegation or Concern No. 2. (1 page) 295,3/12/84 Allegation or Concern No. 1. (1 page) 296. 3/12/84 Allegation or Concern No. 202. (2 pages) l 297. 3/14/84 Allegation or Concern Nos. 92 and 93. (2 pages) 1 298, 3/14/84 Allegation or Concern No. 99. (5 pages) 299. 3/14/84 Allegation or Concern Nos. 92 and 93. (2 pages)  !

l l

I I

- -, , , . _ _ . ___-,.._...,--.-,y-,.---,_y - . , . , . , _. - , . - - . - , --

Re: MIA-84-21 (13th Partial)

APPENDIX R (Continued)

RECORDS BEING PLACED IN PDR 300. 3/15/84 NRC's Staff's Answer to Joint Intervenors' Mo:iem to Augment or, in the Alternative, To Reopen the Record.

(146 pages) 301. 3/16/84 Problem Statement, Allegation No.100. (2 pages' .

302. 3/16/84 Problem Statement, Allegation No. 80. (2 pages) 303. 3/16/84 Problem Statement, Allegation No. 68. (1 page) 304. 3/16/84 Problem Statement, Allegations No.1 and 2. f1 page) 305. 3/16/84 Problem Statement, Allegations No.18 and 19. (1 page) 306. 3/16/84 Problem Statement, Allegations No. 70 and 202. (1 page) 307. 3/16/84 Problem Statement Allegations No. 3 - 8. (3 pages) 308. 3/16/84 Problem Statement, Allegation Nos. 36 and 37. (1 page) 309. 3/16/84 Problem Statement. Allegation Nos. 28-34. (1 page) 310. 3/16/84 Problem Statement, Allegation Nos.10-17. (7 pages) 311. 3/16/84 Problem Statement, Allegation No. 58. (1 page) 312, 3/16/84 Problem Statement. Allegation No. 9. (1 page; 313, 3/16/84 Problem Statement, Allegations No. 55, 79, 82, 85, 84, 95, and 97. (1 page) 314, 3/19/84 Problem Statement, Allegations No. 64, 67. (4 pages) 315. 3/19/84 Problem Statement Allegation No. 69. (2 pages) 316. 3/19/84 Problem Statement, Allegation No. 72. (2 pages) 317. 3/20/84 Problem Statement, Allegations No. 89, 97, 95, 88, 87, 86, 85, 84, 83, 82, 81, 94, and 90. (17 pages) 318. 3/23/84 Ltr to Kranzdorf from Scarano. (1 page) 319. 8/85 NUREG-1151, "Technical Specifications Diablo Canyon Nuclear Power Plant, Units 1 and 2. (500 pages).

, u. - ,,, , _ - , .,_~-,,.--_-,.,_,,-a a ,-7,y --., y , g,,

O Re: FOIA-84-21 (13th Partial) pp (Contirwed)

RECORDS BEING PLACED IN PDR l

320. 10/20/83 Allegation No. 37 - ATS Mc. RV 83-A41. (1 page) 321. 10/20/83 Allegation No. 39 - ATS Mo. RV 83-A47. (1 page)  !

322. 10/20/83 Allegation No. 40 - ATS Mc. RV 83-A47. (1 page) 323. 10/83 Allegation No. 45 - ATS Mo. RV 83-A47. (1 page) 324. Undated Allegation No. 69 - Case Study "C" - Markey Letter. (1 page) 325. 3/26/84 4 pages of transcript re: Discussion /Possible vote on Diablo Canyon Criticality and low paper operation. ,

(4 pages) {

i l

l l

4

- , _ , - . - - - - , .,.7 - - _ ,

- - - - - ,__._._,_,-em_,- _ . , _ .

Re: F0!A-84-21 l (13th Partial) ,

APPENDIX S  ;!

1 RECORDS ALREADY AVAILABLE IN POR

1. Diablo Canyon FSAR Chapter 13 Docket Number 50-275.
2. Inspection Report 50-275/83-32 Accession No. 830223066, l

I j l

i l

i

.)

l i

  • 1 i

Re: F01A-84-21 (13th Partial)  !

APPENDIX T 1 The following ANSI Standards may be purchased from:

American National Standards Institute '

1430 Broadway New York, NY 10018 Phone: (212) 642-4900

1. ANSI Standard N13.1, 1971
2. ANSI Standard ANS3.1, 1981 1

l l

1 i

a

,..,_.--,--n.,

l

\

\

3 GOVEPMMENT ACCOUNTABILITY PROJECT hi +p; e c 2cm (202)236 9362 Mipwd ST OFDcE January 9,1984 3ygq gg hg WI SPPLF mpHAND-DCllhERED $ 4 7119 January 1984 FREEDOM OF INFORMATION ACT REQUEST Director Office of Administration Max g /-lo-P /

U.S. Nuclear Regulatory Comission Washington, D.C. 20555 To Whom It May Concern:

Pursuant to the Freedom of Information Act (FOIA), S U.S.C. 5552, the Government i Accountability Project (GAP) of the Institute for Policy Studies, requests copies j of any and all agency records and information, including but not limited to notes, I letters, memoranda, draf ts, minutes, diaries, logs, calendars, tapes, transcripts, susenaries, interview reports, procedures, instructions, engineering analyses, draw-ings, files, graphs, charts, maps, photographs, agreements, handwritten notes,  ;

studies, data sheets, notebooks, books, telephone messages, computations, voice l recordings, and any other data coepilations, interim and/or final reports, status reports, and any and all other records relevant to and/or generated in connection with the Sfety Evaluation Report related to tha, operation of .tg Diablo &nnyan I Muc W e power Plant M ' pp1,. d t , . h .L a ,1983)

("% This includes, but is not limited to, any and all NRR regulations, cliculations, and judgments used to evaluate any of the allegations referred to in SSER 21. We request that each responsive document be identified by the allega-tion number (s) to which it may rtlate.

If any of the material covered by this request has been destroyed and/or removed,  ;

please provide all surrounding documentation, including but not ilnited to a des- )

cription of the action (s) taken, relevant date(s), and justification (s) for the action (s).

GAP requests that fees be unived, because finding iDformation can be considered as prisnarily benefitting the genersi public." 5 U.S.C. 5552(a)(4)(A). The Government Accountability Project is a non-profit, non' partisan public interest organization concerned with honest and open government. Through legal representation, advice. ,

national conferences, films, publications and public outreach, the Project promotes I whistleblowers as agents of government accountability. Through its Citizens Clinic, ,

GAP offers assistance to local public inttrest and citizens groups who seek to i ensure the health and safety of their cosaunities. The Citizens Clinic is currently assisting citizens groups in the California area concerning the Diablo Canyon Nuclear Power Plant.

For any documents or portions that you deny due to a specific FOIA esemption, please provide an index itesizing and describing the documents or portions of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under 2 /j 7 7 p ( W < W ,?

nj ,/

e t w-y .> p r u J

' ~ ~

e

,\ ,

DiTect:r of Winistration 2 January 9, 1984

' . U.S. Nuclear Regulatory Comission l

Vaughn v. Rosen (1) 484 F.2d 820 (D.C.Cir.1973). cert denied. 415 U.S. 977 (1974),

i We look forward to your response to this request within ten days. ,

l Very truly yours. l

[ %d " " '

l Billie Pirner Garde l Citizens Clinic Director BPG:me r

l l